Zier Solar
6349 W US Hwy 90, Brackettville, TX 78832Plant Summary Information
Zier Solar is ranked #89 out of 245 solar farms in Texas in terms of total annual net electricity generation.
Zier Solar generated 78.8 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Zier Solar |
|---|---|
| Utility Name | Cypress Creek Renewables |
| Location | Kinney County, TX |
| Initial Operation Date | April 2024 |
| Last Update | May 2026 |
| Annual Generation | 348.8 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,831 out of 13,081 Power Plants Nationwide | |
| Ranked #239 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #377 out of 852 Texas Power Plants | |
| Ranked #89 out of 245 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Zier Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Zier Solar.
Monthly Net Generation for Zier Solar
Monthly Plant Fuel Consumption for Zier Solar
Zier Solar Details
| Summary Information | |
|---|---|
| Plant Name | Zier Solar (66137) |
| Plant Address | 6349 W US Hwy 90, Brackettville, TX 78832 |
| Utility | Cypress Creek Renewables (61060) |
| Latitude, Longitude | 29.35099, -100.56203 |
| Generation Dates on File | Apr 2024 to May 2026 |
| Initial Operation Date | April 2024 |
| Annual Generation | 348.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Lower Colorado River Authority (11269) |
| Grid Voltage | 138.00 kV |
| Energy Storage | Yes |
Generator 11023 Details Operating April 2024
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 40.4 MW |
| Summer Capacity | 40.4 MW |
| Winter Capacity | 40.4 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 80 |
|---|---|
| Maximum Charge Rate | 40.4 MW |
| Maximum Discharge Rate | 40.4 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 19.6 |
| Storage Enclosure Type | CS |
| Arbitrage | P |
| Frequency Regulation | Yes |
| Ramping Spinning Reserve | Yes |
| Ac Coupled | No |
| Direct Support Of Another Unit | No |
| Support T D Asset | Yes |
Generator 41195 Details Operating April 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 160 MW |
| Summer Capacity | 160 MW |
| Winter Capacity | 160 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 208 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Zier Solar Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #229 | Roaring Springs, LLC | Motley, TX | 361.9 GWh |
| #230 | North Rosamond Solar LLC | Rosamond, CA | 361.7 GWh |
| #231 | Blythe Solar III, LLC Hybrid | Blythe, CA | 347.5 GWh |
| #232 | Hardy Hills Solar Energy LLC | Frankfort, IN | 359.5 GWh |
| #233 | Castle Gap Solar Hybrid | McCarney, TX | 359.0 GWh |
| #234 | Diver Solar, LLC | Thornton, TX | 359.2 GWh |
| #235 | Skeleton Creek Energy Center Hybrid | Carrier, OK | 1.3 TWh |
| #236 | Camilla Solar Energy Project | Camilla, GA | 359.0 GWh |
| #237 | Imperial Solar Energy Center West | Seeley, CA | 357.0 GWh |
| #238 | Spanish Peaks Solar | Trinidad, CO | 354.9 GWh |
| #240 | Arlington Energy Center III | Blythe, CA | 334.1 GWh |
| #241 | Newport Solar Project | Newport, AR | 353.8 GWh |
| #242 | Blythe Solar IV, LLC | Blythe, CA | 343.3 GWh |
| #243 | Rosamond South 1 | Rosamond, CA | 324.0 GWh |
| #244 | Blythe Solar II, LLC | Blythe, CA | 329.1 GWh |
| #245 | Montague Solar | Arlington, OR | 341.0 GWh |
| #246 | Daybreak Solar | Maupin, OR | 340.8 GWh |
| #247 | Ganado Solar | Gail, TX | 332.7 GWh |
| #248 | Azalea Springs Solar Park | Lufkin, TX | 339.2 GWh |
| #249 | Flat Fork Solar | Wheatley, AR | 338.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Zier Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Amistad Dam & Power | Del Rio, TX | 39.2 GWh | 30.7 mi |
| Anacacho Wind Farm, LLC | Brackettville, TX | 324.3 GWh | 22.7 mi |
| AP Sunray LLC | Knippa, TX | 409.3 GWh | 57.4 mi |
| Bandera Electric Coop PV | Leakey, TX | 2.7 GWh | 53.2 mi |
| Eagle Pass | Eagle Pass, TX | 12.6 GWh | 36 mi |
| Elara Solar | Pearsall, TX | 263.5 GWh | 89.5 mi |
| HEB_CPS00085 | San Antonio, TX | 329.0 MWh | 112 mi |
| Horizon Solar | Pearsall, TX | 457.7 GWh | 92.3 mi |
| Morrow Lake Solar | Pearsall, TX | 176.0 GWh | 94.4 mi |
| Nelson Gardens Landfill Gas to Energy | San Antonio, TX | 8.8 GWh | 114.6 mi |
| OCI Alamo 4, LLC | Brackettville, TX | 70.5 GWh | 10.5 mi |
| OCI Alamo 5 LLC | Uvalde, TX | 159.1 GWh | 51.8 mi |
| Pearsall | Pearsall, TX | 453.9 GWh | 93.4 mi |
| Ranchero Wind Farm LLC | Iraan, TX | 1.1 TWh | 101.1 mi |
| Rocksprings | Del Rio, TX | 486.0 GWh | 29.5 mi |
| Shakes Solar | Carrizo Springs, TX | 387.1 GWh | 79.5 mi |
| SunE CPS3 LLC | Somerset, TX | 7.2 GWh | 114.4 mi |
| WAL447 | Del Rio, TX | 331.0 MWh | 20.6 mi |
| WAL461 | Eagle Pass, TX | 344.0 MWh | 45.1 mi |
| White Mesa Wind | Ozona, TX | 1.8 TWh | 115.6 mi |