Bullfrog Creek Solar
7628 Renewable Dr, Wimauma, FL 33598Plant Summary Information
Bullfrog Creek Solar is ranked #68 out of 225 solar farms in Florida in terms of total annual net electricity generation.
Bullfrog Creek Solar generated 50.4 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Bullfrog Creek Solar |
|---|---|
| Utility Name | Tampa Electric Co |
| Location | Hillsborough County, FL |
| Initial Operation Date | December 2024 |
| Last Update | May 2026 |
| Annual Generation | 161.2 GWh |
| Annual Consumption | 611.3 k MMBtu |
| Ranked #2,854 out of 13,081 Power Plants Nationwide | |
| Ranked #621 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #135 out of 332 Florida Power Plants | |
| Ranked #68 out of 225 Florida Solar Power Plants | |
| Fuel Types | Solar |
Map of Bullfrog Creek Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bullfrog Creek Solar.
Monthly Net Generation for Bullfrog Creek Solar
Monthly Plant Fuel Consumption for Bullfrog Creek Solar
Bullfrog Creek Solar Details
| Summary Information | |
|---|---|
| Plant Name | Bullfrog Creek Solar (67203) |
| Plant Address | 7628 Renewable Dr, Wimauma, FL 33598 |
| Utility | Tampa Electric Co (18454) |
| Latitude, Longitude | 27.66058, -82.29563 |
| Generation Dates on File | Jan 2025 to May 2026 |
| Initial Operation Date | December 2024 |
| Annual Generation | 161.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | Tampa Electric Company (TEC) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Tampa Electric Co (18454) FL |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator 1 Details Operating December 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 74.5 MW |
| Summer Capacity | 74.5 MW |
| Winter Capacity | 74.5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2024 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 88 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Bullfrog Creek Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #611 | Orchard | Ft. Pierce, FL | 162.9 GWh |
| #612 | Cavalier Solar A2 | Smithfield, VA | 162.6 GWh |
| #613 | Foxhound | Clover, VA | 162.6 GWh |
| #614 | Sundance Renewable Energy Center | Lee, FL | 162.4 GWh |
| #615 | High Springs Solar Power Plant | High Springs, FL | 162.4 GWh |
| #616 | Eastern Shore Solar, LLC | Oak Hall, VA | 161.9 GWh |
| #617 | Cove Mountain Solar | Beryl, UT | 161.8 GWh |
| #618 | Big Juniper Solar | TBD, FL | 161.5 GWh |
| #619 | Altavista Solar | Lynch Station, VA | 161.3 GWh |
| #620 | Redlands | TBD, FL | 161.3 GWh |
| #622 | Cabin Creek Solar, LLC | Biscoe, NC | 161.0 GWh |
| #623 | Nestlewood Solar | Hamersville, OH | 160.9 GWh |
| #624 | White Tail | TBD, FL | 160.5 GWh |
| #625 | Estrella Solar & Storage | Lancaster, CA | 156.4 GWh |
| #626 | Lily Solar | Martin, SC | 160.2 GWh |
| #627 | Bulldog Solar LLC | Warrenton, GA | 160.0 GWh |
| #628 | Misenheimer Solar LLC | Gold Hill, NC | 160.0 GWh |
| #629 | Garnet Mesa Solar | Delta, CO | 159.5 GWh |
| #630 | OCI Alamo 5 LLC | Uvalde, TX | 159.1 GWh |
| #631 | Terrill Creek | Green Cove Springs, FL | 159.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bullfrog Creek Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Balm Solar | Wimauma, FL | 135.0 GWh | 8 mi |
| Big Bend | Apollo Beach, FL | 6.6 TWh | 11.4 mi |
| Big Bend 1 Solar and Battery Storage | Apollo Beach, FL | 18.1 GWh | 10.2 mi |
| Big Bend Agrivoltaics | Apollo Beach, FL | 172.0 MWh | 10.6 mi |
| Big Bend Floating Solar I | Gibsonton, FL | 1.2 GWh | 10.7 mi |
| Big Bend II Solar | Apollo Beach, FL | 89.6 GWh | 10.2 mi |
| Cottonmouth Ranch Solar | Wimauma, FL | 81.2 GWh | 0.5 mi |
| Duette Solar Power Plant | Parrish, FL | 168.0 GWh | 15.2 mi |
| Elder Branch | Parrish, FL | 165.7 GWh | 5.1 mi |
| Grange Hall Solar | Wimauma, FL | 120.3 GWh | 8.1 mi |
| Lithia Solar | Lithia, FL | 141.1 GWh | 10.3 mi |
| Little Manatee River Solar | Ruskin, FL | 105.3 GWh | 7.3 mi |
| Long Branch Solar | Parrish, FL | 46.2 GWh | 8 mi |
| Manatee | Parrish, FL | 7.2 TWh | 4.9 mi |
| Manatee Solar Energy Center | Parrish, FL | 93.0 GWh | 5.2 mi |
| Mosaic Co Tampa Facility | Riverview, FL | 69.1 GWh | 15 mi |
| Riverside Solar | Ruskin, FL | 114.2 GWh | 10.9 mi |
| Southfork Solar | Parrish, FL | 167.9 GWh | 8.8 mi |
| Three Creeks | Parrish, FL | 190.4 GWh | 6 mi |
| Wimauma Solar and Battery Storage | Wimauma, FL | 129.7 GWh | 5.2 mi |