West Memphis Solar Station
5500 Kathy Goodhope Rd, Crawfordsville, AR 72327Plant Summary Information
West Memphis Solar Station is ranked #37 out of 97 power plants in Arkansas in terms of total annual net electricity generation.
West Memphis Solar Station generated 86.7 GWh during the 3-month period between January 2025 to April 2025.
Plant Name | West Memphis Solar Station |
---|---|
Utility Name | Entergy Arkansas LLC |
Location | Crittenden County, AR |
Initial Operation Date | December 2024 |
Last Update | Apr 2025 |
Annual Generation | 124.6 GWh |
Annual Consumption | 425.0 k MMBtu |
Ranked #3,028 out of 12,299 Power Plants Nationwide | |
Ranked #599 out of 6,182 Solar Power Plants Nationwide | |
Ranked #37 out of 97 Arkansas Power Plants | |
Ranked #9 out of 52 Arkansas Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
West Memphis Solar, LLC (2021 to 2023) Entergy Arkansas LLC (2024 to 2024) |
Map of West Memphis Solar Station
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for West Memphis Solar Station.
Monthly Net Generation for West Memphis Solar Station
West Memphis Solar Station Details
Summary Information | |
---|---|
Plant Name | West Memphis Solar Station (65482) |
Plant Address | 5500 Kathy Goodhope Rd, Crawfordsville, AR 72327 |
Utility | Entergy Arkansas LLC (814) |
Latitude, Longitude | 35.15689, -90.31048 |
Generation Dates on File | Dec 2024 to Apr 2025 |
Initial Operation Date | December 2024 |
Annual Generation | 124.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | N/A |
Ash Impoundment | No |
Transmission / Distribution Owner | Entergy Arkansas LLC (814) AR |
Grid Voltage | 161.00 kV |
Energy Storage | No |
Generator WMEM1 Details Operating December 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 180 MW |
Summer Capacity | 180 MW |
Winter Capacity | 180 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2024 |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 52 |
DC Net Capacity | 252 MW |
Crystalline Silicon | Yes |
Thin Film Other | No |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
West Memphis Solar Station Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#589 | Gulf Power Blue Indigo Energy | Cottondale, FL | 127.0 GWh |
#590 | Moffett Solar Project | Ridgeland, SC | 126.2 GWh |
#591 | Grasshopper Solar | Chase City, VA | 125.8 GWh |
#592 | Caden Energix Axton LLC | Axton, VA | 125.7 GWh |
#593 | Solar Star Oregon II | Prineville, OR | 125.5 GWh |
#594 | RE Camelot LLC | Mojave, CA | 125.1 GWh |
#595 | OE_GA3 | Camilla, GA | 125.0 GWh |
#596 | Loggerhead Solar Energy Center | Port St. Lucie, FL | 125.0 GWh |
#597 | Colgreen North Shore Solar Farm | Mecca, CA | 124.8 GWh |
#598 | Nassau Solar Center | Callahan, FL | 124.8 GWh |
#600 | Lamesa II | Lamesa, TX | 124.3 GWh |
#601 | Laurel Oaks Solar | Plant City, FL | 123.8 GWh |
#602 | Desper Solar | Louisa, VA | 123.7 GWh |
#603 | Sweetbay Solar Center | North of Indiantown, FL | 123.2 GWh |
#604 | Macho Springs | Deming, NM | 122.7 GWh |
#605 | Maiden Creek Solar Power Plant | Maiden, NC | 122.4 GWh |
#606 | Conetoe II Solar, LLC | Conetoe, NC | 122.4 GWh |
#607 | Bedford Solar | Chesapeake, VA | 122.3 GWh |
#608 | Jicarilla Solar 2 | Dulce, NM | 122.1 GWh |
#609 | Blue Springs | Marianna, FL | 121.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding West Memphis Solar Station.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Allen | Memphis, TN | 6.7 TWh | 10.8 mi |
Big Cypress Solar, LLC | Crawfordsville, AR | 416.8 GWh | 13 mi |
Dell Power Station | Dell, AR | 3.9 TWh | 51.3 mi |
Delta Wind Farm (MS) | Dundee, MS | 517.2 GWh | 47.7 mi |
Driver Solar | Osceola, AR | 246.1 GWh | 38.5 mi |
Forrest City- Eldridge Road | Forrest City, AR | 2.0 GWh | 29.3 mi |
Forrest City- Prison Site | Forrest City, AR | 1.8 GWh | 30.6 mi |
IKEA Memphis 508 | Cordova, TN | 934.0 MWh | 29 mi |
Jonesboro CWL Solar Park | Jonesboro, AR | 22.1 GWh | 47.9 mi |
Long Lake Solar, LLC | West Helena, AR | 32.5 GWh | 50.6 mi |
Millington Solar Farm | Millington, TN | 97.3 GWh | 29 mi |
Plum Point Energy Station | Osceola, AR | 3.7 TWh | 40.5 mi |
Quartz Solar, LLC | Wynne, AR | 53.9 GWh | 27.4 mi |
Sr Byhalia, LLC | Byhalia, MS | 10.1 GWh | 41.8 mi |
SR Canadaville, LLC | Collierville, TN | 36.1 GWh | 40.4 mi |
SR Innovation - NIKE PV | Memphis, TN | 3.4 GWh | 22 mi |
TVA Southaven Combined Cycle | Southaven, MS | 4.9 TWh | 19.1 mi |
Walnut Bend Solar Station PV | Moro, AR | 112.2 GWh | 48.2 mi |
Wildflower Solar, LLC (MS) | DeSoto, MS | 180.5 GWh | 15.2 mi |
Woodruff Electric Cooperative | Forrest City, AR | 2.2 GWh | 30.2 mi |