East Pecos Solar
7220 Nevill Road, McCamey, TX 75792Plant Summary Information
East Pecos Solar is ranked #77 out of 188 solar farms in Texas in terms of total annual net electricity generation.
East Pecos Solar generated 49.4 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | East Pecos Solar |
---|---|
Utility Name | Southern Power Co |
Location | Pecos County, TX |
Initial Operation Date | April 2017 |
Last Update | Mar 2025 |
Annual Generation | 241.5 GWh |
Annual Consumption | 896.6 k MMBtu |
Ranked #2,169 out of 12,288 Power Plants Nationwide | |
Ranked #255 out of 6,174 Solar Power Plants Nationwide | |
Ranked #385 out of 788 Texas Power Plants | |
Ranked #77 out of 188 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of East Pecos Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for East Pecos Solar.
Monthly Net Generation for East Pecos Solar
East Pecos Solar Details
Summary Information | |
---|---|
Plant Name | East Pecos Solar (60436) |
Plant Address | 7220 Nevill Road, McCamey, TX 75792 |
Utility | Southern Power Co (17650) |
Latitude, Longitude | 31.00088, -102.28174 |
Generation Dates on File | Mar 2017 to Mar 2025 |
Initial Operation Date | April 2017 |
Annual Generation | 241.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG16-127-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Electric Transmission Texas LLC (50174) |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator 1 Details Operating April 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 118.5 MW |
Summer Capacity | 118.5 MW |
Winter Capacity | 118.5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2017 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 142.8 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
East Pecos Solar Plant Owners
Owner Name | Address | Ownership |
---|---|---|
East Pecos Solar, LLC | 30 Ivan Allen Jr. Blvd, NW, Atlanta, GA 30308 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#245 | East Line Solar | Coolidge, AZ | 250.3 GWh |
#246 | Springbok 3 Solar Farm Hybrid | Cantil, CA | 250.2 GWh |
#247 | Maverick Solar 6, LLC | Desert Center, CA | 238.7 GWh |
#248 | Taylor County Solar | Butler, GA | 245.4 GWh |
#249 | OCI Alamo 7 LLC | Haskell, TX | 245.3 GWh |
#250 | San Pablo Raceway | Lancaster, CA | 245.3 GWh |
#251 | Alamo 6 | Fort Stockton, TX | 243.6 GWh |
#252 | Elara Solar | Pearsall, TX | 243.2 GWh |
#253 | SR Snipesville II | Denton, GA | 242.6 GWh |
#254 | West of the Pecos Solar | TBD, TX | 242.0 GWh |
#256 | Maverick Solar 4, LLC | Desert Center, CA | 240.9 GWh |
#257 | SR Snipesville III | Denton, GA | 240.5 GWh |
#258 | Willow Spring Solar, LLC | Rosamond, CA | 239.4 GWh |
#259 | Oak Trail Solar, LLC | Moyock, NC | 238.9 GWh |
#260 | Desert Quartzite | Blythe, CA | 231.9 GWh |
#261 | Chesapeake Solar Project | Chesapeake, VA | 237.2 GWh |
#262 | RE Mustang LLC | Lemoore, CA | 220.6 GWh |
#263 | CA Flats Solar 130, LLC | Shandon, CA | 233.3 GWh |
#264 | Prairie State Solar Project | Swanwick Township, IL | 233.2 GWh |
#265 | Comanche Solar | Pueblo, CO | 233.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding East Pecos Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo 6 | Fort Stockton, TX | 243.6 GWh | 0.8 mi |
Castle Gap Solar Hybrid | McCarney, TX | 406.7 GWh | 17.6 mi |
Crane Solar Project | Crane, TX | 411.8 GWh | 17.6 mi |
Desert Sky | Iraan, TX | 496.7 GWh | 12.9 mi |
Emerald Grove | Crane, TX | 277.8 GWh | 7.9 mi |
Greasewood II LLC | Girvin, TX | 310.8 GWh | 20.5 mi |
Greasewood Solar | Fort Stockton, TX | 189.7 GWh | 12.4 mi |
High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.2 TWh | 26.5 mi |
Hydra | Fort Stockton, TX | 9.1 GWh | 0.7 mi |
King Mountain Wind Ranch 1 | McCamey, TX | 486.8 GWh | 14.6 mi |
Midway Solar - TX | Fort Stockton, TX | 330.0 GWh | 3.5 mi |
NWP Indian Mesa Wind Farm | Iraan, TX | 205.6 GWh | 6.8 mi |
Pavo | Fort Stockton, TX | 8.8 GWh | 11.6 mi |
Pearl Solar | Fort Stockton, TX | 104.5 GWh | 1.2 mi |
RE Maplewood | McCamey, TX | 570.5 GWh | 2.2 mi |
Roadrunner, LLC Hybrid | McCamey, TX | 1.1 TWh | 16 mi |
Sherbino II | Ft. Stockton, TX | 570.6 GWh | 20.6 mi |
Upton County Solar | McCamey, TX | 345.3 GWh | 16.7 mi |
Woodward Mountain I | Girvin, TX | 168.0 GWh | 8.6 mi |
Woodward Mountain II | Girvin, TX | 168.0 GWh | 8.6 mi |