Colorado Bend Energy Center
3821 South State Highway 60, Wharton, TX 77488Plant Summary Information
Colorado Bend Energy Center is ranked #53 out of 312 natural gas power plants in Texas in terms of total annual net electricity generation.
Colorado Bend Energy Center is comprised of 8 generators and generated 557.3 GWh during the 3-month period between March 2025 to June 2025.
Plant Name | Colorado Bend Energy Center |
---|---|
Utility Name | CER Colorado Bend Energy Partners LP |
Location | Wharton County, TX |
Initial Operation Date | May 2002 |
Last Update | Jun 2025 |
Annual Generation | 2.1 TWh |
Annual Consumption | 20.2 M MMBtu |
Ranked #505 out of 12,327 Power Plants Nationwide | |
Ranked #309 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #69 out of 799 Texas Power Plants | |
Ranked #53 out of 312 Texas Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Colorado Bend Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Colorado Bend Energy Center.
Monthly Net Generation for Colorado Bend Energy Center
Colorado Bend Energy Center Details
Summary Information | |
---|---|
Plant Name | Colorado Bend Energy Center (56350) |
Plant Address | 3821 South State Highway 60, Wharton, TX 77488 |
Utility | CER Colorado Bend Energy Partners LP (56765) |
Latitude, Longitude | 29.2878, -96.0683 |
Generation Dates on File | May 2007 to Jun 2025 |
Initial Operation Date | May 2002 |
Annual Generation | 2.1 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 07-42-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Wells |
Ash Impoundment | No |
Transmission / Distribution Owner | CenterPoint Energy (8901) TX |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name |
ENERGY TRANSFER FUEL LP GULF SOUTH PIPELINE COMPANY LP |
Natural Gas Storage | No |
Generator CT1A Details Operating May 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | CBEC_CC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CBEC_CC1 |
Nameplate Capacity | 90 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 85 MW |
Winter Capacity | 85 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT1B Details Operating May 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | CBEC_CC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CBEC_CC1 |
Nameplate Capacity | 90 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 85 MW |
Winter Capacity | 85 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT2A Details Operating May 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | CBEC_CC2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CBEC_CC2 |
Nameplate Capacity | 90 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 85 MW |
Winter Capacity | 85 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT2B Details Operating May 2002
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | BLK2 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
RTO ISO LMP Node Designation | CBEC_CC2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CBEC_CC2 |
Nameplate Capacity | 90 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 85 MW |
Winter Capacity | 85 MW |
Minimum Load | 45 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2002 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST1 Details Operating May 2007
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | BLK1 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | CBEC_CC1 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CBEC_CC1 |
Nameplate Capacity | 105.1 MW |
Nameplate Power Factor | 0.92 |
Summer Capacity | 103 MW |
Winter Capacity | 103 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2007 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator ST2 Details Operating June 2008
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | BLK2 |
Ownership | Single Owner |
Duct Burners | Yes |
RTO ISO LMP Node Designation | CBEC_CC2 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CBEC_CC2 |
Nameplate Capacity | 115 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 103 MW |
Winter Capacity | 103 MW |
Minimum Load | 35 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2008 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | No |
Generator CT4A Details Operating May 2023
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CBEC_GT11 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CBEC_GT11 |
Nameplate Capacity | 37 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 31 MW |
Winter Capacity | 31 MW |
Minimum Load | 31 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator CT4B Details Operating May 2023
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | CBEC_GT12 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | CBEC_GT12 |
Nameplate Capacity | 37 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 31 MW |
Winter Capacity | 31 MW |
Minimum Load | 31 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Colorado Bend Energy Center Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#299 | Mountainview Generating Station | Redlands, CA | 2.2 TWh |
#300 | Goldendale Generating Station | Goldendale, WA | 2.2 TWh |
#301 | PSEG Sewaren Generating Station | Sewaren, NJ | 2.2 TWh |
#302 | Lost Pines 1 Power Project | Bastrop, TX | 2.2 TWh |
#303 | Holland Energy Facility | Beecher City, IL | 2.2 TWh |
#304 | Magic Valley Generating Station | Edinburg, TX | 2.1 TWh |
#305 | James E. Rogers Energy Complex | Cliffside, NC | 4.3 TWh |
#306 | Stanton Energy Center | Orlando, FL | 4.7 TWh |
#307 | Jackson Generating Station | Jackson, MI | 2.1 TWh |
#308 | Louisiana 1 | Baton Rouge, LA | 2.8 TWh |
#310 | La Paloma Generating Plant | McKittrick, CA | 2.1 TWh |
#311 | Frontera Energy Center | Mission, TX | 2.1 TWh |
#312 | Coyote Springs | Boardman, OR | 2.0 TWh |
#313 | Chesterfield | Chester, VA | 2.1 TWh |
#314 | Sand Hill | Austin, TX | 2.0 TWh |
#315 | Otay Mesa Generating Project | San Diego, CA | 2.0 TWh |
#316 | Haynes | Long Beach, CA | 2.0 TWh |
#317 | Mint Farm Generating Station | Longview, WA | 2.0 TWh |
#318 | Sunrise Power LLC | Fellows, CA | 2.0 TWh |
#319 | Texas City Power Plant | Texas City, TX | 2.0 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Colorado Bend Energy Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Aktina Solar | El Campo, TX | 887.5 GWh | 17 mi |
Bernard Creek Solar | Hungerford, TX | 483.2 GWh | 11.6 mi |
Bovine | Wallis, TX | 16.5 GWh | 23.7 mi |
Brazoria County Solar Project (Danciger) | Damon, TX | 409.2 GWh | 20 mi |
Brazoria West | Damon, TX | 414.5 GWh | 25.3 mi |
Bronson | Beasley, TX | 9.6 GWh | 18.2 mi |
Cascade Solar (TX) | Wharton, TX | 17.3 GWh | 6.3 mi |
Colorado Bend II | Wharton, TX | 6.5 TWh | 0.2 mi |
Cutlass Solar 1 LLC | Richmond, TX | 177.2 GWh | 21.8 mi |
Cutlass Solar II | Richmond, TX | 399.8 GWh | 18.7 mi |
Fighting Jays Solar Project | Needville, TX | 314.8 GWh | 20 mi |
Fort Bend Solar LLC | East Bernard, TX | 469.5 GWh | 19.6 mi |
HEB00292 | Bay City, TX | 246.0 MWh | 22.1 mi |
Newgulf Cogen | NewGulf, TX | 12.7 GWh | 10.3 mi |
Old 300 Solar Center, LLC | Needville, TX | 928.4 GWh | 15 mi |
Prairie Switch Wind LLC | El Campo, TX | 87.3 GWh | 13.6 mi |
Red Tailed Hawk Solar LLC | Pierce, TX | 582.3 GWh | 9.9 mi |
Second Division Solar | West Columbia, TX | 101.9 GWh | 21.3 mi |
Sweeny Cogen Facility | Old Ocean, TX | 3.3 TWh | 24.5 mi |
Wagyu | Damon, TX | 219.8 GWh | 24.9 mi |