Bullfrog Creek Solar
3520 County Road 579, Wimauma, FL 33598Plant Summary Information
Bullfrog Creek Solar is ranked #157 out of 203 solar farms in Florida in terms of total annual net electricity generation.
Bullfrog Creek Solar generated 38.0 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Bullfrog Creek Solar |
---|---|
Utility Name | Tampa Electric Co |
Location | Hillsborough County, FL |
Initial Operation Date | December 2024 |
Last Update | Mar 2025 |
Annual Generation | 38.0 GWh |
Annual Consumption | 129.5 k MMBtu |
Ranked #4,331 out of 12,288 Power Plants Nationwide | |
Ranked #1,036 out of 6,174 Solar Power Plants Nationwide | |
Ranked #241 out of 308 Florida Power Plants | |
Ranked #157 out of 203 Florida Solar Power Plants | |
Fuel Types | Solar |
Map of Bullfrog Creek Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bullfrog Creek Solar.
Monthly Net Generation for Bullfrog Creek Solar
Bullfrog Creek Solar Details
Summary Information | |
---|---|
Plant Name | Bullfrog Creek Solar (67203) |
Plant Address | 3520 County Road 579, Wimauma, FL 33598 |
Utility | Tampa Electric Co (18454) |
Latitude, Longitude | 27.66058, -82.29563 |
Generation Dates on File | Jan 2025 to Mar 2025 |
Initial Operation Date | December 2024 |
Annual Generation | 38.0 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | SERC |
Balancing Authority | Tampa Electric Company (TEC) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Tampa Electric Co (18454) FL |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 74.5 MW |
Summer Capacity | 74.5 MW |
Winter Capacity | 74.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2024 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 88 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Bullfrog Creek Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#1026 | Elk Hill Solar 1 | Mercersburg, PA | 38.4 GWh |
#1027 | Solidago Solar | Windsor, VA | 38.3 GWh |
#1028 | Calipatria Solar Farm | Calipatria, CA | 38.3 GWh |
#1029 | Cork Oak Solar | Halifax, NC | 38.3 GWh |
#1030 | Whitetail Solar 2 | St. Thomas, PA | 38.2 GWh |
#1031 | Solar Blythe 2 | Blythe, CA | 38.1 GWh |
#1032 | Holopaw | TBD, FL | 38.1 GWh |
#1033 | AES Lawai Solar Hybrid | Lawai, HI | 37.9 GWh |
#1034 | Cottontail Solar 2 | West Manchester Towns, PA | 38.0 GWh |
#1035 | Pullman Solar, LLC | Lee Township, MI | 38.0 GWh |
#1037 | Gloucester Solar | Gloucester, VA | 37.9 GWh |
#1038 | EDF Ph1 Toms River | Tom's River, NJ | 37.9 GWh |
#1039 | DD Fayetteville Solar NC LLC | Fayetteville, NC | 37.9 GWh |
#1040 | Stillwater Facility | Fallon, NV | 128.3 GWh |
#1041 | St. Joseph Solar | Granger, IN | 37.8 GWh |
#1042 | Westlands Solar PV Farm | Huron, CA | 37.8 GWh |
#1043 | Hyder Solar Hybrid | Hyder, AZ | 35.3 GWh |
#1044 | Golden Triangle | Lowndes, MS | 36.8 GWh |
#1045 | Kettleman Solar -Centaurus | Kettleman City, CA | 37.7 GWh |
#1046 | Rochambeau Solar | Williamsburg, VA | 37.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bullfrog Creek Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alafia Solar | Mulberry, FL | 117.8 GWh | 17.1 mi |
Balm Solar | Wimauma, FL | 127.4 GWh | 8 mi |
Big Bend | Apollo Beach, FL | 6.9 TWh | 11.4 mi |
Big Bend Agrivoltaics | Apollo Beach, FL | 749.0 MWh | 10.6 mi |
Big Bend Floating Solar I | Gibsonton, FL | 1.3 GWh | 10.7 mi |
Big Bend II Solar | Apollo Beach, FL | 78.6 GWh | 10.2 mi |
Duette Solar Power Plant | Parrish, FL | 163.0 GWh | 15.2 mi |
Elder Branch | Parrish, FL | 165.9 GWh | 5.1 mi |
Grange Hall Solar | Wimauma, FL | 106.3 GWh | 8.1 mi |
H L Culbreath Bayside Power Station | Tampa, FL | 5.2 TWh | 18.7 mi |
Lake Hancock Solar | Bartow, FL | 91.8 GWh | 16.5 mi |
Lithia Solar | Lithia, FL | 130.6 GWh | 10.3 mi |
Little Manatee River Solar | Ruskin, FL | 120.7 GWh | 7.3 mi |
Manatee | Parrish, FL | 6.4 TWh | 4.9 mi |
Manatee Solar Energy Center | Parrish, FL | 102.1 GWh | 5.2 mi |
Mosaic Co Tampa Facility | Riverview, FL | 110.0 GWh | 15 mi |
Riverside Solar | Ruskin, FL | 102.2 GWh | 10.9 mi |
Southfork Solar | Parrish, FL | 148.6 GWh | 8.8 mi |
Three Creeks | Parrish, FL | 186.0 GWh | 6 mi |
Wimauma Solar and Battery Storage | Wimauma, FL | 107.9 GWh | 5.2 mi |