1401 Nevill Cutoff Road, Fort Stockton, TX 79735Plant Summary Information
Alamo 6 is ranked #52 out of 150 solar farms in Texas in terms of total annual net electricity generation.
Alamo 6 generated 61.5 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Alamo 6 |
---|---|
Utility Name | BHE Renewables, LLC |
Location | Pecos County, TX |
Initial Operation Date | March 2017 |
Last Update | Feb 2024 |
Annual Generation | 259.1 GWh |
Annual Consumption | 883.9 k MMBtu |
Ranked #2,060 out of 11,455 Power Plants Nationwide | |
Ranked #179 out of 5,173 Solar Power Plants Nationwide | |
Ranked #356 out of 726 Texas Power Plants | |
Ranked #52 out of 150 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
OCI Solar Power (2013 to 2016) BHE Renewables, LLC (2017 to 2022) |
Map of Alamo 6
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Alamo 6.
Monthly Net Generation for Alamo 6
Alamo 6 Details
Summary Information | |
---|---|
Plant Name | Alamo 6 (59206) |
Plant Address | 1401 Nevill Cutoff Road Fort Stockton, TX 79735 |
Utility | BHE Renewables, LLC (59359) |
Latitude, Longitude | 30.99306, -102.27083 |
Generation Dates on File | Jan 2017 to Feb 2024 |
Initial Operation Date | March 2017 |
Annual Generation | 259.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator OCIA6 Details Operating March 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 105 MW |
Summer Capacity | 116 MW |
Winter Capacity | 116 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | March 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Dual Axis Tracking | Yes |
---|---|
DC Net Capacity | 139.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Alamo 6 Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#169 | Rabbitbrush Solar, LLC | Rosamond, CA | 268.5 GWh |
#170 | Battle Mountain Solar Project | Battle Mountain, NV | 268.6 GWh |
#171 | CA Flats Solar 130, LLC | Shandon, CA | 270.8 GWh |
#172 | OCI Alamo 7 LLC | Haskell, TX | 269.9 GWh |
#173 | Wood County | Nekoosa, WI | 268.5 GWh |
#174 | Playa Solar 2 | North Las Vegas, NV | 266.8 GWh |
#175 | Valentine Solar, LLC | Rosamond, CA | 265.5 GWh |
#176 | Fish Springs | Reno, NV | 254.1 GWh |
#177 | East Line Solar | Coolidge, AZ | 262.7 GWh |
#178 | BigBeau Solar, LLC | Rosamond, CA | 256.4 GWh |
#180 | SR Snipesville II | Denton, GA | 256.0 GWh |
#181 | Willow Spring Solar, LLC | Rosamond, CA | 255.2 GWh |
#182 | Dressor Plains Solar, LLC | Herrick, IL | 251.9 GWh |
#183 | San Pablo Raceway | Lancaster, CA | 251.9 GWh |
#184 | Prairie State Solar Project | Swanwick Township, IL | 250.4 GWh |
#185 | SR Clay, LLC | Fort Gaines, GA | 250.2 GWh |
#186 | Copper Mountain Solar 4, LLC | Boulder City, NV | 249.7 GWh |
#187 | Springbok 3 Solar Farm Hybrid | Cantil, CA | 249.3 GWh |
#188 | Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 235.5 GWh |
#189 | West of the Pecos Solar | TBD, TX | 247.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Alamo 6.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Appaloosa Run Wind | Rankin, TX | 746.2 GWh | 28.4 mi |
Buckthorn Westex | Ft. Stockton, TX | 375.6 GWh | 33.3 mi |
Castle Gap Solar Hybrid | McCarney, TX | 423.2 GWh | 18.1 mi |
CED Crane Solar | Crane, TX | 433.6 GWh | 18.2 mi |
Desert Sky | Iraan, TX | 536.3 GWh | 12.1 mi |
East Pecos Solar | McCamey, TX | 284.8 GWh | 0.8 mi |
Emerald Grove | Crane, TX | 306.0 GWh | 8.7 mi |
Greasewood Solar | Fort Stockton, TX | 219.3 GWh | 13.1 mi |
High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.2 TWh | 26.2 mi |
King Mountain Wind Ranch 1 | McCamey, TX | 612.0 GWh | 15 mi |
Midway Solar - TX | Fort Stockton, TX | 309.2 GWh | 2.8 mi |
NWP Indian Mesa Wind Farm | Iraan, TX | 225.7 GWh | 5.9 mi |
Pearl Solar | Fort Stockton, TX | 101.6 GWh | 0.4 mi |
RE Maplewood | McCamey, TX | 489.1 GWh | 1.4 mi |
Roadrunner, LLC Hybrid | McCamey, TX | 1.1 TWh | 16.3 mi |
Sherbino II | Ft. Stockton, TX | 613.1 GWh | 20.6 mi |
Upton County Solar | McCamey, TX | 302.1 GWh | 17.2 mi |
WAL897 | Fort Stockton, TX | 133.1 MWh | 38.3 mi |
Woodward Mountain I | Girvin, TX | 193.8 GWh | 9 mi |
Woodward Mountain II | Girvin, TX | 184.4 GWh | 9 mi |