Alamo 6
1401 Nevill Cutoff Road, Fort Stockton, TX 79735Plant Summary Information
Alamo 6 is ranked #74 out of 188 solar farms in Texas in terms of total annual net electricity generation.
Alamo 6 generated 53.8 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Alamo 6 |
---|---|
Utility Name | BHE Renewables, LLC |
Location | Pecos County, TX |
Initial Operation Date | March 2017 |
Last Update | Mar 2025 |
Annual Generation | 243.6 GWh |
Annual Consumption | 892.9 k MMBtu |
Ranked #2,159 out of 12,288 Power Plants Nationwide | |
Ranked #251 out of 6,174 Solar Power Plants Nationwide | |
Ranked #381 out of 788 Texas Power Plants | |
Ranked #74 out of 188 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
OCI Solar Power (2013 to 2016) BHE Renewables, LLC (2017 to 2024) |
Map of Alamo 6
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Alamo 6.
Monthly Net Generation for Alamo 6
Alamo 6 Details
Summary Information | |
---|---|
Plant Name | Alamo 6 (59206) |
Plant Address | 1401 Nevill Cutoff Road, Fort Stockton, TX 79735 |
Utility | BHE Renewables, LLC (59359) |
Latitude, Longitude | 30.99306, -102.27083 |
Generation Dates on File | Jan 2017 to Mar 2025 |
Initial Operation Date | March 2017 |
Annual Generation | 243.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator OCIA6 Details Operating March 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 105 MW |
Summer Capacity | 116 MW |
Winter Capacity | 116 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Dual Axis Tracking | Yes |
---|---|
DC Net Capacity | 139.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Alamo 6 Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#241 | Playa Solar 2 | North Las Vegas, NV | 255.8 GWh |
#242 | Wilmot Energy Center LLC | Tucson, AZ | 252.5 GWh |
#243 | Nebula Solar | La Feria, TX | 254.7 GWh |
#244 | Cavalier Solar | Smithfield, VA | 253.8 GWh |
#245 | East Line Solar | Coolidge, AZ | 250.3 GWh |
#246 | Springbok 3 Solar Farm Hybrid | Cantil, CA | 250.2 GWh |
#247 | Maverick Solar 6, LLC | Desert Center, CA | 238.7 GWh |
#248 | Taylor County Solar | Butler, GA | 245.4 GWh |
#249 | OCI Alamo 7 LLC | Haskell, TX | 245.3 GWh |
#250 | San Pablo Raceway | Lancaster, CA | 245.3 GWh |
#252 | Elara Solar | Pearsall, TX | 243.2 GWh |
#253 | SR Snipesville II | Denton, GA | 242.6 GWh |
#254 | West of the Pecos Solar | TBD, TX | 242.0 GWh |
#255 | East Pecos Solar | McCamey, TX | 241.5 GWh |
#256 | Maverick Solar 4, LLC | Desert Center, CA | 240.9 GWh |
#257 | SR Snipesville III | Denton, GA | 240.5 GWh |
#258 | Willow Spring Solar, LLC | Rosamond, CA | 239.4 GWh |
#259 | Oak Trail Solar, LLC | Moyock, NC | 238.9 GWh |
#260 | Desert Quartzite | Blythe, CA | 231.9 GWh |
#261 | Chesapeake Solar Project | Chesapeake, VA | 237.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Alamo 6.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Castle Gap Solar Hybrid | McCarney, TX | 406.7 GWh | 18.1 mi |
Crane Solar Project | Crane, TX | 411.8 GWh | 18.2 mi |
Desert Sky | Iraan, TX | 496.7 GWh | 12.1 mi |
East Pecos Solar | McCamey, TX | 241.5 GWh | 0.8 mi |
Emerald Grove | Crane, TX | 277.8 GWh | 8.7 mi |
Greasewood II LLC | Girvin, TX | 310.8 GWh | 21.3 mi |
Greasewood Solar | Fort Stockton, TX | 189.7 GWh | 13.1 mi |
High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.2 TWh | 26.2 mi |
Hydra | Fort Stockton, TX | 9.1 GWh | 1.1 mi |
King Mountain Wind Ranch 1 | McCamey, TX | 486.8 GWh | 15 mi |
Midway Solar - TX | Fort Stockton, TX | 330.0 GWh | 2.8 mi |
NWP Indian Mesa Wind Farm | Iraan, TX | 205.6 GWh | 5.9 mi |
Pavo | Fort Stockton, TX | 8.8 GWh | 11.7 mi |
Pearl Solar | Fort Stockton, TX | 104.5 GWh | 0.4 mi |
RE Maplewood | McCamey, TX | 570.5 GWh | 1.4 mi |
Roadrunner, LLC Hybrid | McCamey, TX | 1.1 TWh | 16.3 mi |
Sherbino II | Ft. Stockton, TX | 570.6 GWh | 20.6 mi |
Upton County Solar | McCamey, TX | 345.3 GWh | 17.2 mi |
Woodward Mountain I | Girvin, TX | 168.0 GWh | 9 mi |
Woodward Mountain II | Girvin, TX | 168.0 GWh | 9 mi |