Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Winfield | Appalachian Power Co | Winfield, WV | PJM Interconnection, LLC (PJM) | 84.4 GWh | Dec 1937 | Dec 2024 | Water |
| Winfield Solar | Winfield Solar I, LLC | Winfield, MO | Midcontinent Independent System Operator, Inc. (MISO) | 218.7 GWh | - | Feb 2026 | Solar |
| East 12th Street | City of Winfield - (KS) | Winfield, KS | Southwest Power Pool (SWPP) | 6.7 GWh | May 1970 | Dec 2024 | Natural Gas : 99.9% |
| Waste Water Plant Generator | City of Winfield - (KS) | Winfield, KS | Southwest Power Pool (SWPP) | 6.0 MWh | Feb 1993 | Dec 2024 | Distillate Fuel Oil |
| West 14th Street | City of Winfield - (KS) | Winfield, KS | Southwest Power Pool (SWPP) | 1.3 GWh | Jul 1962 | Dec 2024 | Natural Gas |
| Two Mile Solar | Cypress Creek Renewables | Winfall, NC | PJM Interconnection, LLC (PJM) | 8.8 GWh | May 2015 | Dec 2024 | Solar |
| Solidago Solar | Dominion Energy Inc. | Windsor, VA | PJM Interconnection, LLC (PJM) | 38.3 GWh | Jul 2023 | Dec 2024 | Solar |
| Windsor Hwy 17 Solar | Greenbacker Renewable Energy Corporation | Windsor, NC | PJM Interconnection, LLC (PJM) | 11.1 GWh | Oct 2021 | Dec 2024 | Solar |
| Windsor Cooper HIill Solar, LLC | Duke Energy Renewables Services | Windsor, NC | PJM Interconnection, LLC (PJM) | 9.0 GWh | Jul 2015 | Dec 2024 | Solar |
| Windsor Solar | Strata Manager, LLC | Windsor, NC | PJM Interconnection, LLC (PJM) | 9.8 GWh | Nov 2014 | Dec 2024 | Solar |
| Rainbow (CT) | Farmington River Power Company | Windsor, CT | ISO New England (ISNE) | 22.2 GWh | Nov 1925 | Feb 2026 | Water |
| SR Skylark C | SR Skylark C, LLC | Windsor, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 2.3 GWh | Nov 2019 | Dec 2024 | Solar |
| Windsor Floating Solar | CA ODEVI LLC | Windsor, CA | California Independent System Operator (CISO) | 2.5 GWh | Oct 2020 | Dec 2024 | Solar |
| Bradley Energy Center | Ameresco Select Inc | Windsor Locks, CT | ISO New England (ISNE) | 11.8 GWh | Oct 2002 | Dec 2024 | Natural Gas |
| Algonquin Windsor Locks | Ahlstrom Power Windsor Locks LLC | Windsor Locks, CT | ISO New England (ISNE) | 147.0 GWh | Dec 1989 | Feb 2026 | Natural Gas : 92.2% Distillate Fuel Oil : 7.8% |
| Windom | City of Windom | Windom, MN | Midcontinent Independent System Operator, Inc. (MISO) | 23.0 MWh | May 1980 | Dec 2024 | Distillate Fuel Oil |
| Shannon Wind | Shannon Wind LLC | Windhorst, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 439.4 GWh | Nov 2015 | Feb 2026 | Wind |
| Scotland Dam | FirstLight Power Resources Services LLC | Windham, CT | ISO New England (ISNE) | 6.6 GWh | Dec 1936 | Dec 2024 | Water |
| Cedar Creek Solar, LLC | Southeastern Solar Farm Fund, LLC | Winder, GA | Southern Company Services, Inc. - Trans (SOCO) | 3.6 GWh | Sep 2017 | Dec 2024 | Solar |
| Georgia LFG Oak Grove Plant | Cube District Energy, LLC | Winder, GA | Southern Company Services, Inc. - Trans (SOCO) | 38.7 GWh | Jul 2016 | Dec 2024 | Landfill Gas : 77.7% Natural Gas : 22.3% |
| Frederick County LFGTE Facility | Frederick County Virginia | Winchester, VA | PJM Interconnection, LLC (PJM) | 13.0 GWh | Oct 2010 | Dec 2024 | Landfill Gas |
| HP Hood CT | HP Hood LLC | Winchester, VA | PJM Interconnection, LLC (PJM) | 110.4 GWh | May 2015 | Feb 2026 | Natural Gas |
| The Village at Orchard Ridge (TVOR) | Distributed Solar Development, LLC | Winchester, VA | PJM Interconnection, LLC (PJM) | 2.2 GWh | Feb 2023 | Dec 2024 | Solar |
| Winchester Power Park | Lower Colorado River Authority | Winchester, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 51.5 GWh | Apr 2010 | Dec 2024 | Natural Gas |
| Tims Ford | Tennessee Valley Authority | Winchester, TN | Tennessee Valley Authority (TVA) | 37.3 GWh | Feb 1972 | Dec 2024 | Water |
| J K Smith | East Kentucky Power Coop, Inc | Winchester, KY | PJM Interconnection, LLC (PJM) | 1.0 TWh | Dec 1998 | Feb 2026 | Natural Gas : 99.6% |
| Cooperative Solar One | East Kentucky Power Coop, Inc | Winchester, KY | PJM Interconnection, LLC (PJM) | 12.7 GWh | Oct 2017 | Dec 2024 | Solar |
| Headwaters Wind Farm LLC | Headwaters Wind Farm LLC | Winchester, IN | PJM Interconnection, LLC (PJM) | 617.8 GWh | Nov 2014 | Dec 2024 | Wind |
| Platt Hill | LSE Pictor LLC | Winchester, CT | ISO New England (ISNE) | 2.4 GWh | Dec 2021 | Dec 2024 | Solar |
| Diamond Valley Solar Project | Ecos Energy LLC | Winchester, CA | California Independent System Operator (CISO) | 2.2 GWh | Dec 2014 | Dec 2024 | Solar |
| Diamond Valley Lake | Metropolitan Water District of S CA | Winchester, CA | California Independent System Operator (CISO) | 5.4 GWh | Apr 2001 | Apr 2024 | Water |
| 580 River Solar | NuGen Capital Management | Winchendon, MA | ISO New England (ISNE) | 4.7 GWh | Aug 2018 | Dec 2024 | Solar |
| Winchendon Solar | Altus Power America Management, LLC | Winchendon, MA | ISO New England (ISNE) | 2.5 GWh | Mar 2014 | Dec 2024 | Solar |
| Winchendon Landfill Solar | Onyx Asset Services Group | Winchendon, MA | ISO New England (ISNE) | 2.8 GWh | Sep 2018 | Dec 2024 | Solar |
| Happy Hollow CSG Hybrid | REA Investments, LLC | Winchendon, MA | ISO New England (ISNE) | 8.6 GWh | Sep 2019 | Dec 2024 | Solar |
| Balm Solar | Tampa Electric Co | Wimauma, FL | Tampa Electric Company (TEC) | 141.7 GWh | Aug 2018 | Feb 2026 | Solar |
| Wimauma Solar and Battery Storage | Tampa Electric Co | Wimauma, FL | Tampa Electric Company (TEC) | 113.7 GWh | Mar 2020 | Feb 2026 | Solar |
| Grange Hall Solar | Tampa Electric Co | Wimauma, FL | Tampa Electric Company (TEC) | 121.5 GWh | Dec 2018 | Feb 2026 | Solar |
| Bullfrog Creek Solar | Tampa Electric Co | Wimauma, FL | Tampa Electric Company (TEC) | 165.1 GWh | Nov 2024 | Feb 2026 | Solar |
| Cottonmouth Ranch Solar | Tampa Electric Co | Wimauma, FL | Tampa Electric Company (TEC) | 28.2 GWh | - | Feb 2026 | Solar |
| Wilton Wind II LLC | Wilton Wind II LLC | Wilton, ND | Midcontinent Independent System Operator, Inc. (MISO) | 199.6 GWh | Oct 2009 | Dec 2024 | Wind |
| Baldwin Wind LLC | Baldwin Wind LLC | Wilton, ND | Midcontinent Independent System Operator, Inc. (MISO) | 381.1 GWh | Nov 2010 | Dec 2024 | Wind |
| FPL Energy Burleigh County Wind | FPL Energy Burleigh County Wind LLC | Wilton, ND | Midcontinent Independent System Operator, Inc. (MISO) | 189.7 GWh | Nov 2005 | Dec 2024 | Wind |
| Pleasant Street | Greenbacker Renewable Energy Corporation | Wilton, ME | ISO New England (ISNE) | 4.9 GWh | Nov 2023 | Dec 2024 | Solar |
| Wilton | City of Wilton - (IA) | Wilton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 MWh | Dec 1991 | Dec 2024 | Distillate Fuel Oil |
| Eastern Iowa Solar | Central Iowa Power Cooperative | Wilton, IA | Midcontinent Independent System Operator, Inc. (MISO) | 2.9 GWh | Oct 2016 | Dec 2024 | Solar |
| E C Gaston | Alabama Power Co | Wilsonville, AL | Southern Company Services, Inc. - Trans (SOCO) | 3.8 TWh | Apr 1960 | Feb 2026 | Bituminous Coal : 50.9% Natural Gas : 49.1% |
| Sage Draw Wind | Sage Draw Wind, LLC | Wilson, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 1.2 TWh | Jul 2021 | Feb 2026 | Wind |
| Wilson Solar Farm 7 | GCL New Energy, Inc. | Wilson, NC | Duke Energy Progress East (CPLE) | 14.2 GWh | Mar 2017 | Dec 2023 | Solar |
| Wilson Solar Farm 1 | GCL New Energy, Inc. | Wilson, NC | Duke Energy Progress East (CPLE) | 4.9 GWh | Mar 2017 | Dec 2023 | Solar |
| Wilson Solar Farm 3 | GCL New Energy, Inc. | Wilson, NC | Duke Energy Progress East (CPLE) | 15.0 GWh | Mar 2017 | Dec 2023 | Solar |
| Wilson Solar Farm 4 | GCL New Energy, Inc. | Wilson, NC | Duke Energy Progress East (CPLE) | 9.6 GWh | Mar 2017 | Dec 2023 | Solar |
| Wilson Solar Farm 5 | GCL New Energy, Inc. | Wilson, NC | Duke Energy Progress East (CPLE) | 14.5 GWh | Apr 2017 | Dec 2023 | Solar |
| Wilson Solar Farm 6 | GCL New Energy, Inc. | Wilson, NC | Duke Energy Progress East (CPLE) | 11.7 GWh | Apr 2017 | Dec 2023 | Solar |
| Jackson Solar Farm | GCL New Energy, Inc. | Wilson, NC | Duke Energy Progress East (CPLE) | 6.0 GWh | Feb 2017 | Dec 2023 | Solar |
| Smithfield Packaged Meats Corp (Wilson) | Smithfield Packaged Meats Corp (Wilson) | Wilson, NC | Duke Energy Progress East (CPLE) | 298.0 MWh | Jan 2002 | Dec 2024 | Distillate Fuel Oil |
| Rivercrest SD | Entegrity Solar Rivercrest SD, LLC | Wilson, AR | Midcontinent Independent System Operator, Inc. (MISO) | 2.2 GWh | Feb 2022 | Dec 2024 | Solar |
| Aziscohos Hydroelectric Project | Brookfield White Pine Hydro LLC | Wilson Mills, ME | ISO New England (ISNE) | 36.3 GWh | May 1988 | Dec 2024 | Water |
| Wolf Run Energy | Wolf Run Energy LLC | Wilmot Township, PA | PJM Interconnection, LLC (PJM) | 44.9 GWh | May 2019 | Dec 2024 | Natural Gas |
| Nobles 2 Wind Project | Nobles 2 Power Partners, LLC | Wilmont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 950.2 GWh | Nov 2020 | Feb 2026 | Wind |
| Noble Ridge LLC | RENEW Energy Inc | Wilmont, MN | Midcontinent Independent System Operator, Inc. (MISO) | 61.0 MWh | Nov 2001 | Dec 2024 | Wind |
| SunEdison LV Sutton Plant Site | SunE NC Progress 1 LLC | Wilmington, NC | Duke Energy Progress East (CPLE) | 1.1 GWh | Nov 2008 | Dec 2024 | Solar |
| South Atlantic Services Solar Farm I | South Atlantic Services Inc | Wilmington, NC | Duke Energy Carolinas (DUK) | 2.9 GWh | Nov 2013 | Dec 2024 | Solar |
| L V Sutton Combined Cycle | Duke Energy Progress - (NC) | Wilmington, NC | Duke Energy Progress East (CPLE) | 3.6 TWh | Oct 2013 | Feb 2026 | Natural Gas |
| Wilmington Solar | MN8 Energy LLC | Wilmington, MA | ISO New England (ISNE) | 2.6 GWh | Oct 2015 | Dec 2024 | Solar |
| Kearsarge Wilmington | Kearsarge Wilmington LLC | Wilmington, MA | ISO New England (ISNE) | 2.3 GWh | Nov 2017 | Dec 2024 | Solar |
| WHA Southbridge Solar Park CSG | Ecogy Delaware II LLC. | Wilmington, DE | PJM Interconnection, LLC (PJM) | 2.1 GWh | May 2018 | Dec 2024 | Solar |
| South Campus Solar | JPMorgan Chase Bank | Wilmington, DE | PJM Interconnection, LLC (PJM) | 2.5 GWh | Jul 2011 | Dec 2024 | Solar |
| AGT001 Centerville Fuel Cell | 2016 ESA Project Company, LLC | Wilmington, DE | PJM Interconnection, LLC (PJM) | 10.1 GWh | Feb 2019 | Dec 2024 | Natural Gas |
| Hay Road | Calpine Mid-Atlantic Generation LLC | Wilmington, DE | PJM Interconnection, LLC (PJM) | 2.4 TWh | Apr 1989 | Feb 2026 | Natural Gas : 95.3% Distillate Fuel Oil : 4.7% |
| Christiana | Calpine Mid-Atlantic Generation LLC | Wilmington, DE | PJM Interconnection, LLC (PJM) | 217.0 MWh | May 1973 | Dec 2024 | Distillate Fuel Oil |
| Edge Moor | Calpine Mid-Atlantic Generation LLC | Wilmington, DE | PJM Interconnection, LLC (PJM) | 327.6 GWh | Nov 1954 | Dec 2024 | Natural Gas : 94.9% Residual Fuel Oil : 5.1% |
| Harbor | Los Angeles Department of Water & Power | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 90.2 GWh | Jun 1949 | Feb 2026 | Natural Gas |
| Los Angeles Harbor College | Los Angeles Community College District | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 2.5 GWh | Sep 2010 | Dec 2024 | Solar |
| Wilmington Hydrogen Plant | Air Products & Chemicals Inc | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 164.4 GWh | Feb 1996 | Feb 2026 | Waste Heat |
| Equilon Los Angeles Refining | Tesoro Refining and Marketing Company | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 239.9 GWh | Nov 1982 | Nov 2025 | Other Gas : 97.9% Natural Gas : 2.1% |
| Harbor Cogen | Harbor Cogeneration Co. | Wilmington, CA | California Independent System Operator (CISO) | 17.4 GWh | Nov 1988 | Dec 2024 | Natural Gas |
| Los Angeles Refinery Wilmington | Phillips 66 - Los Angeles | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 365.4 GWh | Apr 1984 | Nov 2025 | Other Gas : 58.4% Natural Gas : 41.6% |
| Colon PV | Los Angeles Department of Water & Power | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 1.2 GWh | Nov 2015 | Dec 2024 | Solar |
| Valero Wilmington Cogeneration Plant | Valero Wilmington | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 228.2 GWh | Oct 2017 | Dec 2024 | Natural Gas |
| Pierce College | Los Angeles Community College District | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 2.4 GWh | Dec 2012 | Dec 2024 | Solar |
| HCE Johnston I, LLC | HCE Johnston I, LLC | Willow Springs, NC | Duke Energy Carolinas (DUK) | 3.5 GWh | Nov 2015 | Dec 2024 | Solar |
| Page Solar | Page Solar Farm, LLC | Willow Spring, NC | Duke Energy Progress East (CPLE) | 2.5 GWh | Nov 2018 | Dec 2024 | Solar |
| Sunfish Farm | Cypress Creek Renewables | Willow Spring, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Nov 2015 | Dec 2024 | Solar |
| Willow Island Hydroelectric Plant | American Mun Power-Ohio, Inc | Willow Island, WV | PJM Interconnection, LLC (PJM) | 182.5 GWh | Dec 2015 | Dec 2024 | Water |
| Pleasants Power Station | Omnis Pleasants, LLC | Willow Island, WV | PJM Interconnection, LLC (PJM) | 713.2 GWh | Mar 1979 | Feb 2026 | Bituminous Coal : 96.8% Natural Gas : 3.2% |
| Mohave County Wind Farm | Mohave County Wind Farm | Willow Beach, AZ | Western Area Power Administration - Desert Southwest Region (WALC) | 962.8 GWh | Nov 2020 | Feb 2026 | Wind |
| Willmar Municipal SW Substation | Willmar Municipal Utilities | Willmar, MN | Midcontinent Independent System Operator, Inc. (MISO) | 22.0 MWh | May 2000 | Dec 2024 | Distillate Fuel Oil |
| Willmar Municipal East Substation | Willmar Municipal Utilities | Willmar, MN | Midcontinent Independent System Operator, Inc. (MISO) | 23.0 MWh | May 2000 | Dec 2024 | Distillate Fuel Oil |
| Willmar | Willmar Municipal Utilities | Willmar, MN | Midcontinent Independent System Operator, Inc. (MISO) | 5.0 GWh | Aug 1956 | Jul 2024 | Wind |
| GMP Solar - Williston | Green Mountain Power Corp | Williston, VT | ISO New England (ISNE) | 6.1 GWh | Oct 2016 | Feb 2026 | Solar |
| Pioneer Generation Station | Basin Electric Power Coop | Williston, ND | Southwest Power Pool (SWPP) | 1.1 TWh | Aug 2013 | Dec 2024 | Natural Gas |
| Whistling Duck I | Origis Energy USA, Inc | Williston, FL | Duke Energy Florida, Inc. (FPC) | 26.3 GWh | - | Feb 2026 | Solar |
| Lewis Creek | Entergy Texas Inc. | Willis, TX | Midcontinent Independent System Operator, Inc. (MISO) | 1.9 TWh | Nov 1970 | Feb 2026 | Natural Gas |
| Montgomery County | Entergy Texas Inc. | Willis, TX | Midcontinent Independent System Operator, Inc. (MISO) | 5.9 TWh | Dec 2020 | Feb 2026 | Natural Gas |
| Williamstown Solar | CVI CleanCapital Solar 1 LLC | Williamstown, VT | ISO New England (ISNE) | 2.4 GWh | Nov 2012 | Dec 2024 | Solar |
| GMP Solar - Williamstown | Green Mountain Power Corp | Williamstown, VT | ISO New England (ISNE) | 6.9 GWh | Nov 2016 | Feb 2026 | Solar |
| Township of Monroe - Williamstown MS | Distributed Solar Development, LLC | Williamstown, NJ | PJM Interconnection, LLC (PJM) | 1.7 GWh | Nov 2022 | Dec 2024 | Solar |
| Township of Monroe - Williamstown HS | Distributed Solar Development, LLC | Williamstown, NJ | PJM Interconnection, LLC (PJM) | 1.4 GWh | Nov 2022 | Dec 2024 | Solar |
| Williams College - Campus CHP | President & Trustees of Williams College | Williamstown, MA | ISO New England (ISNE) | 1.3 GWh | Feb 2003 | Dec 2024 | Natural Gas : 84.0% Distillate Fuel Oil : 16.0% |
Summary of Power Plants By State
Figures are based on February 2026 generation numbers.| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Alabama | # 10 | 77 | 10,522.92 GWh |
| Alaska | # 48 | 139 | 547.09 GWh |
| Arizona | # 16 | 184 | 7,875.02 GWh |
| Arkansas | # 25 | 114 | 5,134.19 GWh |
| California | # 5 | 1,677 | 13,090.02 GWh |
| Colorado | # 31 | 294 | 4,129.24 GWh |
| Connecticut | # 32 | 162 | 3,713.11 GWh |
| Delaware | # 49 | 33 | 489.00 GWh |
| District of Columbia | # 51 | 16 | 15.28 GWh |
| Florida | # 3 | 334 | 18,619.02 GWh |
| Georgia | # 8 | 248 | 10,834.93 GWh |
| Hawaii | # 47 | 70 | 669.33 GWh |
| Idaho | # 41 | 145 | 1,901.37 GWh |
| Illinois | # 4 | 380 | 14,875.53 GWh |
| Indiana | # 12 | 216 | 9,790.54 GWh |
| Iowa | # 19 | 290 | 6,378.25 GWh |
| Kansas | # 29 | 183 | 4,702.54 GWh |
| Kentucky | # 22 | 60 | 6,056.73 GWh |
| Louisiana | # 17 | 86 | 7,844.56 GWh |
| Maine | # 45 | 215 | 1,304.77 GWh |
| Maryland | # 38 | 203 | 3,022.33 GWh |
| Massachusetts | # 43 | 638 | 1,703.92 GWh |
| Michigan | # 11 | 268 | 9,944.77 GWh |
| Minnesota | # 28 | 763 | 4,707.75 GWh |
| Mississippi | # 23 | 56 | 5,592.62 GWh |
| Missouri | # 24 | 127 | 5,447.62 GWh |
| State | Rank | Active Plants | Feb 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 70 | 2,424.51 GWh |
| Nebraska | # 35 | 124 | 3,248.85 GWh |
| Nevada | # 39 | 114 | 3,017.15 GWh |
| New Hampshire | # 44 | 56 | 1,533.32 GWh |
| New Jersey | # 27 | 386 | 5,076.17 GWh |
| New Mexico | # 37 | 143 | 3,060.89 GWh |
| New York | # 9 | 949 | 10,653.43 GWh |
| North Carolina | # 7 | 903 | 11,173.71 GWh |
| North Dakota | # 33 | 59 | 3,698.46 GWh |
| Ohio | # 6 | 200 | 13,061.62 GWh |
| Oklahoma | # 18 | 141 | 6,415.64 GWh |
| Oregon | # 21 | 270 | 6,135.97 GWh |
| Pennsylvania | # 2 | 251 | 20,963.61 GWh |
| Rhode Island | # 46 | 100 | 708.28 GWh |
| South Carolina | # 15 | 207 | 8,044.42 GWh |
| South Dakota | # 42 | 52 | 1,872.08 GWh |
| Tennessee | # 20 | 88 | 6,323.51 GWh |
| Texas | # 1 | 959 | 41,824.62 GWh |
| Utah | # 36 | 125 | 3,187.35 GWh |
| Vermont | # 50 | 116 | 163.02 GWh |
| Virginia | # 14 | 236 | 9,222.47 GWh |
| Washington | # 13 | 135 | 9,340.69 GWh |
| West Virginia | # 30 | 40 | 4,249.38 GWh |
| Wisconsin | # 26 | 239 | 5,119.83 GWh |
| Wyoming | # 34 | 70 | 3,369.17 GWh |