SolaireHolman Solar Project
89287 US Hwy 67, Alpine, TX 79830Plant Summary Information
SolaireHolman Solar Project is ranked #136 out of 219 solar farms in Texas in terms of total annual net electricity generation.
SolaireHolman Solar Project generated 20.7 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | SolaireHolman Solar Project |
|---|---|
| Utility Name | SolaireHolman 1, LLC |
| Location | Brewster County, TX |
| Initial Operation Date | April 2017 |
| Last Update | Feb 2026 |
| Annual Generation | 102.6 GWh |
| Annual Consumption | 382.1 k MMBtu |
| Ranked #3,417 out of 12,637 Power Plants Nationwide | |
| Ranked #826 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #500 out of 820 Texas Power Plants | |
| Ranked #136 out of 219 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of SolaireHolman Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for SolaireHolman Solar Project.
Monthly Net Generation for SolaireHolman Solar Project
Monthly Plant Fuel Consumption for SolaireHolman Solar Project
SolaireHolman Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | SolaireHolman Solar Project (60989) |
| Plant Address | 89287 US Hwy 67, Alpine, TX 79830 |
| Utility | SolaireHolman 1, LLC (60636) |
| Latitude, Longitude | 30.45512, -103.4747 |
| Generation Dates on File | Apr 2017 to Feb 2026 |
| Initial Operation Date | April 2017 |
| Annual Generation | 102.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator PV1 Details Operating April 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 64.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
SolaireHolman Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #816 | Sherco Solar II | Becker, MN | 104.4 GWh |
| #817 | SR Turkey Creek, LLC | Lancaster, KY | 104.4 GWh |
| #818 | Foothills Solar Plant Hybrid | Yuma, AZ | 97.8 GWh |
| #819 | Salt City Solar Project - Hybrid | Circleville, OH | 104.0 GWh |
| #820 | Sugar Solar, LLC | Yadkinville, NC | 103.8 GWh |
| #821 | Norton Solar Farm | Bronte, TX | 103.7 GWh |
| #822 | Pine Forest Solar I | Pickton, TX | 99.6 GWh |
| #823 | Red Horse 2 | Willcox, AZ | 149.5 GWh |
| #824 | Appaloosa Solar I | Cedar City, UT | 103.0 GWh |
| #825 | Edwards Sanborn S1 | Mojave, CA | 100.4 GWh |
| #827 | Kimmel Road Solar, LLC | Du Quoin, IL | 102.6 GWh |
| #828 | Mountain View Solar (FL) | Dade City, FL | 102.1 GWh |
| #829 | Pitts Dudik Solar | Hubbard, TX | 102.0 GWh |
| #830 | Bladen Solar | Fayetteville, NC | 101.5 GWh |
| #831 | Assembly Solar Project | Venice Township, MI | 101.5 GWh |
| #832 | Luning Energy | Luning, NV | 101.4 GWh |
| #833 | Elevation Solar C | Lancaster, CA | 101.3 GWh |
| #834 | Bear Creek (WI) | Lone Rock, WI | 100.4 GWh |
| #835 | Beaver Dam Solar | Dodge, WI | 100.2 GWh |
| #836 | Timber Road Solar Park | Payne, OH | 99.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding SolaireHolman Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alamo 6 | Fort Stockton, TX | 220.8 GWh | 80.6 mi |
| Barilla Solar | Fort Stockton, TX | 53.7 GWh | 35.7 mi |
| Bryan Solar, LLC | Presidio, TX | 23.4 GWh | 77 mi |
| Buckthorn Westex | Ft. Stockton, TX | 341.4 GWh | 55.6 mi |
| East Pecos Solar | McCamey, TX | 220.2 GWh | 80.3 mi |
| Emerald Grove | Crane, TX | 251.9 GWh | 79.5 mi |
| Greasewood II LLC | Girvin, TX | 846.1 GWh | 68.3 mi |
| Greasewood Solar | Fort Stockton, TX | 432.9 GWh | 70.8 mi |
| Midway Solar - TX | Fort Stockton, TX | 318.8 GWh | 83.2 mi |
| NWP Indian Mesa Wind Farm | Iraan, TX | 205.6 GWh | 82.5 mi |
| Pearl Solar | Fort Stockton, TX | 93.7 GWh | 80.6 mi |
| RE Maplewood | McCamey, TX | 513.6 GWh | 80.8 mi |
| RE Roserock | Fort Stockton, TX | 372.2 GWh | 36.3 mi |
| Sherbino II | Ft. Stockton, TX | 570.6 GWh | 61.6 mi |
| Taygete Energy Project LLC | Coyanosa, TX | 544.7 GWh | 53.3 mi |
| Taygete II Energy Project | Coyanosa, TX | 457.0 GWh | 54.5 mi |
| WAL897 | Fort Stockton, TX | 103.0 MWh | 45.5 mi |
| West of the Pecos Solar | TBD, TX | 237.8 GWh | 69.1 mi |
| Woodward Mountain I | Girvin, TX | 168.0 GWh | 71.7 mi |
| Woodward Mountain II | Girvin, TX | 168.0 GWh | 71.7 mi |