Quitman Solar
Barwick Rd, Quitman, GA 31643Plant Summary Information
Quitman Solar is ranked #37 out of 247 power plants in Georgia in terms of total annual net electricity generation.
Quitman Solar generated 97.0 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Quitman Solar |
|---|---|
| Utility Name | Quitman Solar, LLC |
| Location | Brooks County, GA |
| Initial Operation Date | December 2019 |
| Last Update | May 2026 |
| Annual Generation | 336.6 GWh |
| Annual Consumption | 1.2 M MMBtu |
| Ranked #1,876 out of 13,081 Power Plants Nationwide | |
| Ranked #252 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #37 out of 247 Georgia Power Plants | |
| Ranked #8 out of 151 Georgia Solar Power Plants | |
| Fuel Types | Solar |
Map of Quitman Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Quitman Solar.
Monthly Net Generation for Quitman Solar
Monthly Plant Fuel Consumption for Quitman Solar
Quitman Solar Details
| Summary Information | |
|---|---|
| Plant Name | Quitman Solar (62584) |
| Plant Address | Barwick Rd, Quitman, GA 31643 |
| Utility | Quitman Solar, LLC (61910) |
| Latitude, Longitude | 30.84901, -83.64328 |
| Generation Dates on File | Dec 2019 to May 2026 |
| Initial Operation Date | December 2019 |
| Annual Generation | 336.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Georgia Transmission Corp (7197) |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator QUITM Details Operating December 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 150 MW |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 225 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Quitman Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #242 | Blythe Solar IV, LLC | Blythe, CA | 343.3 GWh |
| #243 | Rosamond South 1 | Rosamond, CA | 324.0 GWh |
| #244 | Blythe Solar II, LLC | Blythe, CA | 329.1 GWh |
| #245 | Montague Solar | Arlington, OR | 341.0 GWh |
| #246 | Daybreak Solar | Maupin, OR | 340.8 GWh |
| #247 | Ganado Solar | Gail, TX | 332.7 GWh |
| #248 | Azalea Springs Solar Park | Lufkin, TX | 339.2 GWh |
| #249 | Flat Fork Solar | Wheatley, AR | 338.9 GWh |
| #250 | Holstein 1 Solar Farm | Wingate, TX | 337.6 GWh |
| #251 | Golden Triangle II | St.Artesia, MS | 331.8 GWh |
| #253 | Arlington Valley Solar Energy II | Arlington, AZ | 336.0 GWh |
| #254 | Samson Solar Energy | Cunningham, TX | 335.7 GWh |
| #255 | Edwards Sanborn E1A | Mojave, CA | 317.5 GWh |
| #256 | Edwards Sanborn E4 | Mojave, CA | 329.8 GWh |
| #257 | Elora Solar | Elora, TN | 333.8 GWh |
| #258 | BigBeau Solar, LLC | Rosamond, CA | 329.6 GWh |
| #259 | Driver Solar | Osceola, AR | 332.7 GWh |
| #260 | Twin Lakes Solar LLC | Monticello, IN | 331.7 GWh |
| #261 | Escape Solar Plant | TBD, NV | 323.5 GWh |
| #262 | Cove Mountain Solar 2 | Beryl, UT | 330.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Quitman Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Cairo Solar Farm, LLC | Cairo, GA | 3.3 GWh | 35 mi |
| Camilla Solar Plant | Pelham, GA | 26.1 GWh | 37 mi |
| Denver Braswell PV | Moultrie, GA | 614.0 MWh | 32.5 mi |
| Hamilton Solar Power Plant | Jasper, FL | 172.6 GWh | 39 mi |
| Lakeland Solar Energy LLC | Lakeland, GA | 3.6 GWh | 37 mi |
| Lowndes Cowart | Valdosta, GA | 7.1 GWh | 22.9 mi |
| Lowndes IDA | Valdosta, GA | 3.1 GWh | 24.7 mi |
| Lowndes Tycor Farms | Lake Park, GA | 5.1 GWh | 30.4 mi |
| Moody Air Force Base Solar | Valdosta, GA | 82.2 GWh | 26 mi |
| Norton Creek | TBD, FL | 181.8 GWh | 36.4 mi |
| OE_GA3 | Camilla, GA | 119.1 GWh | 38.3 mi |
| Oil Dri 2 Solar | Ochlocknee, GA | 2.6 GWh | 26.9 mi |
| PCA-Valdosta Mill | Valdosta, GA | 310.6 GWh | 22.8 mi |
| Pecan Row Landfill To Electric Facility | Valdosta, GA | 26.6 GWh | 16.8 mi |
| Quitman II Solar | Quitman, GA | 317.8 GWh | 1 mi |
| SR Odom | Moultrie, GA | 45.3 GWh | 15.5 mi |
| Tift Bowen | Tifton, GA | 4.7 GWh | 42.3 mi |
| Valdosta (Terraform) | Valdosta, GA | 1.4 GWh | 24.9 mi |
| Valdosta Prison | Valdosta, GA | 1.9 GWh | 20.7 mi |
| Valdosta Water Treatment Plant | Valdosta, GA | 11.0 MWh | 23.6 mi |