E C Gaston
31972 Highway 25 North, Wilsonville, AL 35186Plant Summary Information
E C Gaston is ranked #10 out of 76 power plants in Alabama in terms of total annual net electricity generation.
E C Gaston is comprised of 6 generators and generated 749.2 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | E C Gaston |
|---|---|
| Utility Name | Alabama Power Co |
| Location | Shelby County, AL |
| Initial Operation Date | May 1960 |
| Last Update | Mar 2026 |
| Annual Generation | 3.6 TWh |
| Annual Consumption | 40.8 M MMBtu |
| Ranked #329 out of 12,332 Power Plants Nationwide | |
| Ranked #334 out of 2,179 Natural Gas Power Plants Nationwide | |
| Ranked #10 out of 76 Alabama Power Plants | |
| Ranked #10 out of 36 Alabama Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 50.1% Bituminous Coal : 49.9% |
Map of E C Gaston
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for E C Gaston.
Monthly Net Generation for E C Gaston
Monthly Plant Fuel Consumption for E C Gaston
E C Gaston Details
| Summary Information | |
|---|---|
| Plant Name | E C Gaston (26) |
| Plant Address | 31972 Highway 25 North, Wilsonville, AL 35186 |
| Utility | Alabama Power Co (195) |
| Latitude, Longitude | 33.24421, -86.45806 |
| Generation Dates on File | Jan 2001 to Mar 2026 |
| Initial Operation Date | May 1960 |
| Annual Generation | 3.6 TWh |
| Fuel Types | Natural Gas : 50.1% Bituminous Coal : 49.9% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Southern Company Services, Inc. - Trans (SOCO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Coosa River |
| Ash Impoundment | Yes Not Lined Operating |
| Transmission / Distribution Owner | Alabama Power Co (195) AL |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name | TRANSCONTINENTAL GAS PIPELINE |
| Natural Gas Storage | No |
Generator 1 Details Operating May 1960
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Jointly Owned |
| Nameplate Capacity | 272 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 254 MW |
| Winter Capacity | 254 MW |
| Minimum Load | 70 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 1960 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Bituminous Coal |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | OVER |
| Pulverized Coal Technology | Yes |
| Subcritical Technology | Yes |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 2 Details Operating July 1960
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Jointly Owned |
| Nameplate Capacity | 272 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 256 MW |
| Winter Capacity | 256 MW |
| Minimum Load | 70 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 1960 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Bituminous Coal |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | OVER |
| Pulverized Coal Technology | Yes |
| Subcritical Technology | Yes |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator 3 Details Operating June 1961
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Jointly Owned |
| Nameplate Capacity | 272 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 254 MW |
| Winter Capacity | 254 MW |
| Minimum Load | 70 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1961 |
| Combined Heat & Power | No |
|---|---|
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Bituminous Coal |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | OVER |
| Pulverized Coal Technology | Yes |
| Subcritical Technology | Yes |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator ST4 Details Operating June 1962
| Technology | Natural Gas Steam Turbine |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Jointly Owned |
| Nameplate Capacity | 244.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 256 MW |
| Winter Capacity | 256 MW |
| Minimum Load | 70 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | June 1962 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Bituminous Coal |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | OVER |
| Pulverized Coal Technology | Yes |
| Subcritical Technology | Yes |
| Multiple Fuels | Yes |
Generator GT4 Details Operating June 1970
| Technology | Petroleum Liquids |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Jointly Owned |
| Nameplate Capacity | 21.2 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 16 MW |
| Winter Capacity | 20 MW |
| Minimum Load | 16 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 1970 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Distillate Fuel Oil |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator 5 Details Operating August 1974
| Technology | Conventional Steam Coal |
|---|---|
| Prime Mover | Steam Turbine |
| Ownership | Single Owner |
| Nameplate Capacity | 952 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 832 MW |
| Winter Capacity | 832 MW |
| Minimum Load | 700 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | August 1974 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Bituminous Coal / Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | OVER |
| Pulverized Coal Technology | Yes |
| Supercritical Technology | Yes |
| Multiple Fuels | Yes |
E C Gaston Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Alabama Power Co | 600 North 18th Street, Birmingham, AL 35291 | Generator 1 | 50.00% |
| Georgia Power Co | P O Box 4545, Atlanta, GA 30302 | Generator 1 | 50.00% |
| Alabama Power Co | 600 North 18th Street, Birmingham, AL 35291 | Generator 2 | 50.00% |
| Georgia Power Co | P O Box 4545, Atlanta, GA 30302 | Generator 2 | 50.00% |
| Alabama Power Co | 600 North 18th Street, Birmingham, AL 35291 | Generator 3 | 50.00% |
| Georgia Power Co | P O Box 4545, Atlanta, GA 30302 | Generator 3 | 50.00% |
| Alabama Power Co | 600 North 18th Street, Birmingham, AL 35291 | Generator GT4 | 50.00% |
| Georgia Power Co | P O Box 4545, Atlanta, GA 30302 | Generator GT4 | 50.00% |
| Alabama Power Co | 600 North 18th Street, Birmingham, AL 35291 | Generator ST4 | 50.00% |
| Georgia Power Co | P O Box 4545, Atlanta, GA 30302 | Generator ST4 | 50.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #324 | Louisiana 1 | Baton Rouge, LA | 2.6 TWh |
| #325 | Apache Station | Cochise, AZ | 2.1 TWh |
| #326 | Higgins Generating Station | Primm, NV | 1.9 TWh |
| #327 | Corpus Christi Energy Center | Corpus Christi, TX | 1.8 TWh |
| #328 | Northside Generating Station | Jacksonville, FL | 3.2 TWh |
| #329 | Dow St Charles Operations | Taft, LA | 1.9 TWh |
| #330 | Bowline Point | West Haverstraw, NY | 1.9 TWh |
| #331 | Manchester Street | Providence, RI | 2.0 TWh |
| #332 | Noblesville | Noblesville, IN | 1.8 TWh |
| #333 | Watson Cogeneration | Carson, CA | 2.3 TWh |
| #335 | Apex Generating Station | Las Vegas, NV | 1.8 TWh |
| #336 | Cunningham | Hobbs, NM | 1.8 TWh |
| #337 | Hopewell Cogeneration | Hopewell, VA | 1.8 TWh |
| #338 | Cedar Bayou | Baytown, TX | 1.8 TWh |
| #339 | Rockingham County CT Station | Reidsville, NC | 1.8 TWh |
| #340 | AES Huntington Beach Energy Project | Huntington Beach, CA | 1.8 TWh |
| #341 | Newington Energy Center | Newington, NH | 1.9 TWh |
| #342 | Arthur Kill Generating Station | Staten Island, NY | 1.8 TWh |
| #343 | Russell City Energy Center | Hayward, CA | 1.8 TWh |
| #344 | Houston Chemical Complex Battleground | Houston, TX | 1.8 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding E C Gaston.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ABC Coke | Tarrant, AL | 9.0 MWh | 29.9 mi |
| AMEA Peaking | Sylacauga, AL | 35.2 GWh | 11.5 mi |
| ANAD Solar Array | Anniston Army Depot, AL | 12.9 GWh | 38.6 mi |
| Bankhead Dam | Northport, AL | 107.8 GWh | 53.9 mi |
| Calhoun Energy Center | Eastaboga, AL | 91.0 GWh | 36.7 mi |
| Central Alabama Generating Station | Billingsley, AL | 5.1 TWh | 44.2 mi |
| H Neely Henry Dam | Ohatchee, AL | 179.9 GWh | 44 mi |
| Harris Dam | Lineville, AL | 115.6 GWh | 48.7 mi |
| Hillabee Energy Center | Alexander City, AL | 2.9 TWh | 36.2 mi |
| International Paper Prattville Mill | Prattville, AL | 555.3 GWh | 57 mi |
| James H Miller Jr | Quinton, AL | 19.5 TWh | 43.8 mi |
| Jordan Dam | Wetumpka, AL | 270.7 GWh | 44.8 mi |
| Lay Dam | Clanton, AL | 454.4 GWh | 19.7 mi |
| Logan Martin Dam | Vincent, AL | 297.3 GWh | 14.4 mi |
| Martin Dam | Dadeville, AL | 305.9 GWh | 50.2 mi |
| Mitchell Dam | Verbena, AL | 355.5 GWh | 30.3 mi |
| Tenaska Lindsay Hill Generating Station | Billingsley, AL | 1.4 TWh | 44.1 mi |
| U S Alliance Coosa Pines | Coosa Pines, AL | 141.9 GWh | 8.2 mi |
| Walter Bouldin Dam | Wetumpka, AL | 450.3 GWh | 46.7 mi |
| Yates Dam | Tallassee, AL | 96.5 GWh | 56.8 mi |