Moody Air Force Base Solar
4708 Roberts Rd, Valdosta, GA 31605Plant Summary Information
Moody Air Force Base Solar is ranked #27 out of 123 solar farms in Georgia in terms of total annual net electricity generation.
Moody Air Force Base Solar generated 24.8 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Moody Air Force Base Solar |
---|---|
Utility Name | Georgia Power Co |
Location | Lowndes County, GA |
Initial Operation Date | June 2020 |
Last Update | Feb 2024 |
Annual Generation | 99.9 GWh |
Annual Consumption | 340.9 k MMBtu |
Ranked #3,143 out of 11,455 Power Plants Nationwide | |
Ranked #509 out of 5,173 Solar Power Plants Nationwide | |
Ranked #84 out of 222 Georgia Power Plants | |
Ranked #27 out of 123 Georgia Solar Power Plants | |
Fuel Types | Solar |
Map of Moody Air Force Base Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Moody Air Force Base Solar.
Monthly Net Generation for Moody Air Force Base Solar
Moody Air Force Base Solar Details
Summary Information | |
---|---|
Plant Name | Moody Air Force Base Solar (62377) |
Plant Address | 4708 Roberts Rd Valdosta, GA 31605 |
Utility | Georgia Power Co (7140) |
Latitude, Longitude | 30.9574, -83.2229 |
Generation Dates on File | Jun 2020 to Feb 2024 |
Initial Operation Date | June 2020 |
Annual Generation | 99.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Georgia Power Co (7140) GA |
Grid Voltage | 115.00 kV |
Energy Storage | No |
Generator 1 Details Operating June 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 49.5 MW |
Summer Capacity | 49.5 MW |
Winter Capacity | 49.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2020 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Tilt Angle | 15 |
DC Net Capacity | 66.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Moody Air Force Base Solar Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#499 | Pearl Solar | Fort Stockton, TX | 101.6 GWh |
#500 | RE Gaskell West 2 LLC | Rosamond, CA | 101.5 GWh |
#501 | Broad River Solar, LLC | Mooresboro, NC | 101.3 GWh |
#502 | Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 90.2 GWh |
#503 | Meherrin Solar | Skippers, VA | 101.1 GWh |
#504 | Live Oak Solar, LLC | Metter, GA | 100.9 GWh |
#505 | Bear Creek | Lone Rock, WI | 100.8 GWh |
#506 | North Rock | Edgerton, WI | 100.7 GWh |
#507 | Sumrall II Solar Farm | Sumrall, MS | 100.3 GWh |
#508 | Buckleberry Solar | Grifton, NC | 100.2 GWh |
#510 | Troy Solar | Troy, IN | 98.5 GWh |
#511 | Beacon Solar Plant Site 5 | Cantil, CA | 98.4 GWh |
#512 | ENGIE Solidago Solar Project - Hybrid | Townsend, DE | 98.3 GWh |
#513 | Mountain View Solar (FL) | Dade City, FL | 97.9 GWh |
#514 | Peace Creek Solar | Bartow, FL | 97.7 GWh |
#515 | Hazlehurst II | Hazlehurst, GA | 97.1 GWh |
#516 | Eastover Solar | Eastover, SC | 96.5 GWh |
#517 | ID Solar | Kuna, ID | 96.3 GWh |
#518 | Highest Power Solar, LLC | Louisburg, NC | 96.3 GWh |
#519 | Prineville Solar Energy LLC | Prineville, OR | 96.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Moody Air Force Base Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Denver Braswell PV | Moultrie, GA | 2.9 GWh | 41.5 mi |
Echo River Solar | Live Oak, FL | 172.3 GWh | 50.4 mi |
Hamilton Solar Power Plant | Jasper, FL | 170.3 GWh | 35.5 mi |
Lakeland Solar Energy LLC | Lakeland, GA | 3.1 GWh | 11 mi |
Lowndes IDA | Valdosta, GA | 3.3 GWh | 8.4 mi |
Lowndes Tycor Farms | Lake Park, GA | 4.8 GWh | 18.9 mi |
Oil Dri 2 Solar | Ochlocknee, GA | 2.8 GWh | 50 mi |
PCA-Valdosta Mill | Valdosta, GA | 325.6 GWh | 18.8 mi |
Pecan Row Landfill To Electric Facility | Valdosta, GA | 33.6 GWh | 12.9 mi |
Quitman II Solar | Quitman, GA | 369.0 GWh | 26.3 mi |
Quitman Solar | Quitman, GA | 368.7 GWh | 26 mi |
SR Odom | Moultrie, GA | 53.0 GWh | 23.4 mi |
Sunshine Gateway Solar Energy Center | Lake City, FL | 146.3 GWh | 54 mi |
Suwannee River | Live Oak, FL | 86.4 GWh | 40.2 mi |
Suwannee Solar Facility | Live Oak, FL | 18.4 GWh | 40.3 mi |
Swift Creek Chemical Complex | White Springs, FL | 98.9 GWh | 40.9 mi |
Twin Rivers Solar Power Plant | Jasper, FL | 156.6 GWh | 37.1 mi |
Valdosta | Valdosta, GA | 1.8 GWh | 10.2 mi |
Valdosta Prison | Valdosta, GA | 1.9 GWh | 6.1 mi |
Vidalia Water Treatment Plant | Hahira, GA | 1.5 GWh | 12 mi |