Alamo 6
1401 Nevill Cutoff Road, Fort Stockton, TX 79735Plant Summary Information
Alamo 6 is ranked #84 out of 191 solar farms in Texas in terms of total annual net electricity generation.
Alamo 6 generated 57.9 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Alamo 6 |
---|---|
Utility Name | BHE Renewables, LLC |
Location | Pecos County, TX |
Initial Operation Date | March 2017 |
Last Update | May 2025 |
Annual Generation | 238.3 GWh |
Annual Consumption | 895.3 k MMBtu |
Ranked #2,205 out of 12,312 Power Plants Nationwide | |
Ranked #284 out of 6,191 Solar Power Plants Nationwide | |
Ranked #396 out of 796 Texas Power Plants | |
Ranked #84 out of 191 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
OCI Solar Power (2013 to 2016) BHE Renewables, LLC (2017 to 2024) |
Map of Alamo 6
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Alamo 6.
Monthly Net Generation for Alamo 6
Alamo 6 Details
Summary Information | |
---|---|
Plant Name | Alamo 6 (59206) |
Plant Address | 1401 Nevill Cutoff Road, Fort Stockton, TX 79735 |
Utility | BHE Renewables, LLC (59359) |
Latitude, Longitude | 30.99306, -102.27083 |
Generation Dates on File | Jan 2017 to May 2025 |
Initial Operation Date | March 2017 |
Annual Generation | 238.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator OCIA6 Details Operating March 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 105 MW |
Summer Capacity | 116 MW |
Winter Capacity | 116 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Dual Axis Tracking | Yes |
---|---|
DC Net Capacity | 139.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Alamo 6 Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#274 | East Line Solar | Coolidge, AZ | 244.2 GWh |
#275 | Robins Air Force Base Solar | Macon, GA | 242.9 GWh |
#276 | SR Snipesville II | Denton, GA | 242.1 GWh |
#277 | Oak Solar | Gaston, NC | 241.8 GWh |
#278 | Oak Trail Solar, LLC | Moyock, NC | 241.8 GWh |
#279 | Galloway 2 Solar Farm | Paint Rock, TX | 241.7 GWh |
#280 | Honeysuckle Solar Farm | New Carlisle, IN | 241.6 GWh |
#281 | Ivanpah 3 | Nipton, CA | 250.6 GWh |
#282 | Greasewood Solar | Fort Stockton, TX | 239.0 GWh |
#283 | San Pablo Raceway | Lancaster, CA | 238.6 GWh |
#285 | San Juan Solar I | Kirtland, NM | 225.2 GWh |
#286 | Agave | Arlington, AZ | 236.2 GWh |
#287 | RE Mustang LLC | Lemoore, CA | 220.6 GWh |
#288 | East Pecos Solar | McCamey, TX | 232.4 GWh |
#289 | SR Clay, LLC | Fort Gaines, GA | 231.1 GWh |
#290 | Delilah Solar Energy LLC | Bogota, TX | 230.9 GWh |
#291 | Lockhart Solar PV, LLC | Hinkley, CA | 230.6 GWh |
#292 | SR Lumpkin | Lumpkin, GA | 230.3 GWh |
#293 | Assembly Solar II LLC | Lennon, MI | 230.2 GWh |
#294 | Comanche Solar | Pueblo, CO | 229.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Alamo 6.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Castle Gap Solar Hybrid | McCarney, TX | 405.7 GWh | 18.1 mi |
Crane Solar Project | Crane, TX | 414.0 GWh | 18.2 mi |
Desert Sky | Iraan, TX | 496.7 GWh | 12.1 mi |
East Pecos Solar | McCamey, TX | 232.4 GWh | 0.8 mi |
Emerald Grove | Crane, TX | 272.2 GWh | 8.7 mi |
Greasewood II LLC | Girvin, TX | 471.9 GWh | 21.3 mi |
Greasewood Solar | Fort Stockton, TX | 239.0 GWh | 13.1 mi |
High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.1 TWh | 26.2 mi |
Hydra | Fort Stockton, TX | 27.6 GWh | 1.1 mi |
King Mountain Wind Ranch 1 | McCamey, TX | 504.4 GWh | 15 mi |
Midway Solar - TX | Fort Stockton, TX | 331.7 GWh | 2.8 mi |
NWP Indian Mesa Wind Farm | Iraan, TX | 205.6 GWh | 5.9 mi |
Pavo | Fort Stockton, TX | 17.8 GWh | 11.7 mi |
Pearl Solar | Fort Stockton, TX | 104.6 GWh | 0.4 mi |
RE Maplewood | McCamey, TX | 515.8 GWh | 1.4 mi |
Roadrunner, LLC Hybrid | McCamey, TX | 1.1 TWh | 16.3 mi |
Sherbino II | Ft. Stockton, TX | 570.6 GWh | 20.6 mi |
Upton County Solar | McCamey, TX | 336.1 GWh | 17.2 mi |
Woodward Mountain I | Girvin, TX | 168.0 GWh | 9 mi |
Woodward Mountain II | Girvin, TX | 168.0 GWh | 9 mi |