Alamo 6
1401 Nevill Cutoff Road, Fort Stockton, TX 79735Plant Summary Information
Alamo 6 is ranked #104 out of 204 solar farms in Texas in terms of total annual net electricity generation.
Alamo 6 generated 57.8 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Alamo 6 |
|---|---|
| Utility Name | BHE Renewables, LLC |
| Location | Pecos County, TX |
| Initial Operation Date | March 2017 |
| Last Update | Oct 2025 |
| Annual Generation | 226.6 GWh |
| Annual Consumption | 838.3 k MMBtu |
| Ranked #2,322 out of 12,553 Power Plants Nationwide | |
| Ranked #365 out of 6,410 Solar Power Plants Nationwide | |
| Ranked #420 out of 804 Texas Power Plants | |
| Ranked #104 out of 204 Texas Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
OCI Solar Power (2013 to 2016) BHE Renewables, LLC (2017 to 2024) |
Map of Alamo 6
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Alamo 6.
Monthly Net Generation for Alamo 6
Alamo 6 Details
| Summary Information | |
|---|---|
| Plant Name | Alamo 6 (59206) |
| Plant Address | 1401 Nevill Cutoff Road, Fort Stockton, TX 79735 |
| Utility | BHE Renewables, LLC (59359) |
| Latitude, Longitude | 30.99306, -102.27083 |
| Generation Dates on File | Jan 2017 to Oct 2025 |
| Initial Operation Date | March 2017 |
| Annual Generation | 226.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator OCIA6 Details Operating March 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 105 MW |
| Summer Capacity | 116 MW |
| Winter Capacity | 116 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2017 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Dual Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 139.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Alamo 6 Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #355 | Quartz Solar, LLC | Wynne, AR | 232.4 GWh |
| #356 | SR Lumpkin | Lumpkin, GA | 231.7 GWh |
| #357 | San Pablo Raceway | Lancaster, CA | 231.4 GWh |
| #358 | Bayou Galion Solar Project | Mer Rouge, LA | 230.3 GWh |
| #359 | Dressor Plains Solar, LLC | Herrick, IL | 230.0 GWh |
| #360 | Comanche Solar | Pueblo, CO | 229.3 GWh |
| #361 | BPL Files Solar | Itasca, TX | 228.8 GWh |
| #362 | Prairie Mist Solar | Montrose, AR | 228.0 GWh |
| #363 | Three Peaks Power | Cedar City, UT | 227.1 GWh |
| #364 | Ivanpah 3 | Nipton, CA | 235.6 GWh |
| #366 | Albemarle Beach Solar | Roper, NC | 226.1 GWh |
| #367 | SR Arlington II | Blakely, GA | 226.1 GWh |
| #368 | Assembly Solar II LLC | Lennon, MI | 223.7 GWh |
| #369 | Techren Solar I LLC | Boulder, NV | 223.7 GWh |
| #370 | Lapetus | Andrews, TX | 223.6 GWh |
| #371 | Lamesa Solar | Lamesa, TX | 223.4 GWh |
| #372 | SR Clay, LLC | Fort Gaines, GA | 222.7 GWh |
| #373 | Prairie State Solar Project | Swanwick Township, IL | 222.5 GWh |
| #374 | Robins Air Force Base Solar | Macon, GA | 221.7 GWh |
| #375 | Butler Solar Project 103 | Butler, GA | 221.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Alamo 6.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Appaloosa Run Wind | Rankin, TX | 707.5 GWh | 28.4 mi |
| Buckthorn Westex | Ft. Stockton, TX | 355.4 GWh | 33.3 mi |
| Castle Gap Solar Hybrid | McCarney, TX | 385.5 GWh | 18.1 mi |
| Crane Solar Project | Crane, TX | 407.9 GWh | 18.2 mi |
| Desert Sky | Iraan, TX | 496.7 GWh | 12.1 mi |
| East Pecos Solar | McCamey, TX | 214.7 GWh | 0.8 mi |
| Emerald Grove | Crane, TX | 256.8 GWh | 8.7 mi |
| Greasewood II LLC | Girvin, TX | 792.9 GWh | 21.3 mi |
| Greasewood Solar | Fort Stockton, TX | 378.8 GWh | 13.1 mi |
| High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.2 TWh | 26.2 mi |
| King Mountain Wind Ranch 1 | McCamey, TX | 555.4 GWh | 15 mi |
| Midway Solar - TX | Fort Stockton, TX | 336.0 GWh | 2.8 mi |
| NWP Indian Mesa Wind Farm | Iraan, TX | 205.6 GWh | 5.9 mi |
| Pearl Solar | Fort Stockton, TX | 99.4 GWh | 0.4 mi |
| RE Maplewood | McCamey, TX | 522.5 GWh | 1.4 mi |
| Roadrunner, LLC Hybrid | McCamey, TX | 1.1 TWh | 16.3 mi |
| Sherbino II | Ft. Stockton, TX | 570.6 GWh | 20.6 mi |
| Upton County Solar | McCamey, TX | 299.6 GWh | 17.2 mi |
| Woodward Mountain I | Girvin, TX | 168.0 GWh | 9 mi |
| Woodward Mountain II | Girvin, TX | 168.0 GWh | 9 mi |