Aragorn Solar Project
2535 (C) E KC Road, Van Horn, TX 79855Plant Summary Information
Aragorn Solar Project is ranked #24 out of 150 solar farms in Texas in terms of total annual net electricity generation.
Aragorn Solar Project generated 87.3 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Aragorn Solar Project |
---|---|
Utility Name | SE Aragorn, LLC |
Location | Culberson County, TX |
Initial Operation Date | December 2021 |
Last Update | Feb 2024 |
Annual Generation | 448.2 GWh |
Annual Consumption | 1.5 M MMBtu |
Ranked #1,469 out of 11,455 Power Plants Nationwide | |
Ranked #65 out of 5,173 Solar Power Plants Nationwide | |
Ranked #271 out of 726 Texas Power Plants | |
Ranked #24 out of 150 Texas Solar Power Plants | |
Fuel Types | Solar |
Map of Aragorn Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Aragorn Solar Project.
Monthly Net Generation for Aragorn Solar Project
Aragorn Solar Project Details
Summary Information | |
---|---|
Plant Name | Aragorn Solar Project (63329) |
Plant Address | 2535 (C) E KC Road Van Horn, TX 79855 |
Utility | SE Aragorn, LLC (63101) |
Latitude, Longitude | 31.71998, -104.44229 |
Generation Dates on File | Dec 2021 to Feb 2024 |
Initial Operation Date | December 2021 |
Annual Generation | 448.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator IPAGN Details Operating December 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 187.2 MW |
Summer Capacity | 180 MW |
Winter Capacity | 180 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 60 |
DC Net Capacity | 255 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Aragorn Solar Project Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#55 | RE Maplewood | McCamey, TX | 489.1 GWh |
#56 | Wright Solar Park | Los Banos, CA | 479.5 GWh |
#57 | Rambler | San Angelo, TX | 476.6 GWh |
#58 | ANSON Solar Center, LLC | Anson, TX | 473.8 GWh |
#59 | Muscle Shoals | Cherokee, AL | 473.2 GWh |
#60 | RE Garland | Rosamond, CA | 451.8 GWh |
#61 | Townsite Solar Project Hybrid | Boulder City, NV | 446.9 GWh |
#62 | Brazoria County Solar Project (Danciger) | Damon, TX | 456.8 GWh |
#63 | RE Tranquillity | Cantua Creek, CA | 444.4 GWh |
#64 | Desert Sunlight 250, LLC | Desert Center, CA | 450.0 GWh |
#66 | Springbok Solar Farm 2 | Cantil, CA | 444.6 GWh |
#67 | Imperial Solar Energy Center West | Seeley, CA | 444.2 GWh |
#68 | Brazoria West | Damon, TX | 441.2 GWh |
#69 | Shakes Solar | Carrizo Springs, TX | 440.0 GWh |
#70 | Hickory Park Solar Hybrid | Camilla, GA | 433.5 GWh |
#71 | Holstein 1 Solar Farm | Wingate, TX | 434.5 GWh |
#72 | CED Crane Solar | Crane, TX | 433.6 GWh |
#73 | Mesquite Solar 1 | Tonopah, AZ | 433.0 GWh |
#74 | Riverstart Solar Park LLC | Modoc, IN | 426.5 GWh |
#75 | Impact Solar 1 | Deport, TX | 426.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Aragorn Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Anderson Wind I | Hagerman, NM | 17.3 GWh | 96.7 mi |
Anderson Wind II | Hagerman, NM | 46.1 GWh | 95.5 mi |
Barilla Solar | Fort Stockton, TX | 79.1 GWh | 83.1 mi |
Cunningham | Hobbs, NM | 1.4 TWh | 93.6 mi |
Hobbs Generating Station | Hobbs, NM | 4.3 TWh | 96.1 mi |
Maddox | Hobbs, NM | 733.7 GWh | 95.7 mi |
Notrees Windpower Hybrid | Goldsmith, TX | 273.1 GWh | 96.6 mi |
Oso Grande Wind Farm | Maljamar, NM | 585.4 GWh | 95.2 mi |
Permian Basin | Monahans, TX | 131.1 GWh | 87.5 mi |
Phoebe Solar | Kermit, TX | 559.5 GWh | 92.8 mi |
RE Roserock | Fort Stockton, TX | 411.4 GWh | 85.1 mi |
SPS1 Dollarhide | Jal, NM | 23.6 GWh | 81.5 mi |
SPS2 Jal | Jal, NM | 23.6 GWh | 80.5 mi |
SPS3 Lea | Eunice, NM | 21.3 GWh | 83.5 mi |
SPS4 Monument | Monument, NM | 23.4 GWh | 94.1 mi |
SPS5 Hopi | Carlsbad, NM | 22.2 GWh | 44.9 mi |
Taygete Energy Project LLC | Coyanosa, TX | 570.1 GWh | 86.5 mi |
Taygete II Energy Project | Coyanosa, TX | 311.3 GWh | 85.8 mi |
Titan Solar Project | Van Horn, TX | 700.7 GWh | 1.6 mi |
West of the Pecos Solar | TBD, TX | 247.8 GWh | 46.5 mi |