J K Smith
12145 Irvine Road, Winchester, KY 40391Plant Summary Information
J K Smith is ranked #13 out of 61 power plants in Kentucky in terms of total annual net electricity generation.
J K Smith is comprised of 9 generators and generated 169.0 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | J K Smith |
|---|---|
| Utility Name | East Kentucky Power Coop, Inc |
| Location | Clark County, KY |
| Initial Operation Date | January 1999 |
| Last Update | May 2026 |
| Annual Generation | 1.0 TWh |
| Annual Consumption | 12.9 M MMBtu |
| Ranked #735 out of 13,081 Power Plants Nationwide | |
| Ranked #433 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #13 out of 61 Kentucky Power Plants | |
| Ranked #5 out of 16 Kentucky Natural Gas Power Plants | |
| Fuel Types | Natural Gas : 99.7% |
Map of J K Smith
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for J K Smith.
Monthly Net Generation for J K Smith
Monthly Plant Fuel Consumption for J K Smith
J K Smith Details
| Summary Information | |
|---|---|
| Plant Name | J K Smith (54) |
| Plant Address | 12145 Irvine Road, Winchester, KY 40391 |
| Utility | East Kentucky Power Coop, Inc (5580) |
| Latitude, Longitude | 37.8833, -84.1017 |
| Generation Dates on File | Jan 2001 to May 2026 |
| Initial Operation Date | January 1999 |
| Annual Generation | 1.0 TWh |
| Fuel Types | Natural Gas : 99.7% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | Kentucky River |
| Ash Impoundment | No |
| Transmission / Distribution Owner | East Kentucky Power Coop, Inc (5580) |
| Grid Voltage | 138.00 kV / 345.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Pipeline Name |
TENNESSEE GAS PIPELINE COMPANY TEXAS EASTERN TRANSMISSION LP |
| Natural Gas Storage | No |
Generator GT2 Details Operating January 1999
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1123180712 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 88122102 |
| Nameplate Capacity | 119 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 105 MW |
| Winter Capacity | 135 MW |
| Minimum Load | 70 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 1999 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 104 MW |
| Net Winter Capacity With Natural Gas | 142 MW |
| Net Summer Capacity With Oil | 104 MW |
| Net Winter Capacity With Oil | 142 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator GT1 Details Operating March 1999
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1123180710 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 88122101 |
| Nameplate Capacity | 119 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 110 MW |
| Winter Capacity | 135 MW |
| Minimum Load | 70 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 1999 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 104 MW |
| Net Winter Capacity With Natural Gas | 142 MW |
| Net Summer Capacity With Oil | 104 MW |
| Net Winter Capacity With Oil | 142 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator GT3 Details Operating April 1999
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1123180713 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 88122103 |
| Nameplate Capacity | 119 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 106 MW |
| Winter Capacity | 135 MW |
| Minimum Load | 70 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 1999 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 104 MW |
| Net Winter Capacity With Natural Gas | 142 MW |
| Net Summer Capacity With Oil | 104 MW |
| Net Winter Capacity With Oil | 142 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator GT4 Details Operating November 2001
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1123180714 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 88122104 |
| Nameplate Capacity | 87.6 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 74 MW |
| Winter Capacity | 93 MW |
| Minimum Load | 54 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2001 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 71 MW |
| Net Winter Capacity With Natural Gas | 88 MW |
| Net Summer Capacity With Oil | 71 MW |
| Net Winter Capacity With Oil | 88 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator GT5 Details Operating November 2001
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1123180715 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 88122105 |
| Nameplate Capacity | 87.6 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 70.6 MW |
| Winter Capacity | 88 MW |
| Minimum Load | 54 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2001 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 70.6 MW |
| Net Winter Capacity With Natural Gas | 88 MW |
| Net Summer Capacity With Oil | 70.6 MW |
| Net Winter Capacity With Oil | 88 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator GT6 Details Operating January 2005
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1123180716 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 88122106 |
| Nameplate Capacity | 94.9 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 69 MW |
| Winter Capacity | 88 MW |
| Minimum Load | 54 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2005 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 74 MW |
| Net Winter Capacity With Natural Gas | 88 MW |
| Net Summer Capacity With Oil | 74 MW |
| Net Winter Capacity With Oil | 88 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator GT7 Details Operating January 2005
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1123180717 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 88122107 |
| Nameplate Capacity | 94.9 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 69 MW |
| Winter Capacity | 88 MW |
| Minimum Load | 54 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2005 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas / Distillate Fuel Oil |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | Yes |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | Yes |
| Multifuel Details | |
| Switch When Operating | Yes |
|---|---|
| Net Summer Capacity With Natural Gas | 74 MW |
| Net Winter Capacity With Natural Gas | 88 MW |
| Net Summer Capacity With Oil | 74 MW |
| Net Winter Capacity With Oil | 88 MW |
| Time To Switch From Gas To Oil | 1H |
| Time To Switch From Oil To Gas | 1H |
| Factors That Limit Switching | Yes |
| Storage Limits | Yes |
| Air Permit Limits | Yes |
Generator GT10 Details Operating May 2010
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1123180711 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 8122110 |
| Nameplate Capacity | 108.2 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 76 MW |
| Winter Capacity | 100 MW |
| Minimum Load | 33 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator GT9 Details Operating May 2010
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | 1123180718 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | 88122109 |
| Nameplate Capacity | 108.2 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 76 MW |
| Winter Capacity | 100 MW |
| Minimum Load | 33 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2010 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
J K Smith Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #423 | Cordova Energy | Cordova, IL | 1.1 TWh |
| #424 | Grays Ferry Cogeneration | Philadelphia, PA | 1.1 TWh |
| #425 | Hog Bayou Energy Center | Mobile, AL | 1.1 TWh |
| #426 | E F Barrett | Island Park, NY | 1.1 TWh |
| #427 | Cope | Cope, SC | 1.6 TWh |
| #428 | Southcentral Power Project | Anchorage, AK | 1.1 TWh |
| #429 | Michigan Power LP | Ludington, MI | 1.1 TWh |
| #430 | Chevron Oil | Pascagoula, MS | 1.1 TWh |
| #431 | Madison | Trenton, OH | 1.0 TWh |
| #432 | Sim Gideon | Bastrop, TX | 1.0 TWh |
| #434 | Ocean State Power | Harrisville, RI | 1.0 TWh |
| #435 | Bennett Mountain | Mountain Home, ID | 999.1 GWh |
| #436 | Belle River | China Twp, MI | 4.7 TWh |
| #437 | Millennium Power | Charlton, MA | 995.2 GWh |
| #438 | Hardee Power Station | Bowling Green, FL | 984.0 GWh |
| #439 | Cleveland Cnty Generating Facility | Kings Mountain, NC | 985.8 GWh |
| #440 | Holland Energy Park | Holland, MI | 973.5 GWh |
| #441 | Little Gypsy | La Place, LA | 964.3 GWh |
| #442 | Shell Deer Park | Deer Park, TX | 1.1 TWh |
| #443 | Tait Electric Generating Station | Moraine, OH | 957.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding J K Smith.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Blue Ridge Generating | Irvine, KY | 4.3 GWh | 11.6 mi |
| Bluebird Solar LLC | Cynthiana, KY | 142.3 GWh | 32.6 mi |
| Brown County LFGTE Power Station | Georgetown, OH | 26.4 GWh | 70.7 mi |
| Cooper | Somerset, KY | 619.6 GWh | 66.8 mi |
| Cooperative Solar One | Winchester, KY | 13.1 GWh | 13 mi |
| Crittenden Solar Facility | Dry Ridge, KY | 3.5 GWh | 66.1 mi |
| Dix Dam | Harrodsburg, KY | 104.7 GWh | 33.5 mi |
| E W Brown | Harrodsburg, KY | 1.8 TWh | 34 mi |
| Green City Recovery, LLC | Georgetown, KY | 1.2 GWh | 40.1 mi |
| H L Spurlock | Maysville, KY | 8.8 TWh | 58.5 mi |
| Haefling | Lexington, KY | 76.0 MWh | 26.5 mi |
| Laurel Dam | London, KY | 88.8 GWh | 64.4 mi |
| Matilda Hamilton Fee Hydroelectric Stati | Ravenna, KY | 8.0 GWh | 16.5 mi |
| Meldahl Hydroelectric Project | Foster, KY | 470.5 GWh | 62.9 mi |
| Morehead Generating Facility | Morehead, KY | 6.8 GWh | 37.1 mi |
| Mother Ann Lee | Harrodsburg, KY | 6.4 GWh | 34.2 mi |
| Paris (KY) | Paris, KY | 370.4 MWh | 23.4 mi |
| Pendleton County LFGTE | Butler, KY | 24.0 GWh | 61.1 mi |
| SR Turkey Creek, LLC | Lancaster, KY | 107.0 GWh | 32.4 mi |
| Walton 1 Solar Facility | Walton, KY | 2.7 GWh | 71.9 mi |