Optimist
2664 Yokohama Blvd, West Point, MS 39773Plant Summary Information
Optimist is ranked #27 out of 58 power plants in Mississippi in terms of total annual net electricity generation.
Optimist generated 145.8 GWh during the 3-month period between March 2026 to June 2026.
| Plant Name | Optimist |
|---|---|
| Utility Name | Origis Energy USA, Inc |
| Location | Clay County, MS |
| Initial Operation Date | Not Available |
| Last Update | Jun 2026 |
| Annual Generation | 246.7 GWh |
| Annual Consumption | 850.3 k MMBtu |
| Ranked #2,287 out of 13,094 Power Plants Nationwide | |
| Ranked #381 out of 7,027 Solar Power Plants Nationwide | |
| Ranked #27 out of 58 Mississippi Power Plants | |
| Ranked #4 out of 26 Mississippi Solar Power Plants | |
| Fuel Types | Solar : 99.8% |
Map of Optimist
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Optimist.
Monthly Net Generation for Optimist
Monthly Plant Fuel Consumption for Optimist
Optimist Details
| Summary Information | |
|---|---|
| Plant Name | Optimist (68536) |
| Plant Address | 2664 Yokohama Blvd, West Point, MS 39773 |
| Utility | Origis Energy USA, Inc (58764) |
| Latitude, Longitude | 33.64354, -88.59398 |
| Generation Dates on File | Jan 2026 to Jun 2026 |
| Initial Operation Date | Not Available |
| Annual Generation | 246.7 GWh |
| Fuel Types | Solar : 99.8% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Tennessee Valley Authority (TVA) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | NA |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Tennessee Valley Authority (18642) MS |
| Grid Voltage | 161.00 kV |
| Energy Storage | Yes |
Optimist Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #371 | Bellflower Solar 1 | Lewisville, IN | 255.2 GWh |
| #372 | Felina | Fabens, TX | 255.2 GWh |
| #373 | Oberon IA | Odessa, TX | 254.1 GWh |
| #374 | Edwards Sanborn 1C | Mojave, CA | 253.8 GWh |
| #375 | Mesquite Solar 2, LLC | Tonopah, AZ | 253.7 GWh |
| #376 | Hornshadow Solar, LLC | Castle Dale, UT | 251.5 GWh |
| #377 | Calhoun County Solar Project | Sheridan Township, MI | 251.3 GWh |
| #378 | Imperial Solar Energy Center South | Calexico, CA | 251.1 GWh |
| #379 | Bartonsville Energy Facility, LLC | Stephens, VA | 250.7 GWh |
| #380 | Cattlemen Solar II | Rosebud, TX | 249.7 GWh |
| #382 | Prairie Ronde Solar Farm | Opelousas, LA | 249.0 GWh |
| #383 | Black Hollow Sun | Auit, CO | 248.7 GWh |
| #384 | Copper Mountain Solar 4, LLC | Boulder City, NV | 248.3 GWh |
| #385 | Bluebell Solar II | Sterling, TX | 248.2 GWh |
| #386 | Fish Springs | Reno, NV | 245.2 GWh |
| #387 | Central Line Solar, LLC | Coolidge, AZ | 247.7 GWh |
| #388 | Hunter Solar LLC (UT) | Clawson, UT | 246.5 GWh |
| #389 | Lockhart Solar PV, LLC | Hinkley, CA | 239.8 GWh |
| #390 | Sunshine Valley Solar | Armagosa, NV | 246.3 GWh |
| #391 | Elm Branch Solar 1 | Ennis, TX | 246.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Optimist.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Attala | Sallis, MS | 3.0 TWh | 76.1 mi |
| Bankhead Dam | Northport, AL | 150.8 GWh | 72.4 mi |
| Caledonia | Steens, MS | 4.7 TWh | 18.5 mi |
| Choctaw County | French Camp, MS | 5.1 TWh | 53.6 mi |
| Colbert | Tuscumbia, AL | 731.9 GWh | 87.1 mi |
| Delta's Edge Solar | Greenwood, MS | 155.7 GWh | 87.3 mi |
| GCF US Holdings LLC Columbus Mill | Columbus, MS | 529.9 GWh | 21 mi |
| Golden Triangle | Lowndes, MS | 456.4 GWh | 15.6 mi |
| Golden Triangle II | St.Artesia, MS | 333.3 GWh | 15.8 mi |
| Greene County | Demopolis, AL | 887.2 GWh | 86 mi |
| Holt Dam | Tuscaloosa, AL | 156.6 GWh | 71.2 mi |
| Kemper County | De Kalb, MS | 101.5 GWh | 58.5 mi |
| Meridian II | Meridian, MS | 6.4 GWh | 75.3 mi |
| Meridian III | Meridian, MS | 118.4 GWh | 82.2 mi |
| Muscle Shoals | Cherokee, AL | 435.1 GWh | 87.2 mi |
| Prairie Bluff | Houston, MS | 5.0 GWh | 31.4 mi |
| Quantum Choctaw Power LLC | Ackerman, MS | 3.8 TWh | 39.9 mi |
| Ratcliffe | De Kalb, MS | 3.8 TWh | 69 mi |
| Red Hills Generating Facility | Ackerman, MS | 2.0 TWh | 40.4 mi |
| SR Houston | Houston, MS | 2.0 GWh | 30.3 mi |