Wolf Run Solar
1837 Concord Arenzville Rd, Chapin, IL 62628Plant Summary Information
Wolf Run Solar is ranked #5 out of 198 solar farms in Illinois in terms of total annual net electricity generation.
Wolf Run Solar generated 105.4 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Wolf Run Solar |
|---|---|
| Utility Name | Wolf Run Solar LLC |
| Location | Morgan County, IL |
| Initial Operation Date | November 2024 |
| Last Update | Sep 2025 |
| Annual Generation | 309.3 GWh |
| Annual Consumption | 1.1 M MMBtu |
| Ranked #1,930 out of 12,539 Power Plants Nationwide | |
| Ranked #241 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #69 out of 367 Illinois Power Plants | |
| Ranked #5 out of 198 Illinois Solar Power Plants | |
| Fuel Types | Solar |
Map of Wolf Run Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wolf Run Solar.
Monthly Net Generation for Wolf Run Solar
Wolf Run Solar Details
| Summary Information | |
|---|---|
| Plant Name | Wolf Run Solar (68056) |
| Plant Address | 1837 Concord Arenzville Rd, Chapin, IL 62628 |
| Utility | Wolf Run Solar LLC (66566) |
| Latitude, Longitude | 39.7923, -90.35932 |
| Generation Dates on File | Aug 2024 to Sep 2025 |
| Initial Operation Date | November 2024 |
| Annual Generation | 309.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Ameren Illinois Company (56697) IL |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator GEN01 Details Operating November 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 140 MW |
| Summer Capacity | 140 MW |
| Winter Capacity | 140 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| Tilt Angle | 52 |
| DC Net Capacity | 207.39 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Wolf Run Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #231 | Elora Solar | Elora, TN | 318.4 GWh |
| #232 | Quitman Solar | Quitman, GA | 317.1 GWh |
| #233 | Quitman II Solar | Quitman, GA | 315.1 GWh |
| #234 | West Memphis Solar Station | Crawfordsville, AR | 314.9 GWh |
| #235 | Edwards Sanborn E2 | Mojave, CA | 299.6 GWh |
| #236 | Lily Solar Hybrid | Scurry, TX | 310.4 GWh |
| #237 | Storey Solar and Storage | Coolidge, AZ | 298.7 GWh |
| #238 | Fort Powhatan Solar | Disputanta, VA | 312.1 GWh |
| #239 | SR DeSoto I, LLC | DeSoto, GA | 311.4 GWh |
| #240 | Drew Solar LLC | Calexico, CA | 309.4 GWh |
| #242 | Copperhead Solar, LLC | Riesel, TX | 304.4 GWh |
| #243 | Twin Lakes Solar LLC | Monticello, IN | 308.5 GWh |
| #244 | Skipjack Solar Center | Wayside, VA | 307.8 GWh |
| #245 | Oberon IA | Odessa, TX | 306.3 GWh |
| #246 | Upton County Solar | McCamey, TX | 305.6 GWh |
| #247 | River Ferry Solar 1 | West Union, IL | 303.7 GWh |
| #248 | Concho Valley Solar, LLC | San Angelo, TX | 301.0 GWh |
| #249 | CA Flats Solar 150, LLC | Shandon, CA | 299.6 GWh |
| #250 | Springbok Solar Farm 1 | Cantil, CA | 297.7 GWh |
| #251 | Harry Allen Solar Energy LLC | Apex, NV | 296.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wolf Run Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Alsey | Alsey, IL | 38.7 GWh | 15.9 mi |
| Brown County Wind Turbine | Mount Sterling, IL | 1.3 GWh | 21.9 mi |
| Cass County Renewable Energy Center | Beardstown, IL | 281.2 GWh | 14.1 mi |
| Dallman | Springfield, IL | 809.1 GWh | 40.3 mi |
| Double Back Diamond | Virden, IL | 994.9 GWh | 34.1 mi |
| Factory | Springfield, IL | 78.9 MWh | 38.4 mi |
| Interstate | Springfield, IL | 50.8 GWh | 40.9 mi |
| Lincoln Land Wind | TBD, IL | 1.0 TWh | 21.5 mi |
| Moraine Sands Wind Power | Mason City, IL | 576.6 GWh | 35.9 mi |
| Morgan Solar 1 CSG | Meredosia, IL | 4.1 GWh | 10.6 mi |
| Morgan Solar 1b CSG | Meredosia, IL | 2.9 GWh | 10.6 mi |
| Morgan Solar 2, LLC CSG | Murrayville, IL | 3.7 GWh | 14.6 mi |
| Morgan Solar 4, LLC CSG | Murrayville, IL | 3.7 GWh | 14.3 mi |
| Panther Creek Wind Project | Pittsfield, IL | 89.3 GWh | 29.9 mi |
| Pearl Station | Pearl, IL | 161.0 MWh | 27.3 mi |
| Pike County Wind Power | Pittsfield, IL | 355.0 MWh | 28.5 mi |
| Prairie Creek Solar | Jacksonville, IL | 59.6 GWh | 7.2 mi |
| Reynolds | Springfield, IL | 81.0 MWh | 38.1 mi |
| USS Solar Brick | Standard City, IL | 4.6 GWh | 42.9 mi |
| Viking Solar CSG | Palmyra, IL | 4.9 GWh | 33 mi |