East Pecos Solar
7220 Nevill Road, McCamey, TX 75792Plant Summary Information
East Pecos Solar is ranked #49 out of 150 solar farms in Texas in terms of total annual net electricity generation.
East Pecos Solar generated 64.2 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | East Pecos Solar |
---|---|
Utility Name | Southern Power Co |
Location | Pecos County, TX |
Initial Operation Date | April 2017 |
Last Update | Feb 2024 |
Annual Generation | 284.8 GWh |
Annual Consumption | 971.8 k MMBtu |
Ranked #1,957 out of 11,455 Power Plants Nationwide | |
Ranked #154 out of 5,173 Solar Power Plants Nationwide | |
Ranked #337 out of 726 Texas Power Plants | |
Ranked #49 out of 150 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of East Pecos Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for East Pecos Solar.
Monthly Net Generation for East Pecos Solar
East Pecos Solar Details
Summary Information | |
---|---|
Plant Name | East Pecos Solar (60436) |
Plant Address | 7220 Nevill Road McCamey, TX 75792 |
Utility | Southern Power Co (17650) |
Latitude, Longitude | 31.00088, -102.28174 |
Generation Dates on File | Mar 2017 to Feb 2024 |
Initial Operation Date | April 2017 |
Annual Generation | 284.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG16-127-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Electric Transmission Texas LLC (50174) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator 1 Details Operating April 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 118.5 MW |
Summer Capacity | 118.5 MW |
Winter Capacity | 118.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 142.8 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
East Pecos Solar Plant Owners
Owner Name | Address | Ownership |
---|---|---|
East Pecos Solar, LLC | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#144 | Nebula Solar | La Feria, TX | 298.7 GWh |
#145 | Wistaria Ranch Solar | Calexico, CA | 294.2 GWh |
#146 | Quinto Solar PV Project | Gustine, CA | 293.1 GWh |
#147 | Dougherty County Solar, LLC | Albany, GA | 290.4 GWh |
#148 | Maverick Solar 6, LLC | Desert Center, CA | 286.4 GWh |
#149 | West Line Solar, LLC | City of Eloy, AZ | 289.3 GWh |
#150 | American Kings Solar, LLC | Lemoore, CA | 287.5 GWh |
#151 | Hunter Solar LLC (UT) | Clawson, UT | 287.0 GWh |
#152 | Mesquite Solar 2, LLC | Tonopah, AZ | 285.1 GWh |
#153 | Wilmot Energy Center LLC | Tucson, AZ | 282.0 GWh |
#155 | RE Astoria | Rosamond, CA | 283.8 GWh |
#156 | Colonial Trail West | Spring Grove, VA | 283.0 GWh |
#157 | Maverick Solar 4, LLC | Desert Center, CA | 282.6 GWh |
#158 | Jackpot Solar, LLC | Twin Falls, ID | 281.9 GWh |
#159 | Saint Solar | Coolidge, AZ | 278.3 GWh |
#160 | Briar Creek Solar 1 | Corsicana, TX | 278.2 GWh |
#161 | Catalina Solar LLC | Rosamond, CA | 277.7 GWh |
#162 | Comanche Solar | Pueblo, CO | 276.5 GWh |
#163 | Taylor County Solar | Butler, GA | 276.2 GWh |
#164 | Boulder Solar Power, LLC | Boulder City, NV | 275.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding East Pecos Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo 6 | Fort Stockton, TX | 259.1 GWh | 0.8 mi |
Appaloosa Run Wind | Rankin, TX | 746.2 GWh | 28.7 mi |
Buckthorn Westex | Ft. Stockton, TX | 375.6 GWh | 33.5 mi |
Castle Gap Solar Hybrid | McCarney, TX | 423.2 GWh | 17.6 mi |
CED Crane Solar | Crane, TX | 433.6 GWh | 17.6 mi |
Desert Sky | Iraan, TX | 536.3 GWh | 12.9 mi |
Emerald Grove | Crane, TX | 306.0 GWh | 7.9 mi |
Greasewood Solar | Fort Stockton, TX | 219.3 GWh | 12.4 mi |
High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.2 TWh | 26.5 mi |
King Mountain Wind Ranch 1 | McCamey, TX | 612.0 GWh | 14.6 mi |
Midway Solar - TX | Fort Stockton, TX | 309.2 GWh | 3.5 mi |
NWP Indian Mesa Wind Farm | Iraan, TX | 225.7 GWh | 6.8 mi |
Pearl Solar | Fort Stockton, TX | 101.6 GWh | 1.2 mi |
RE Maplewood | McCamey, TX | 489.1 GWh | 2.2 mi |
Roadrunner, LLC Hybrid | McCamey, TX | 1.1 TWh | 16 mi |
Sherbino II | Ft. Stockton, TX | 613.1 GWh | 20.6 mi |
Upton County Solar | McCamey, TX | 302.1 GWh | 16.7 mi |
WAL897 | Fort Stockton, TX | 133.1 MWh | 37.8 mi |
Woodward Mountain I | Girvin, TX | 193.8 GWh | 8.6 mi |
Woodward Mountain II | Girvin, TX | 184.4 GWh | 8.6 mi |