Rambler
8999 Jeremiah Lane, San Angelo, TX 76901Plant Summary Information
Rambler is ranked #43 out of 191 solar farms in Texas in terms of total annual net electricity generation.
Rambler generated 77.7 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Rambler |
---|---|
Utility Name | Duke Energy Renewables Services |
Location | Tom Green County, TX |
Initial Operation Date | June 2020 |
Last Update | May 2025 |
Annual Generation | 411.8 GWh |
Annual Consumption | 1.5 M MMBtu |
Ranked #1,504 out of 12,312 Power Plants Nationwide | |
Ranked #117 out of 6,191 Solar Power Plants Nationwide | |
Ranked #295 out of 796 Texas Power Plants | |
Ranked #43 out of 191 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
RE Rambler LLC (2018 to 2021) Duke Energy Renewables Services (2022 to 2024) |
Map of Rambler
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rambler.
Monthly Net Generation for Rambler
Rambler Details
Summary Information | |
---|---|
Plant Name | Rambler (62141) |
Plant Address | 8999 Jeremiah Lane, San Angelo, TX 76901 |
Utility | Duke Energy Renewables Services (65411) |
Latitude, Longitude | 31.517, -100.6 |
Generation Dates on File | Jun 2020 to May 2025 |
Initial Operation Date | June 2020 |
Annual Generation | 411.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator RMBLR Details Operating June 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 266 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Rambler Plant Owners
Owner Name | Address | Ownership |
---|---|---|
RE Rambler, LLC | 550 S. Caldwell Street, NAS09, Suite 925, Charlotte, NC 28202 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#107 | Pike Solar Hybrid | Fountain, CO | 434.1 GWh |
#108 | Hickory Park Solar Hybrid | Camilla, GA | 427.0 GWh |
#109 | Muscle Shoals | Cherokee, AL | 425.4 GWh |
#110 | Twiggs Solar | Dry Branch, GA | 420.3 GWh |
#111 | Desert Quartzite | Blythe, CA | 408.3 GWh |
#112 | Brazoria West | Damon, TX | 417.0 GWh |
#113 | Atrisco Solar LLC | Rio Rancho, NM | 414.3 GWh |
#114 | Crane Solar Project | Crane, TX | 414.0 GWh |
#115 | Big Cypress Solar, LLC | Crawfordsville, AR | 413.4 GWh |
#116 | Brazoria County Solar Project (Danciger) | Damon, TX | 413.1 GWh |
#118 | Tres Bahias | Port Lavaca, TX | 410.1 GWh |
#119 | Mount Signal Solar Farm II | Calexico, CA | 407.0 GWh |
#120 | Castle Gap Solar Hybrid | McCarney, TX | 405.7 GWh |
#121 | Riverstart Solar Park LLC | Modoc, IN | 405.0 GWh |
#122 | Yellow Pine Solar | Enterprise, NV | 389.3 GWh |
#123 | Sun Streams, LLC | Arlington, AZ | 402.1 GWh |
#124 | Mesquite Solar 1 | Tonopah, AZ | 401.4 GWh |
#125 | Chestnut | Lemoore, CA | 374.8 GWh |
#126 | Big Plain Solar, LLC | London, OH | 399.0 GWh |
#127 | Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Rambler.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Angelo Solar | San Angelo, TX | 202.9 GWh | 1.3 mi |
Aviator Wind | Robert Lee, TX | 1.6 TWh | 19.9 mi |
Bluebell Solar | Sterling City, TX | 67.4 GWh | 27.8 mi |
Bluebell Solar II | Sterling, TX | 260.8 GWh | 28.8 mi |
Cactus Flats Wind Energy Project | Eden, TX | 465.7 GWh | 43.8 mi |
Capricorn Ridge Wind LLC | Sterling City, TX | 1.9 TWh | 38.8 mi |
Concho Valley Solar, LLC | San Angelo, TX | 304.5 GWh | 29.2 mi |
Galloway 1 Solar Farm | Paint Rock, TX | 534.9 GWh | 47.7 mi |
Galloway 2 Solar Farm | Paint Rock, TX | 241.7 GWh | 41.4 mi |
Goat Wind LP | Sterling City, TX | 222.5 GWh | 32.1 mi |
Holstein 1 Solar Farm | Wingate, TX | 379.4 GWh | 48 mi |
Jameson Gas Processing Plant | Silver, TX | 12.9 GWh | 37.2 mi |
Lacy Creek Wind Energy Center | Sterling City, TX | 1.2 TWh | 43.7 mi |
Langford Wind Power | Christoval, TX | 572.9 GWh | 30.2 mi |
Live Oak Wind Project | Eldorado, TX | 766.8 GWh | 32.4 mi |
Maryneal Windpower | Maryneal, TX | 595.0 GWh | 47.6 mi |
Maverick Creek Wind | Eden, TX | 1.4 TWh | 47.9 mi |
Panther Creek Wind Farm Three | Big Spring, TX | 706.2 GWh | 44.7 mi |
Santa Rita East | Barnhart, TX | 1.2 TWh | 36.9 mi |
Santa Rita Wind Energy | Big Lake, TX | 1.1 TWh | 48.3 mi |