Elora Solar
7 Terry Dunavan Rd, Elora, TN 37328Plant Summary Information
Elora Solar is ranked #25 out of 83 power plants in Tennessee in terms of total annual net electricity generation.
Elora Solar generated 76.5 GWh during the 3-month period between January 2025 to April 2025.
Plant Name | Elora Solar |
---|---|
Utility Name | Elora Solar |
Location | Lincoln County, TN |
Initial Operation Date | March 2022 |
Last Update | Apr 2025 |
Annual Generation | 307.1 GWh |
Annual Consumption | 1.1 M MMBtu |
Ranked #1,883 out of 12,299 Power Plants Nationwide | |
Ranked #195 out of 6,182 Solar Power Plants Nationwide | |
Ranked #25 out of 83 Tennessee Power Plants | |
Ranked #1 out of 30 Tennessee Solar Power Plants | |
Fuel Types | Solar |
Map of Elora Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Elora Solar.
Monthly Net Generation for Elora Solar
Elora Solar Details
Summary Information | |
---|---|
Plant Name | Elora Solar (63719) |
Plant Address | 7 Terry Dunavan Rd, Elora, TN 37328 |
Utility | Elora Solar (63418) |
Latitude, Longitude | 35.06, -86.34 |
Generation Dates on File | Mar 2022 to Apr 2025 |
Initial Operation Date | March 2022 |
Annual Generation | 307.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Tennessee Valley Authority (TVA) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Tennessee Valley Authority (18642) TN |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator ELO Details Operating March 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 150 MW |
Summer Capacity | 150 MW |
Winter Capacity | 150 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 205 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Elora Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#185 | Drew Solar LLC | Calexico, CA | 315.7 GWh |
#186 | Maverick Solar 7, LLC | Desert Center, CA | 313.6 GWh |
#187 | Impact Solar 1 | Deport, TX | 309.8 GWh |
#188 | Edwards Sanborn E2 | Mojave, CA | 295.0 GWh |
#189 | Quitman II Solar | Quitman, GA | 308.8 GWh |
#190 | Fence Post Solar Hybrid Project, LLC | Corsicana, TX | 305.1 GWh |
#191 | Corazon Energy LLC | Rachito Las Lomas, TX | 307.9 GWh |
#192 | Storey Solar and Storage | Coolidge, AZ | 295.5 GWh |
#193 | Grant County | Town of Potosi, WI | 307.6 GWh |
#194 | Rancho Seco Solar II, LLC | Twin Cities, CA | 307.2 GWh |
#196 | SR DeSoto I, LLC | DeSoto, GA | 307.1 GWh |
#197 | Harry Allen Solar Energy LLC | Apex, NV | 303.2 GWh |
#198 | Golden Triangle II | St.Artesia, MS | 298.4 GWh |
#199 | CA Flats Solar 150, LLC | Shandon, CA | 301.6 GWh |
#200 | Concho Valley Solar, LLC | San Angelo, TX | 300.6 GWh |
#201 | Pearl River Solar Park LLC | Morton, MS | 300.1 GWh |
#202 | ANSON Solar Center, LLC | Anson, TX | 299.6 GWh |
#203 | Highlander Solar Energy Station 1 | Spotsylvania, VA | 298.4 GWh |
#204 | Springbok Solar Farm 1 | Cantil, CA | 297.7 GWh |
#205 | Wistaria Ranch Solar | Calexico, CA | 297.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Elora Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Browns Ferry | Decatur, AL | 28.8 TWh | 50.5 mi |
Chattanooga Metropolitan Airport Solar | Chattanooga, TN | 2.6 GWh | 64 mi |
Chattooga Gore | Menlo, GA | 5.4 GWh | 63.7 mi |
Chickamauga | Chattanooga, TN | 688.9 GWh | 62.9 mi |
Cumblerland Land Holdings, LLC | Elkmont, AL | 27.2 GWh | 30.8 mi |
Decatur Energy Center | Decatur, AL | 4.2 TWh | 48.8 mi |
Decatur-Morgan Co LFG Recovery Project | Trinity, AL | 9.6 GWh | 52.6 mi |
Great Falls (TN) | Rock Island, TN | 275.6 GWh | 65.1 mi |
Guntersville | Guntersville, AL | 454.8 GWh | 44.2 mi |
McMinnville | McMinnville, TN | 95.0 MWh | 55.8 mi |
Morgan Energy Center | Decatur, AL | 4.8 TWh | 50.3 mi |
MTSU Power Co-Gen Plant | Murfreesboro, TN | 38.4 GWh | 54.7 mi |
Nickajack | New Hope, TN | 491.2 GWh | 40.8 mi |
Redstone Arsenal Hybrid | Huntsville, AL | 16.9 GWh | 34.6 mi |
Sand Valley Power Station | Collinsville, AL | 27.2 GWh | 56.3 mi |
SR Bell Buckle | Shelbyville, TN | 70.0 GWh | 35.9 mi |
TAI Huntsville Solar Hybrid | Huntsville, AL | 50.6 GWh | 22.9 mi |
Tims Ford | Winchester, TN | 37.3 GWh | 10.1 mi |
Volkswagen Solar System | Chattanooga, TN | 12.2 GWh | 68.6 mi |
Wheeler Dam | Town Creek, AL | 1.2 TWh | 61.6 mi |