FLS Solar 230 (Warren)
2781 N NC 11 and 903 Highway, Albertson, NC 28508Plant Summary Information
FLS Solar 230 (Warren) is ranked #418 out of 762 solar farms in North Carolina in terms of total annual net electricity generation.
FLS Solar 230 (Warren) generated 1.8 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | FLS Solar 230 (Warren) |
|---|---|
| Utility Name | Cypress Creek Renewables |
| Location | Duplin County, NC |
| Initial Operation Date | May 2015 |
| Last Update | Dec 2025 |
| Annual Generation | 7.7 GWh |
| Annual Consumption | 28.3 k MMBtu |
| Ranked #7,083 out of 13,081 Power Plants Nationwide | |
| Ranked #2,632 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #491 out of 876 North Carolina Power Plants | |
| Ranked #418 out of 762 North Carolina Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
FLS Solar 230 (Warren) (2014 to 2017) Cypress Creek Renewables (2018 to 2025) |
Map of FLS Solar 230 (Warren)
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for FLS Solar 230 (Warren).
Monthly Net Generation for FLS Solar 230 (Warren)
Monthly Plant Fuel Consumption for FLS Solar 230 (Warren)
FLS Solar 230 (Warren) Details
| Summary Information | |
|---|---|
| Plant Name | FLS Solar 230 (Warren) (59646) |
| Plant Address | 2781 N NC 11 and 903 Highway, Albertson, NC 28508 |
| Utility | Cypress Creek Renewables (61060) |
| Latitude, Longitude | 35.01611, -77.82194 |
| Generation Dates on File | May 2015 to Dec 2025 |
| Initial Operation Date | May 2015 |
| Annual Generation | 7.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 13-563-000 |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 13-563-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Duke Energy Progress East (CPLE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Duke Energy Progress - (NC) (3046) NC |
| Grid Voltage | 22.86 kV |
| Energy Storage | No |
Generator FLS1 Details Operating May 2015
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 4.8 MW |
| Summer Capacity | 4.8 MW |
| Winter Capacity | 4.8 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | May 2015 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 20 |
| DC Net Capacity | 6.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
FLS Solar 230 (Warren) Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2622 | Sanford CGA | Sanford, ME | 7.8 GWh |
| #2623 | Bright Hill Solar LLC(CSG) | Dansville, NY | 7.8 GWh |
| #2624 | Farmington Holdco Solar | Farmington, MN | 7.8 GWh |
| #2625 | Claverack Creek Solar | Hudson, NY | 7.8 GWh |
| #2626 | Eagle Solar | Warrenton, NC | 7.8 GWh |
| #2627 | Pivot Solar 35 | La Salle, CO | 7.8 GWh |
| #2628 | NMSU Solar and Storage | Las Cruces, NM | 7.8 GWh |
| #2629 | Beacon Solar, LLC | Easthampton, MA | 7.8 GWh |
| #2630 | Webster Holdco Solar CSG | Webster, MN | 7.8 GWh |
| #2631 | Syncarpha Northbridge II Hybrid CSG | Whitinsville, MA | 7.6 GWh |
| #2633 | Nitro Solar | Smitfield, NC | 7.7 GWh |
| #2634 | Reidsville Renewables, Inc. | Reidsville, GA | 7.7 GWh |
| #2635 | Source Power NY II - Locust 1 | Cortland, NY | 7.7 GWh |
| #2636 | County Home Solar LLC | Rockingham, NC | 7.7 GWh |
| #2637 | Prairie Fire | Tucson, AZ | 7.7 GWh |
| #2638 | Judd Road Solar | Oriskany, NY | 7.7 GWh |
| #2639 | Ray Wilson Solar | Advance, NC | 7.7 GWh |
| #2640 | MD - EDFR - Phase II - Lewiston | Lewiston, ME | 7.7 GWh |
| #2641 | Salisbury Solar | Salisbury, NC | 7.7 GWh |
| #2642 | Podunque Road CSG | Rushford, NY | 7.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding FLS Solar 230 (Warren).
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Albertson Solar LLC | Albertson, NC | 9.9 GWh | 5.3 mi |
| Atkinson Farm Solar | Beulaville, NC | 8.8 GWh | 8.4 mi |
| Atkinson Solar II | Beulaville, NC | 2.8 GWh | 8.4 mi |
| Beulaville | Beulaville, NC | 3.0 GWh | 8.4 mi |
| Cedar Solar, LLC | Beulaville, NC | 8.9 GWh | 7.4 mi |
| Duplin Solar I LLC (160 Houston Lane) | Kenansville, NC | 2.3 GWh | 9.8 mi |
| Duplin Solar LLC | Warsaw, NC | 8.6 GWh | 14.5 mi |
| Freight Line Solar, LLC | Pink Hill, NC | 4.1 GWh | 4.7 mi |
| Harvest Beulaville, LLC | Beulaville, NC | 2.9 GWh | 8 mi |
| Innovative Solar 35 | Albertson, NC | 2.8 GWh | 2.6 mi |
| Innovative Solar 54 | Kinston, NC | 98.5 GWh | 15 mi |
| Kenansville | Kenansville, NC | 3.2 GWh | 12.9 mi |
| Kenansville Solar 2, LLC | Kenansville, NC | 3.5 GWh | 9.9 mi |
| Kennedy Solar, LLC | Warsaw, NC | 8.7 GWh | 15.3 mi |
| Lanier Solar | Beulaville, NC | 9.7 GWh | 8.1 mi |
| Long Henry Solar | Seven Springs, NC | 1.8 GWh | 13.1 mi |
| Ludie Brown Solar Energy Storage | Chinquapin, NC | 3.3 GWh | 13.1 mi |
| PG Solar, LLC | Mt Olive, NC | 2.9 GWh | 15.2 mi |
| Warsaw II | Warsaw, NC | 3.3 GWh | 12.9 mi |
| Woodland Church Farm | Albertson, NC | 9.3 GWh | 3.4 mi |