Pearl Solar
1401 Nevill Cutoff Road, Fort Stockton, TX 79735Plant Summary Information
Pearl Solar is ranked #171 out of 255 solar farms in Texas in terms of total annual net electricity generation.
Pearl Solar generated 26.1 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Pearl Solar |
|---|---|
| Utility Name | BHE Renewables, LLC |
| Location | Pecos County, TX |
| Initial Operation Date | October 2017 |
| Last Update | Aug 2026 |
| Annual Generation | 86.1 GWh |
| Annual Consumption | 325.2 k MMBtu |
| Ranked #3,727 out of 13,301 Power Plants Nationwide | |
| Ranked #1,019 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #542 out of 861 Texas Power Plants | |
| Ranked #171 out of 255 Texas Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
OCI Solar Power (2016 to 2016) BHE Renewables, LLC (2017 to 2025) |
Map of Pearl Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Pearl Solar.
Monthly Net Generation for Pearl Solar
Monthly Plant Fuel Consumption for Pearl Solar
Pearl Solar Details
| Summary Information | |
|---|---|
| Plant Name | Pearl Solar (60682) |
| Plant Address | 1401 Nevill Cutoff Road, Fort Stockton, TX 79735 |
| Utility | BHE Renewables, LLC (59359) |
| Latitude, Longitude | 30.98784, -102.26831 |
| Generation Dates on File | Aug 2017 to Aug 2026 |
| Initial Operation Date | October 2017 |
| Annual Generation | 86.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator PEARL Details Operating October 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2017 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 66.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Pearl Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1009 | Monroe Solar Facility | Monroe, NC | 90.0 GWh |
| #1010 | Sunnybrook Solar Project - Hybrid | Scottsburg, VA | 89.9 GWh |
| #1011 | CM48 | Boulder City, NV | 89.7 GWh |
| #1012 | Stanly Solar, LLC | Albemarle, NC | 89.2 GWh |
| #1013 | Hattiesburg Solar Farm | Hattiesburg, MS | 88.8 GWh |
| #1014 | Lake Placid Solar Power Plant | Lake Placid, FL | 88.3 GWh |
| #1015 | Sanford Solar | Sanford, ME | 88.3 GWh |
| #1016 | Waipio Solar | Waipio, HI | 87.7 GWh |
| #1017 | Big Bend II Solar | Apollo Beach, FL | 87.6 GWh |
| #1018 | Foothills Solar Plant Hybrid | Yuma, AZ | 80.2 GWh |
| #1020 | Vandalia Renewable Energy Center | Vandalia, MO | 86.0 GWh |
| #1021 | Pavant Solar II LLC | Fillmore, UT | 85.9 GWh |
| #1022 | Moody Air Force Base Solar | Valdosta, GA | 84.1 GWh |
| #1023 | Fox Creek Solar | Louisburg, NC | 84.8 GWh |
| #1024 | Clinton Solar (OH) | Martinsville, OH | 84.7 GWh |
| #1025 | Edwards Sanborn S3 | Mojave, CA | 80.0 GWh |
| #1026 | Wolfskin Solar | Arnoldsville, GA | 84.1 GWh |
| #1027 | Sycamore Solar | Gretna, VA | 83.7 GWh |
| #1028 | BT Jungmann | Buckholts, TX | 82.6 GWh |
| #1029 | Long Branch Solar | Parrish, FL | 82.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Pearl Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alamo 6 | Fort Stockton, TX | 206.6 GWh | 0.4 mi |
| Appaloosa Run Wind | Rankin, TX | 698.3 GWh | 28.4 mi |
| Big Sampson Wind | TBD, TX | 826.9 GWh | 24.8 mi |
| Castle Gap Solar Hybrid | McCarney, TX | 352.0 GWh | 18.5 mi |
| Crane Solar Project | Crane, TX | 387.3 GWh | 18.6 mi |
| Desert Sky | Iraan, TX | 541.2 GWh | 11.8 mi |
| East Pecos Solar | McCamey, TX | 238.0 GWh | 1.2 mi |
| Emerald Grove | Crane, TX | 225.6 GWh | 9.1 mi |
| Greasewood II LLC | Girvin, TX | 839.2 GWh | 21.6 mi |
| Greasewood Solar | Fort Stockton, TX | 448.2 GWh | 13.4 mi |
| High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.6 TWh | 26.2 mi |
| King Mountain Wind Ranch 1 | McCamey, TX | 638.3 GWh | 15.4 mi |
| Midway Solar - TX | Fort Stockton, TX | 305.2 GWh | 2.7 mi |
| NWP Indian Mesa Wind Farm | Iraan, TX | 178.5 GWh | 5.6 mi |
| RE Maplewood | McCamey, TX | 529.6 GWh | 1 mi |
| Roadrunner, LLC Hybrid | McCamey, TX | 1.0 TWh | 16.6 mi |
| Sherbino II | Ft. Stockton, TX | 538.8 GWh | 20.5 mi |
| Upton County Solar | McCamey, TX | 274.0 GWh | 17.6 mi |
| Woodward Mountain I | Girvin, TX | 147.6 GWh | 9 mi |
| Woodward Mountain II | Girvin, TX | 132.5 GWh | 9 mi |