Midway Solar - TX
FM highway 1901 at CO-OP Road, Fort Stockton, TX 79735Plant Summary Information
Midway Solar - TX is ranked #64 out of 196 solar farms in Texas in terms of total annual net electricity generation.
Midway Solar - TX generated 104.4 GWh during the 3-month period between April 2025 to July 2025.
Plant Name | Midway Solar - TX |
---|---|
Utility Name | Midway Solar |
Location | Pecos County, TX |
Initial Operation Date | December 2018 |
Last Update | Jul 2025 |
Annual Generation | 344.8 GWh |
Annual Consumption | 1.3 M MMBtu |
Ranked #1,767 out of 12,530 Power Plants Nationwide | |
Ranked #190 out of 6,379 Solar Power Plants Nationwide | |
Ranked #340 out of 804 Texas Power Plants | |
Ranked #64 out of 196 Texas Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
Midway Solar LLC (2016 to 2017) D E Shaw & Co., LP (2018 to 2018) MIdway Solar (2019 to 2024) |
Map of Midway Solar - TX
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Midway Solar - TX.
Monthly Net Generation for Midway Solar - TX
Midway Solar - TX Details
Summary Information | |
---|---|
Plant Name | Midway Solar - TX (61368) |
Plant Address | FM highway 1901 at CO-OP Road, Fort Stockton, TX 79735 |
Utility | Midway Solar (61801) |
Latitude, Longitude | 30.9955, -102.22354 |
Generation Dates on File | Dec 2018 to Jul 2025 |
Initial Operation Date | December 2018 |
Annual Generation | 344.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | PacifiCorp (14354) WY |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator PV1 Details Operating December 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 182 MW |
Summer Capacity | 182 MW |
Winter Capacity | 182 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2018 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Dual Axis Tracking | No |
DC Net Capacity | 235.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Midway Solar - TX Plant Owners
Owner Name | Address | Ownership |
---|---|---|
174 Power Global Corp. | 400 Spectrum Center Dr. Ste 1400, Irvine, CA 92618 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#180 | San Juan Solar I | Kirtland, NM | 340.0 GWh |
#181 | Blythe Solar II, LLC | Blythe, CA | 340.0 GWh |
#182 | Driver Solar | Osceola, AR | 353.3 GWh |
#183 | Centinela Solar Energy | Calexico, CA | 352.7 GWh |
#184 | Delilah Solar Energy LLC | Bogota, TX | 352.5 GWh |
#185 | Shakes Solar | Carrizo Springs, TX | 348.3 GWh |
#186 | Blythe Solar IV, LLC | Blythe, CA | 341.4 GWh |
#187 | Edwards Sanborn E1A | Mojave, CA | 332.7 GWh |
#188 | Camilla Solar Energy Project | Camilla, GA | 346.3 GWh |
#189 | Ganado Solar | Gail, TX | 337.3 GWh |
#191 | Arlington Energy Center III | Blythe, CA | 323.2 GWh |
#192 | Newport Solar Project | Newport, AR | 342.0 GWh |
#193 | Arlington Valley Solar Energy II | Arlington, AZ | 341.2 GWh |
#194 | Fighting Jays Solar Project | Needville, TX | 339.9 GWh |
#195 | McFarland B Solar and Storage | Dateland, AZ | 334.9 GWh |
#196 | South Cheyenne Solar | South Greeley, WY | 338.0 GWh |
#197 | Sun Streams 2 | Hassayampa, AZ | 337.9 GWh |
#198 | Zier Solar | Brackettville, TX | 332.3 GWh |
#199 | Calhoun Solar | Battle Creek, MI | 335.3 GWh |
#200 | TS Power Plant | Battle Mountain, NV | 1.6 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Midway Solar - TX.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alamo 6 | Fort Stockton, TX | 230.7 GWh | 2.8 mi |
Castle Gap Solar Hybrid | McCarney, TX | 400.7 GWh | 18.2 mi |
Crane Solar Project | Crane, TX | 405.1 GWh | 18.6 mi |
Desert Sky | Iraan, TX | 496.7 GWh | 9.7 mi |
East Pecos Solar | McCamey, TX | 220.9 GWh | 3.5 mi |
Emerald Grove | Crane, TX | 263.0 GWh | 10.5 mi |
Greasewood II LLC | Girvin, TX | 646.3 GWh | 23.9 mi |
Greasewood Solar | Fort Stockton, TX | 312.2 GWh | 15.9 mi |
High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.2 TWh | 23.6 mi |
Hydra | Fort Stockton, TX | 35.4 GWh | 3.9 mi |
King Mountain Wind Ranch 1 | McCamey, TX | 515.1 GWh | 14.8 mi |
NWP Indian Mesa Wind Farm | Iraan, TX | 205.6 GWh | 4.6 mi |
Pavo | Fort Stockton, TX | 26.3 GWh | 14 mi |
Pearl Solar | Fort Stockton, TX | 102.0 GWh | 2.7 mi |
RE Maplewood | McCamey, TX | 509.0 GWh | 2.4 mi |
Roadrunner, LLC Hybrid | McCamey, TX | 1.1 TWh | 15.6 mi |
Sherbino II | Ft. Stockton, TX | 570.6 GWh | 22.7 mi |