Quitman Solar
Barwick Rd, Quitman, GA 31643Plant Summary Information
Quitman Solar is ranked #37 out of 251 power plants in Georgia in terms of total annual net electricity generation.
Quitman Solar generated 85.6 GWh during the 3-month period between August 2025 to November 2025.
| Plant Name | Quitman Solar |
|---|---|
| Utility Name | Quitman Solar, LLC |
| Location | Brooks County, GA |
| Initial Operation Date | December 2019 |
| Last Update | Nov 2025 |
| Annual Generation | 320.6 GWh |
| Annual Consumption | 1.2 M MMBtu |
| Ranked #1,889 out of 12,574 Power Plants Nationwide | |
| Ranked #238 out of 6,426 Solar Power Plants Nationwide | |
| Ranked #37 out of 251 Georgia Power Plants | |
| Ranked #8 out of 152 Georgia Solar Power Plants | |
| Fuel Types | Solar |
Map of Quitman Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Quitman Solar.
Monthly Net Generation for Quitman Solar
Quitman Solar Details
| Summary Information | |
|---|---|
| Plant Name | Quitman Solar (62584) |
| Plant Address | Barwick Rd, Quitman, GA 31643 |
| Utility | Quitman Solar, LLC (61910) |
| Latitude, Longitude | 30.84901, -83.64328 |
| Generation Dates on File | Dec 2019 to Nov 2025 |
| Initial Operation Date | December 2019 |
| Annual Generation | 320.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Georgia Transmission Corp (7197) |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator QUITM Details Operating December 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 150 MW |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 225 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Quitman Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #228 | American Kings Solar, LLC | Lemoore, CA | 330.3 GWh |
| #229 | Spanish Peaks Solar | Trinidad, CO | 329.1 GWh |
| #230 | Sun Streams 2 | Hassayampa, AZ | 327.5 GWh |
| #231 | Golden Triangle II | St.Artesia, MS | 320.0 GWh |
| #232 | Hardin Solar Energy II LLC | Belle Center, OH | 325.9 GWh |
| #233 | Twin Lakes Solar LLC | Monticello, IN | 325.4 GWh |
| #234 | South Cheyenne Solar | South Greeley, WY | 324.2 GWh |
| #235 | Edwards Sanborn E4 | Mojave, CA | 319.3 GWh |
| #236 | Ray Ranch Solar | Pettus, TX | 323.8 GWh |
| #237 | Cove Mountain Solar 2 | Beryl, UT | 321.7 GWh |
| #239 | Umbriel Solar | Livington, TX | 320.3 GWh |
| #240 | Serrano | Marana, AZ | 305.1 GWh |
| #241 | Cass County Renewable Energy Center | Beardstown, IL | 320.0 GWh |
| #242 | Lily Solar Hybrid | Scurry, TX | 316.6 GWh |
| #243 | Elora Solar | Elora, TN | 316.3 GWh |
| #244 | Quitman II Solar | Quitman, GA | 315.4 GWh |
| #245 | Big River Solar | Norris City, IL | 315.4 GWh |
| #246 | Morris Ridge Solar | Mount Morris, NY | 314.1 GWh |
| #247 | Edwards Sanborn E2 | Mojave, CA | 300.1 GWh |
| #248 | Wolf Run Solar | Chapin, IL | 313.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Quitman Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Cairo Solar Farm, LLC | Cairo, GA | 3.3 GWh | 35 mi |
| Camilla Solar Plant | Pelham, GA | 26.2 GWh | 37 mi |
| Denver Braswell PV | Moultrie, GA | 614.0 MWh | 32.5 mi |
| Hamilton Solar Power Plant | Jasper, FL | 182.3 GWh | 39 mi |
| Lakeland Solar Energy LLC | Lakeland, GA | 3.4 GWh | 37 mi |
| Lowndes Cowart | Valdosta, GA | 6.8 GWh | 22.9 mi |
| Lowndes IDA | Valdosta, GA | 3.1 GWh | 24.7 mi |
| Lowndes Tycor Farms | Lake Park, GA | 4.6 GWh | 30.4 mi |
| Moody Air Force Base Solar | Valdosta, GA | 88.4 GWh | 26 mi |
| Norton Creek | TBD, FL | 185.4 GWh | 36.4 mi |
| OE_GA3 | Camilla, GA | 125.1 GWh | 38.3 mi |
| Oil Dri 2 Solar | Ochlocknee, GA | 2.9 GWh | 26.9 mi |
| PCA-Valdosta Mill | Valdosta, GA | 322.6 GWh | 22.8 mi |
| Pecan Row Landfill To Electric Facility | Valdosta, GA | 30.5 GWh | 16.8 mi |
| Quitman II Solar | Quitman, GA | 315.4 GWh | 1 mi |
| SR Odom | Moultrie, GA | 44.7 GWh | 15.5 mi |
| Valdosta | Valdosta, GA | 1.4 GWh | 24.9 mi |
| Valdosta Prison | Valdosta, GA | 1.7 GWh | 20.7 mi |
| Valdosta Water Treatment Plant | Valdosta, GA | 52.0 MWh | 23.6 mi |
| Vidalia Water Treatment Plant | Hahira, GA | 1.4 GWh | 20.3 mi |