Pearl Solar
1401 Nevill Cutoff Road, Fort Stockton, TX 79735Plant Summary Information
Pearl Solar is ranked #119 out of 194 solar farms in Texas in terms of total annual net electricity generation.
Pearl Solar generated 29.3 GWh during the 3-month period between March 2025 to June 2025.
Plant Name | Pearl Solar |
---|---|
Utility Name | BHE Renewables, LLC |
Location | Pecos County, TX |
Initial Operation Date | October 2017 |
Last Update | Jun 2025 |
Annual Generation | 103.4 GWh |
Annual Consumption | 390.2 k MMBtu |
Ranked #3,303 out of 12,327 Power Plants Nationwide | |
Ranked #735 out of 6,200 Solar Power Plants Nationwide | |
Ranked #476 out of 799 Texas Power Plants | |
Ranked #119 out of 194 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
OCI Solar Power (2016 to 2016) BHE Renewables, LLC (2017 to 2024) |
Map of Pearl Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pearl Solar.
Monthly Net Generation for Pearl Solar
Pearl Solar Details
Summary Information | |
---|---|
Plant Name | Pearl Solar (60682) |
Plant Address | 1401 Nevill Cutoff Road, Fort Stockton, TX 79735 |
Utility | BHE Renewables, LLC (59359) |
Latitude, Longitude | 30.98784, -102.26831 |
Generation Dates on File | Aug 2017 to Jun 2025 |
Initial Operation Date | October 2017 |
Annual Generation | 103.4 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator PEARL Details Operating October 2017
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | October 2017 |
---|---|
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 66.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Pearl Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#725 | SR Turkey Creek, LLC | Lancaster, KY | 105.8 GWh |
#726 | Sugar Solar, LLC | Yadkinville, NC | 105.4 GWh |
#727 | Sumrall II Solar Farm | Sumrall, MS | 105.0 GWh |
#728 | Bladen Solar | Fayetteville, NC | 105.0 GWh |
#729 | Sunflower County | Ruleville, MS | 105.0 GWh |
#730 | Coral Farms Solar Energy Center | Florahome, FL | 104.2 GWh |
#731 | Foothills Solar Plant Hybrid | Yuma, AZ | 97.8 GWh |
#732 | Ranchland Solar, LLC | Moyock, NC | 103.9 GWh |
#733 | Assembly Solar Project | Venice Township, MI | 103.7 GWh |
#734 | Mountain View Solar (FL) | Dade City, FL | 103.4 GWh |
#736 | Hendry Isles | TBD, FL | 103.3 GWh |
#737 | Salt City Solar Project - Hybrid | Circleville, OH | 103.0 GWh |
#738 | Kayak | TBD, FL | 103.0 GWh |
#739 | Little Manatee River Solar | Ruskin, FL | 102.7 GWh |
#740 | Fairbanks Solar Project | Fairbanks, IN | 102.4 GWh |
#741 | Elevation Solar C | Lancaster, CA | 102.3 GWh |
#742 | Five Points Solar Park | Five Points, CA | 102.0 GWh |
#743 | Second Division Solar | West Columbia, TX | 101.9 GWh |
#744 | Hog Bay | TBD, FL | 101.9 GWh |
#745 | Bullock Solar, LLC | Manson, NC | 101.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pearl Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo 6 | Fort Stockton, TX | 233.9 GWh | 0.4 mi |
Castle Gap Solar Hybrid | McCarney, TX | 403.5 GWh | 18.5 mi |
Crane Solar Project | Crane, TX | 410.9 GWh | 18.6 mi |
Desert Sky | Iraan, TX | 496.7 GWh | 11.8 mi |
East Pecos Solar | McCamey, TX | 225.8 GWh | 1.2 mi |
Emerald Grove | Crane, TX | 268.8 GWh | 9.1 mi |
Greasewood II LLC | Girvin, TX | 556.9 GWh | 21.6 mi |
Greasewood Solar | Fort Stockton, TX | 272.1 GWh | 13.4 mi |
High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.1 TWh | 26.2 mi |
Hydra | Fort Stockton, TX | 36.7 GWh | 1.3 mi |
King Mountain Wind Ranch 1 | McCamey, TX | 508.2 GWh | 15.4 mi |
Midway Solar - TX | Fort Stockton, TX | 342.5 GWh | 2.7 mi |
NWP Indian Mesa Wind Farm | Iraan, TX | 205.6 GWh | 5.6 mi |
Pavo | Fort Stockton, TX | 27.0 GWh | 11.6 mi |
RE Maplewood | McCamey, TX | 502.1 GWh | 1 mi |
Roadrunner, LLC Hybrid | McCamey, TX | 1.1 TWh | 16.6 mi |
Sherbino II | Ft. Stockton, TX | 570.6 GWh | 20.5 mi |
Upton County Solar | McCamey, TX | 328.2 GWh | 17.6 mi |
Woodward Mountain I | Girvin, TX | 168.0 GWh | 9 mi |
Woodward Mountain II | Girvin, TX | 168.0 GWh | 9 mi |