Tres Bahias
2574 FM 2143, Port Lavaca, TX 77979Plant Summary Information
Tres Bahias is ranked #66 out of 251 solar farms in Texas in terms of total annual net electricity generation.
Tres Bahias generated 112.8 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Tres Bahias |
|---|---|
| Utility Name | Tres Bahias Solar Power, LLC |
| Location | Calhoun County, TX |
| Initial Operation Date | May 2024 |
| Last Update | Jun 2026 |
| Annual Generation | 438.7 GWh |
| Annual Consumption | 1.7 M MMBtu |
| Ranked #1,519 out of 13,094 Power Plants Nationwide | |
| Ranked #162 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #318 out of 858 Texas Power Plants | |
| Ranked #66 out of 251 Texas Solar Power Plants | |
| Fuel Types | Solar |
Map of Tres Bahias
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tres Bahias.
Monthly Net Generation for Tres Bahias
Monthly Plant Fuel Consumption for Tres Bahias
Tres Bahias Details
| Summary Information | |
|---|---|
| Plant Name | Tres Bahias (65947) |
| Plant Address | 2574 FM 2143, Port Lavaca, TX 77979 |
| Utility | Tres Bahias Solar Power, LLC (65123) |
| Latitude, Longitude | 28.68851, -96.50983 |
| Generation Dates on File | Jan 2024 to Jun 2026 |
| Initial Operation Date | May 2024 |
| Annual Generation | 438.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG22-115-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator TB Details Operating May 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | TREB_SOLAR1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | TREB_SOLAR1 |
| Nameplate Capacity | 196.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 196.3 MW |
| Winter Capacity | 196.3 MW |
| Minimum Load | 0.1 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| DC Net Capacity | 260.82 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Tres Bahias Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #152 | Techren Solar II LLC | Boulder, NV | 452.3 GWh |
| #153 | White Wing Solar | Yuma, AZ | 451.0 GWh |
| #154 | Pixley Solar Energy | Medicine Lodge, KS | 448.9 GWh |
| #155 | Centinela Solar Energy | Calexico, CA | 448.6 GWh |
| #156 | Sun Streams 3 | Arlington, AZ | 413.1 GWh |
| #157 | Pleinmont Solar 2 | Spotsylvania, VA | 445.6 GWh |
| #158 | Mesquite Solar 3, LLC | Tonopah, AZ | 443.8 GWh |
| #159 | Serrano | Marana, AZ | 416.5 GWh |
| #160 | Cutlass Solar II | Richmond, TX | 441.8 GWh |
| #161 | Imperial Valley Solar, LLC | Calexico, CA | 441.7 GWh |
| #163 | Pike Solar Hybrid | Fountain, CO | 436.5 GWh |
| #164 | Dunns Bridge I Solar | Wheatfield, IN | 436.0 GWh |
| #165 | Muscle Shoals | Cherokee, AL | 435.1 GWh |
| #166 | Sherco Solar I | Clear Lake, MN | 433.6 GWh |
| #167 | Huck Finn Renewable Energy Center | Vandalia, MO | 433.4 GWh |
| #168 | Orion I Solar Project | Burlington, TX | 432.9 GWh |
| #169 | Blue Jay Solar I, LLC | Iola, TX | 427.1 GWh |
| #170 | Morris Solar | Kirksville, MO | 429.7 GWh |
| #171 | Samson Solar Energy II LLC | Cunningham, TX | 426.2 GWh |
| #172 | Roaring Springs, LLC | Motley, TX | 425.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tres Bahias.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Aktina Solar | El Campo, TX | 1.1 TWh | 33.1 mi |
| Calhoun Port Comfort | Point Comfort, TX | 26.0 GWh | 3.6 mi |
| CFB Power Plant | Point Comfort, TX | 851.5 GWh | 3.2 mi |
| CG PS Victoria WWTP, LLC | Victoria, TX | 40.0 MWh | 31.3 mi |
| Danish Fields Solar, LLC | El Campo, TX | 922.9 GWh | 28.5 mi |
| Formosa Utility Venture Ltd | Point Comfort, TX | 4.9 TWh | 1.9 mi |
| Ganado Solar | Gail, TX | 329.6 GWh | 29.1 mi |
| HEB00092 | Victoria, TX | 320.0 MWh | 31.6 mi |
| HEB00292 | Bay City, TX | 191.0 MWh | 39.1 mi |
| Oriana Solar LLC | Victoria, TX | 315.7 GWh | 32.1 mi |
| OTHERCitizensHospital | Victoria, TX | 588.0 MWh | 29.6 mi |
| Prairie Switch Wind LLC | El Campo, TX | 508.5 GWh | 37.7 mi |
| Seadrift Coke LP | Port Lavaca, TX | 34.5 GWh | 21 mi |
| South Texas Project | Wadsworth, TX | 20.2 TWh | 28.9 mi |
| Tres City Power LLC | Victoria, TX | 49.1 GWh | 31 mi |
| Tres Port Power, LLC | Victoria, TX | 98.3 GWh | 26.4 mi |
| Union Carbide Seadrift Cogen | Seadrift, TX | 563.3 GWh | 20 mi |
| Victoria | Victoria, TX | 1.2 TWh | 31.1 mi |
| Victoria Port II | Victoria, TX | 25.2 GWh | 26.5 mi |
| Victoria Texas Plant | Victoria, TX | 542.0 GWh | 27.1 mi |