Auten Road Farm, LLC

2960 Monterrey Park Dr, Gastonia, NC 28054

Plant Summary Information

Auten Road Farm, LLC is ranked #361 out of 746 solar farms in North Carolina in terms of total annual net electricity generation.

Auten Road Farm, LLC generated 2.0 GWh during the 3-month period between September 2024 to December 2024.

Plant NameAuten Road Farm, LLC
Utility NameCypress Creek Renewables
LocationGaston County, NC
Initial Operation DateDecember 2017
Last Update Dec 2024
Annual Generation 8.6 GWh
Annual Consumption 31.3 k MMBtu
Ranked #6,606 out of 12,332 Power Plants Nationwide
Ranked #2,229 out of 6,397 Solar Power Plants Nationwide
Ranked #435 out of 855 North Carolina Power Plants
Ranked #361 out of 746 North Carolina Solar Power Plants
Fuel Types Solar

Map of Auten Road Farm, LLC

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Auten Road Farm, LLC.

Create Your Account Today

Monthly Net Generation for Auten Road Farm, LLC

Monthly Plant Fuel Consumption for Auten Road Farm, LLC

Auten Road Farm, LLC Details

Summary Information
Plant NameAuten Road Farm, LLC (60634)
Plant Address2960 Monterrey Park Dr, Gastonia, NC 28054
UtilityCypress Creek Renewables (61060)
Latitude, Longitude35.30498, -81.13735
Generation Dates on FileJan 2018 to Dec 2024
Initial Operation DateDecember 2017
Annual Generation 8.6 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number14-171-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionSERC
Balancing AuthorityDuke Energy Carolinas (DUK)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerDuke Energy Progress - (NC) (3046) NC
Grid Voltage 12.47 kV
Energy StorageNo

Generator PV1 Details Operating December 2017

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity5 MW
Summer Capacity5 MW
Winter Capacity5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2017
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Fixed TiltYes
Azimuth Angle180
Tilt Angle20
DC Net Capacity7 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Auten Road Farm, LLC Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#2219ADC VarnerGould, AR8.6 GWh
#2220Bayboro Solar FarmAlliance, NC8.6 GWh
#2221Route 19 #2 Community Solar FarmPike, NY8.6 GWh
#2222Ameresco HCE Solar LLCGlenwood Springs, CO8.6 GWh
#2223Bladenboro Solar 2Bladenboro, NC8.6 GWh
#2224Sadiebrook NC SolarClarkton, NC8.6 GWh
#2225Blacksmith Road Solar 1Falmouth, MA8.5 GWh
#2226Meadowbrook Solar FarmRockwell, NC8.6 GWh
#2227Syncarpha Blandford Hybrid CSGBlandford, MA8.5 GWh
#2228Beacon Solar, LLCEasthampton, MA8.5 GWh
#2230Imeson SolarJscksonville, FL8.6 GWh
#2231Somers Solar Center, LLCSomers, CT8.6 GWh
#2232Judd Road SolarOriskany, NY8.6 GWh
#2233Kearney NPPD Solar ProjectKearney, NE8.6 GWh
#2234Sedberry FarmCarthage, NC8.6 GWh
#2235Lahr 1, LLCWakefield Township, MN8.6 GWh
#2236Space Coast Next Gen Solar EnergyMerritt Island, FL8.6 GWh
#2237Hertford Solar FarmHertford, NC8.6 GWh
#2238Red Oak Solar Farm, LLCNashville, NC8.6 GWh
#2239CyrilCyril, OK8.6 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Auten Road Farm, LLC.

Plant NamePlant LocationAnnual GenerationDistance
BattlegroundKings Mountain, NC5.2 GWh12.4 mi
Cowans FordStanley, NC182.0 GWh13.5 mi
DE Solar 1725 Drywall DrMt. Holly, NC902.0 MWh8.1 mi
Freemont Solar Center LLCStanley, NC7.2 GWh11.6 mi
G G AllenBelmont, NC197.9 GWh10.6 mi
Gaston County Renewable Energy CenterDallas, NC19.8 GWh5.9 mi
Gaston Memorial HospitalGastonia, NC22.0 MWh2.1 mi
Gaston Solar Power PlantCherryville Township, NC44.0 GWh1.2 mi
Gastonia Prime Power ParkDallas, NC162.0 MWh4.1 mi
Gastonia Solar CenterGastonia, NC7.9 GWh6 mi
Gastonia, Tulip DriveGastonia, NC206.0 MWh4 mi
High Shoals Hydro (NC)High Shoals, NC3.5 GWh7.1 mi
High Shoals PV1High Shoals, NC28.9 GWh7.8 mi
Lincoln CombustionStanley, NC1.0 TWh10.5 mi
Lincolnton High SchoolLincolnton, NC87.0 MWh13.8 mi
Long Creek Waste Water PlantDallas, NC365.0 MWh0.5 mi
Mariposa Solar Center LLCStanley, NC8.9 GWh5.5 mi
Mountain IslandMount Holly, NC131.1 GWh8.7 mi
Reventure ParkCharlotte, NC23.6 GWh7.8 mi
York Road Solar I, LLCKings Mountain, NC3.5 GWh12.5 mi