TWE New Bern Solar Project, LLC
1185 NC 55 Hwy West, New Bern, NC 28563Plant Summary Information
TWE New Bern Solar Project, LLC is ranked #561 out of 739 solar farms in North Carolina in terms of total annual net electricity generation.
TWE New Bern Solar Project, LLC generated 1.6 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | TWE New Bern Solar Project, LLC |
---|---|
Utility Name | Cypress Creek Renewables |
Location | Craven County, NC |
Initial Operation Date | August 2016 |
Last Update | Dec 2022 |
Annual Generation | 6.1 GWh |
Annual Consumption | 22.4 k MMBtu |
Ranked #7,245 out of 11,455 Power Plants Nationwide | |
Ranked #2,402 out of 5,173 Solar Power Plants Nationwide | |
Ranked #643 out of 860 North Carolina Power Plants | |
Ranked #561 out of 739 North Carolina Solar Power Plants | |
Fuel Types | Solar |
Previous Operator |
TWE New Bern Solar Project, LLC (2015 to 2017) Cypress Creek Renewables (2018 to 2022) |
Map of TWE New Bern Solar Project, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for TWE New Bern Solar Project, LLC.
Monthly Net Generation for TWE New Bern Solar Project, LLC
TWE New Bern Solar Project, LLC Details
Summary Information | |
---|---|
Plant Name | TWE New Bern Solar Project, LLC (60191) |
Plant Address | 1185 NC 55 Hwy West New Bern, NC 28563 |
Utility | Cypress Creek Renewables (61060) |
Latitude, Longitude | 35.15427, -77.13432 |
Generation Dates on File | Aug 2016 to Dec 2022 |
Initial Operation Date | August 2016 |
Annual Generation | 6.1 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 15-286-000 |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | 15-286-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | SERC |
Balancing Authority | Duke Energy Carolinas (DUK) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
Grid Voltage | 22.86 kV |
Energy Storage | No |
Generator FLS1 Details Operating August 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 4 MW |
Summer Capacity | 4 MW |
Winter Capacity | 4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | August 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 20 |
DC Net Capacity | 4.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
TWE New Bern Solar Project, LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2392 | Putnam Erickson | Eatonton, GA | 6.1 GWh |
#2393 | DSM Solar | Columbia, NJ | 6.1 GWh |
#2394 | Union Springs 963 | Union Spring, NY | 6.1 GWh |
#2395 | Merrill Road Solar | Lewiston, ME | 6.1 GWh |
#2396 | Gap Pacific Distribution Center | Fresno, CA | 6.1 GWh |
#2397 | Pine Island Solar CSG | Pine Island, MN | 6.1 GWh |
#2398 | Sangerfield Solar CSG | Waterville, NY | 6.1 GWh |
#2399 | South Goshen Community Solar | Goshen, NY | 6.0 GWh |
#2400 | Harwich Landfill | Harwich, MA | 6.1 GWh |
#2401 | Wright Cuddyer CSG | St. Michael, MN | 6.1 GWh |
#2403 | Farmersville | Farmersville, CA | 6.1 GWh |
#2404 | Horn Rapids Solar, Storage and Training | Richland, WA | 5.8 GWh |
#2405 | Malech Solar Farm | San Jose, CA | 6.1 GWh |
#2406 | Wilbraham | Wilbraham, MA | 6.0 GWh |
#2407 | Kearsarge Amesbury Hybrid | Amesbury, MA | 5.9 GWh |
#2408 | Linden Hawk Rise Solar CSG | Linden, NJ | 6.0 GWh |
#2409 | Nextsun Energy Littleton | Littleton, MA | 6.0 GWh |
#2410 | Yardville Solar Farm | Hamilton, NJ | 6.0 GWh |
#2411 | Montana Solar Facility | El Paso, TX | 6.0 GWh |
#2412 | Ararat Rock Solar, LLC | Mount Airy, NC | 6.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding TWE New Bern Solar Project, LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Andrew Solar | New Bern, NC | 9.5 GWh | 1.5 mi |
Bayboro Solar Farm | Alliance, NC | 9.8 GWh | 18.3 mi |
Beaufort Solar, LLC | Chocowinity, NC | 29.9 GWh | 20.8 mi |
Coogee Solar | Grantsboro, NC | 11.1 GWh | 17.6 mi |
Craven County Wood Energy LP | New Bern, NC | 331.9 GWh | 2.5 mi |
Daystar Solar | Pollocksville, NC | 10.1 GWh | 9.1 mi |
Grove Solar | New Bern, NC | 13.8 GWh | 1.4 mi |
Hood Farm Solar, LLC | Trenton, NC | 9.7 GWh | 20.8 mi |
International Paper Co. - New Bern Mill | New Bern, NC | 214.1 GWh | 4.1 mi |
Lang Solar Farm | La Grange, NC | 10.1 GWh | 21 mi |
New Bern | New Bern, NC | 24.9 GWh | 5.3 mi |
New Bern Farm | Ernul, NC | 9.1 GWh | 5.8 mi |
Pecan Grove Solar, LLC | New Bern, NC | 9.3 GWh | 6.6 mi |
Plott Hound Solar | New Bern, NC | 8.0 GWh | 2.6 mi |
Pollocksville Solar | Pollocksville, NC | 9.3 GWh | 11.8 mi |
Porter Solar | New Bern, NC | 8.6 GWh | 5.5 mi |
Sweet Tea Solar, LLC | New Bern, NC | 6.7 GWh | 0.5 mi |
Trent River Farm | New Bern, NC | 9.6 GWh | 7.2 mi |
Trent River Solar, LLC | Pollocksville, NC | 147.4 GWh | 13.1 mi |
Wyse Fork Solar Farm, LLC | Dover, NC | 3.4 GWh | 21.2 mi |