Ostrea Solar, LLC
Hwy 24, Moxee, WA 98936Plant Summary Information
Ostrea Solar, LLC is ranked #3 out of 10 solar farms in Washington in terms of total annual net electricity generation.
Ostrea Solar, LLC generated 68.5 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Ostrea Solar, LLC |
|---|---|
| Utility Name | Cypress Creek Renewables |
| Location | Yakima County, WA |
| Initial Operation Date | Not Available |
| Last Update | Aug 2026 |
| Annual Generation | 68.5 GWh |
| Annual Consumption | 233.9 k MMBtu |
| Ranked #3,950 out of 13,301 Power Plants Nationwide | |
| Ranked #1,080 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #82 out of 132 Washington Power Plants | |
| Ranked #3 out of 10 Washington Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Ostrea Solar, LLC (2022 to 2022) Cypress Creek Renewables (2023 to 2025) |
Map of Ostrea Solar, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ostrea Solar, LLC.
Monthly Net Generation for Ostrea Solar, LLC
Monthly Plant Fuel Consumption for Ostrea Solar, LLC
Ostrea Solar, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Ostrea Solar, LLC (66384) |
| Plant Address | Hwy 24, Moxee, WA 98936 |
| Utility | Cypress Creek Renewables (61060) |
| Latitude, Longitude | 46.52884, -119.97922 |
| Generation Dates on File | Jun 2026 to Aug 2026 |
| Initial Operation Date | Not Available |
| Annual Generation | 68.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Bonneville Power Administration (BPAT) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Bonneville Power Administration (1738) WA |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Ostrea Solar, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1070 | SR Bell Buckle | Shelbyville, TN | 71.5 GWh |
| #1071 | Union Ridge Solar | Harrison Township, OH | 71.4 GWh |
| #1072 | Bluebell Solar | Sterling City, TX | 70.6 GWh |
| #1073 | OCI Alamo 4, LLC | Brackettville, TX | 70.5 GWh |
| #1074 | Hayhurst Texas Solar | Orla, TX | 70.1 GWh |
| #1075 | Robin Hollow Solar | West Greenwich, RI | 70.1 GWh |
| #1076 | Ho'Ohana Solar 1 | Waipahu, HI | 53.6 GWh |
| #1077 | Misae Solar IV LLC | Oakwood, TX | 69.8 GWh |
| #1078 | Chaves County Solar II | Roswell, NM | 69.2 GWh |
| #1079 | Jumper Creek Solar Plant | Lake Panasoffkee, FL | 68.9 GWh |
| #1081 | Montpelier Solar Project | Montpelier, OH | 68.1 GWh |
| #1082 | Hazlehurst III | Hazlehurst, GA | 68.1 GWh |
| #1083 | Sonny Solar LLC | Elberton, GA | 67.7 GWh |
| #1084 | Altona Solar, LLC | Centralia, MO | 67.5 GWh |
| #1085 | Ashwood Solar I | Eddyville, KY | 67.2 GWh |
| #1086 | Bonnie Mine Solar | Bartow, FL | 67.2 GWh |
| #1087 | Twelvemile Solar 2 | Durant, OK | 67.0 GWh |
| #1088 | San Isabel Solar, LLC | Trinidad, CO | 66.8 GWh |
| #1089 | Bynum Solar Project | Valley Mills, TX | 66.6 GWh |
| #1090 | Grazing Yak Solar | Calhan, CO | 66.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ostrea Solar, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Big Horn Wind II | Bickleton, WA | 114.3 GWh | 44.9 mi |
| Camas Solar Project | Ellensburg, WA | 10.7 GWh | 38.9 mi |
| Chandler | Benton City, WA | 30.6 GWh | 25.9 mi |
| Columbia Generating Station | Richland, WA | 9.8 TWh | 30.9 mi |
| Cowiche | Tieton, WA | 3.4 GWh | 37.7 mi |
| Eltopia Branch Canal 4.6 | Pasco, WA | 7.7 GWh | 36 mi |
| Goose Prairie Solar | Moxee, WA | 182.2 GWh | 12.4 mi |
| Horn Rapids Solar, Storage and Training | Richland, WA | 4.6 GWh | 33.6 mi |
| Juniper Canyon I Wind Project | Bickleton, WA | 144.1 GWh | 43.7 mi |
| Orchard Avenue 1 | Yakima, WA | 2.9 GWh | 33.5 mi |
| PEC Headworks | Moses Lake, WA | 17.7 GWh | 43.8 mi |
| Penstemon Solar Project | Ellensburg, WA | 11.2 GWh | 38.9 mi |
| Potholes East Canal 66.0 | Pasco, WA | 3.2 GWh | 36 mi |
| Priest Rapids | Mattawa, WA | 4.9 TWh | 8.7 mi |
| Quincy Chute | Quincy, WA | 32.6 GWh | 46.4 mi |
| Roza | Yakima, WA | 38.2 GWh | 24.5 mi |
| Russell D Smith | Othello, WA | 14.4 GWh | 43.6 mi |
| Vantage Wind Energy LLC | Ellensburg, WA | 253.2 GWh | 30.9 mi |
| Wanapum | Beverly, WA | 5.4 TWh | 23.8 mi |
| Wild Horse | Ellensburg, WA | 613.8 GWh | 36.7 mi |