Camilla Solar Energy Project
TBD, Camilla, GA 31730Plant Summary Information
Camilla Solar Energy Project is ranked #35 out of 251 power plants in Georgia in terms of total annual net electricity generation.
Camilla Solar Energy Project generated 65.9 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Camilla Solar Energy Project |
|---|---|
| Utility Name | Invenergy Services LLC |
| Location | Mitchell County, GA |
| Initial Operation Date | February 2020 |
| Last Update | Feb 2026 |
| Annual Generation | 355.9 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,785 out of 12,637 Power Plants Nationwide | |
| Ranked #218 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #35 out of 251 Georgia Power Plants | |
| Ranked #7 out of 152 Georgia Solar Power Plants | |
| Fuel Types | Solar |
Map of Camilla Solar Energy Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Camilla Solar Energy Project.
Monthly Net Generation for Camilla Solar Energy Project
Monthly Plant Fuel Consumption for Camilla Solar Energy Project
Camilla Solar Energy Project Details
| Summary Information | |
|---|---|
| Plant Name | Camilla Solar Energy Project (61785) |
| Plant Address | TBD, Camilla, GA 31730 |
| Utility | Invenergy Services LLC (49893) |
| Latitude, Longitude | 31.26955, -84.22872 |
| Generation Dates on File | Feb 2020 to Feb 2026 |
| Initial Operation Date | February 2020 |
| Annual Generation | 355.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Georgia Power Co (7140) GA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator CAMSR Details Operating February 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 171.4 MW |
| Summer Capacity | 171.4 MW |
| Winter Capacity | 171.4 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | February 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Tilt Angle | 60 |
| DC Net Capacity | 224 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Camilla Solar Energy Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #208 | Blythe Solar IV, LLC | Blythe, CA | 356.4 GWh |
| #209 | Hardy Hills Solar Energy LLC | Frankfort, IN | 362.7 GWh |
| #210 | Twiggs Solar | Dry Branch, GA | 362.2 GWh |
| #211 | Samson Solar Energy II LLC | Cunningham, TX | 359.5 GWh |
| #212 | Lund Hill Solar | Bickleton, WA | 359.4 GWh |
| #213 | Hillcrest Solar | Mt. Orab, OH | 359.2 GWh |
| #214 | Spanish Peaks Solar | Trinidad, CO | 358.4 GWh |
| #215 | Newport Solar Project | Newport, AR | 358.0 GWh |
| #216 | Pixley Solar Energy | Pixley, KS | 357.6 GWh |
| #217 | Copper Mountain Solar 2 | Boulder City, NV | 356.1 GWh |
| #219 | Darien Solar | Darien, WI | 355.5 GWh |
| #220 | Driver Solar | Osceola, AR | 355.3 GWh |
| #221 | Calhoun Solar | Battle Creek, MI | 354.9 GWh |
| #222 | Ganado Solar | Gail, TX | 347.1 GWh |
| #223 | Centinela Solar Energy | Calexico, CA | 352.7 GWh |
| #224 | Blythe Solar II, LLC | Blythe, CA | 336.8 GWh |
| #225 | Aragorn Solar Project | Van Horn, TX | 345.5 GWh |
| #226 | Edwards Sanborn E1A | Mojave, CA | 328.9 GWh |
| #227 | Arlington Energy Center III | Blythe, CA | 323.9 GWh |
| #228 | Buckthorn Westex | Ft. Stockton, TX | 341.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Camilla Solar Energy Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Albany Green Energy | Albany, GA | 106.8 GWh | 21 mi |
| Baconton Power Plant | Baconton, GA | 74.0 GWh | 11.9 mi |
| Bainbridge Solar | Bainbridge, GA | 1.9 GWh | 31.4 mi |
| BE Solar LLC | Atlanta, GA | 5.8 GWh | 31.2 mi |
| Cairo Solar Farm, LLC | Cairo, GA | 3.3 GWh | 24.8 mi |
| Camilla Solar Plant | Pelham, GA | 26.2 GWh | 8.2 mi |
| Decatur County Solar Project | Bainbridge, GA | 42.2 GWh | 31.5 mi |
| Decatur Parkway Solar Project, LLC | Bainbridge, GA | 178.7 GWh | 30.7 mi |
| Decatur Solar | Climax, GA | 481.9 GWh | 31.4 mi |
| Denver Braswell PV | Moultrie, GA | 614.0 MWh | 25.4 mi |
| Dougherty County Solar, LLC | Albany, GA | 268.3 GWh | 20 mi |
| Flint River | Albany, GA | 34.7 GWh | 23.6 mi |
| Hickory Park Solar Hybrid | Camilla, GA | 428.3 GWh | 3.1 mi |
| Inst and Envir Dir Marine Logistics Base | Albany, GA | 3.9 GWh | 22.1 mi |
| Marine Corps Logistics Base Solar | Albany, GA | 55.7 GWh | 21.6 mi |
| MCLB Landfill Gas to Energy | Albany, GA | 3.9 GWh | 21.3 mi |
| OE_GA3 | Camilla, GA | 122.2 GWh | 7 mi |
| Oil Dri 2 Solar | Ochlocknee, GA | 2.9 GWh | 21.5 mi |
| Sowega Power | Baconton, GA | 53.4 GWh | 11.9 mi |
| Walton Bainbridge Power Facility | Bainbridge, GA | 64.0 MWh | 31.1 mi |