Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| DCO Burlington | Cartier Energy, LLC | Burlington, NJ | PJM Interconnection, LLC (PJM) | 16.8 GWh | May 2012 | Dec 2024 | Natural Gas |
| Bordentown Solar | MN8 Energy LLC | Burlington, NJ | PJM Interconnection, LLC (PJM) | 8.7 GWh | Nov 2015 | Aug 2026 | Solar |
| BJ's Wholesale Club Inc Dist Center | Tesla Inc. | Burlington, NJ | PJM Interconnection, LLC (PJM) | 1.8 GWh | Sep 2016 | Dec 2025 | Solar |
| Mill Creek Solar | Public Service Elec & Gas Co | Burlington, NJ | PJM Interconnection, LLC (PJM) | 4.9 GWh | Nov 2011 | Dec 2025 | Solar |
| Burlington Generating Station | Parkway Generation Operating, LLC | Burlington, NJ | PJM Interconnection, LLC (PJM) | 53.0 GWh | May 1967 | Dec 2025 | Natural Gas : 98.8% Kerosene : 1.2% |
| Milo Solar | Milo Solar LLC | Burlington, NC | Duke Energy Carolinas (DUK) | 4.9 GWh | Mar 2016 | Dec 2025 | Solar |
| Elliana Solar | Cypress Creek Renewables | Burlington, NC | Duke Energy Carolinas (DUK) | 7.5 GWh | Sep 2015 | Dec 2025 | Solar |
| Norther Tier Landfill | NextEra Renewable Fuels, LLC | Burlington, PA | PJM Interconnection, LLC (PJM) | 8.5 GWh | Dec 2008 | Dec 2025 | Landfill Gas |
| Orion I Solar Project | Ben Milam Solar 1 LLC | Burlington, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 445.3 GWh | Jul 2024 | Aug 2026 | Solar |
| J C McNeil | City of Burlington Electric - (VT) | Burlington, VT | ISO New England (ISNE) | 188.4 GWh | May 1984 | Aug 2026 | Wood/Wood Waste Solids : 99.7% |
| Burlington GT | City of Burlington Electric - (VT) | Burlington, VT | ISO New England (ISNE) | 684.0 MWh | Aug 1971 | Dec 2025 | Distillate Fuel Oil |
| Spring Prairie Solar WI, LLC | Wisconsin Electric Power Co | Burlington, WI | Midcontinent Independent System Operator, Inc. (MISO) | 12.8 GWh | Nov 2023 | Dec 2025 | Solar |
| Hat Creek Bioenergy | Hat Creek Bioenergy, LLC | Burney, CA | California Independent System Operator (CISO) | 12.0 GWh | May 2025 | Dec 2025 | Wood/Wood Waste Solids |
| Hatchet Ridge Wind Project | Pattern Operators LP | Burney, CA | California Independent System Operator (CISO) | 271.3 GWh | Nov 2010 | Dec 2025 | Wind |
| Pit 3 | Pacific Gas & Electric Co. | Burney, CA | California Independent System Operator (CISO) | 374.6 GWh | Jun 1925 | Dec 2025 | Water |
| Pit 1 | Pacific Gas & Electric Co. | Burney, CA | California Independent System Operator (CISO) | 255.5 GWh | Aug 1922 | Dec 2025 | Water |
| Hat Creek 2 | Pacific Gas & Electric Co. | Burney, CA | California Independent System Operator (CISO) | 46.0 GWh | Aug 1921 | Dec 2025 | Water |
| Hat Creek 1 | Pacific Gas & Electric Co. | Burney, CA | California Independent System Operator (CISO) | 32.4 GWh | Jul 1921 | Dec 2025 | Water |
| Burney Forest Products | Burney Forest Products, A Joint Venture | Burney, CA | California Independent System Operator (CISO) | 102.9 GWh | Sep 1989 | Dec 2025 | Wood/Wood Waste Solids : 69.9% Natural Gas : 30.1% |
| Lost Creek I | Snow Mountain Hydro LLC | Burney, CA | California Independent System Operator (CISO) | 5.9 GWh | Nov 1989 | Dec 2025 | Water |
| Burney Creek | Snow Mountain Hydro LLC | Burney, CA | California Independent System Operator (CISO) | 8.6 GWh | Feb 1990 | Dec 2025 | Water |
| Sierra Pacific Burney Facility | Sierra Pacific Industries | Burney, CA | California Independent System Operator (CISO) | 95.1 GWh | Sep 1986 | Dec 2025 | Wood/Wood Waste Solids |
| Cove Hydroelectric | Snow Mountain Hydro LLC | Burney, CA | California Independent System Operator (CISO) | 17.4 GWh | Jan 1990 | Dec 2025 | Water |
| Pittsfield Hydro | KEI (Maine) Power Management (II) LLC | Burnham, ME | ISO New England (ISNE) | 2.7 GWh | Jun 1986 | Dec 2025 | Water |
| ArcelorMittal Burns Harbor | Cleveland-Cliffs Burns Harbor LLC | Burns Harbor, IN | Midcontinent Independent System Operator, Inc. (MISO) | 719.4 GWh | Dec 1968 | Dec 2025 | Blast Furnace Gas : 37.1% Natural Gas : 32.1% Other Gas : 30.8% |
| DeGraff Butler Electric | Today's Power, Inc. | Burns, KS | Southwest Power Pool (SWPP) | 2.1 GWh | Apr 2021 | Dec 2025 | Solar |
| Bright Field Solar LLC(CSG) | Nautilus Solar Solutions | Burns, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 2021 | Dec 2025 | Solar |
| Black Dog | Northern States Power Co - Minnesota | Burnsville, MN | Midcontinent Independent System Operator, Inc. (MISO) | 870.0 GWh | Sep 1954 | Dec 2025 | Natural Gas |
| Douglas Pike Solar, LLC | Navisun LLC | Burrillville, RI | ISO New England (ISNE) | 3.3 GWh | May 2023 | Dec 2025 | Solar |
| Kearsarge Smithfield LLC | Kearsarge Smithfield LLC | Burrillville, RI | ISO New England (ISNE) | 14.0 GWh | Mar 2023 | Dec 2025 | Solar |
| Nautilus Goat Island Solar LLC (CSG) | Nautilus Solar Solutions | Burrillville, RI | ISO New England (ISNE) | 4.0 GWh | Jul 2019 | Dec 2025 | Solar |
| Town of Burrillville Solar CSG | Standard Solar | Burrillville, RI | ISO New England (ISNE) | 6.6 GWh | Sep 2020 | Dec 2025 | Solar |
| Burwell | City of Burwell - (NE) | Burwell, NE | Southwest Power Pool (SWPP) | 147.0 MWh | Feb 1955 | Dec 2025 | Distillate Fuel Oil |
| Bushnell | City of Bushnell - (IL) | Bushnell, IL | Midcontinent Independent System Operator, Inc. (MISO) | 78.0 MWh | May 1940 | Dec 2025 | Distillate Fuel Oil |
| White Pine Solar, LLC | White Pine Solar, LLC | Butler, GA | Southern Company Services, Inc. - Trans (SOCO) | 187.9 GWh | Jun 2016 | Dec 2025 | Solar |
| Butler Solar Farm 20 | Southern Power Co | Butler, GA | Southern Company Services, Inc. - Trans (SOCO) | 41.6 GWh | Jan 2016 | Dec 2025 | Solar |
| Pawpaw Solar Plant | Southern Power Co | Butler, GA | Southern Company Services, Inc. - Trans (SOCO) | 62.5 GWh | Feb 2016 | Dec 2025 | Solar |
| Butler Solar Project 103 | Southern Power Co | Butler, GA | Southern Company Services, Inc. - Trans (SOCO) | 224.4 GWh | Nov 2016 | Aug 2026 | Solar |
| Taylor County Solar | Southern Power Co | Butler, GA | Southern Company Services, Inc. - Trans (SOCO) | 257.2 GWh | Oct 2016 | Dec 2025 | Solar |
| Pendleton County LFGTE | East Kentucky Power Coop, Inc | Butler, KY | PJM Interconnection, LLC (PJM) | 24.0 GWh | Jan 2007 | Dec 2025 | Landfill Gas |
| Butler Municipal Power Plant | City of Butler - (MO) | Butler, MO | Southwest Power Pool (SWPP) | 39.0 MWh | May 1946 | Dec 2025 | Distillate Fuel Oil |
| Butler Solar Power Project | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | Butler, MO | Southwest Power Pool (SWPP) | 4.2 GWh | Feb 2014 | Aug 2026 | Solar |
| Basin Creek Plant | Basin Creek Power Services LLC | Butte, MT | NorthWestern Corporation (NWMT) | 111.1 GWh | May 2006 | Aug 2026 | Natural Gas |
| ABEC #2 dba West-Star Dairy | ABEC #2 LLC | Buttonwillow, CA | California Independent System Operator (CISO) | 8.1 GWh | Jan 2018 | Dec 2025 | Other Biomass Gas |
| West Buxton | Brookfield White Pine Hydro LLC | Buxton, ME | ISO New England (ISNE) | 20.6 GWh | Dec 1903 | Dec 2025 | Water |
| Buxton | North Carolina El Member Corp | Buxton, NC | PJM Interconnection, LLC (PJM) | 313.0 MWh | Mar 1991 | Dec 2025 | Distillate Fuel Oil |
| Guernsey Power Station | Guernsey Power Station LLC | Byesville, OH | PJM Interconnection, LLC (PJM) | 12.3 TWh | Jan 2023 | Aug 2026 | Natural Gas |
| Sr Byhalia, LLC | SR Byhalia, LLC | Byhalia, MS | Tennessee Valley Authority (TVA) | 9.9 GWh | Nov 2023 | Dec 2025 | Solar |
| Bryon Center | Energy Developments, Inc d/b/a EDL | Byron Center, MI | Midcontinent Independent System Operator, Inc. (MISO) | 30.8 GWh | Feb 2009 | Dec 2025 | Landfill Gas |
| Mariposa Energy Project | Diamond Generating Corporation | Byron, CA | California Independent System Operator (CISO) | 38.9 GWh | Sep 2012 | Aug 2026 | Natural Gas |
| Buena Vista Energy LLC | Leeward Asset Management, LLC | Byron, CA | California Independent System Operator (CISO) | 96.1 GWh | Nov 2006 | Dec 2025 | Wind |
| Byron Highway Solar | RPCA Solar 3, LLC | Byron, CA | California Independent System Operator (CISO) | 12.0 GWh | Oct 2022 | Dec 2025 | Solar |
| Byron Generating Station | Constellation Nuclear | Byron, IL | PJM Interconnection, LLC (PJM) | 19.7 TWh | Aug 1985 | Aug 2026 | Nuclear |
| Bear Grove Solar | Bear Grove Solar, LLC | Byron, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Jan 2023 | Dec 2025 | Solar |
| Lange Solar | Arcadia Solar, LLC | Byron, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Aug 2019 | Dec 2025 | Solar |
| Tweite Community Solar LLC | Tweite Community Solar LLC | Byron, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Oct 2020 | Dec 2025 | Solar |
| Novel DeCook Solar CSG | REA Investments, LLC | Byron, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Feb 2020 | Dec 2025 | Solar |
| Novel Byron Solar CSG | REA Investments, LLC | Byron, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Apr 2020 | Dec 2025 | Solar |
| Novel Bartel Solar CSG | REA Investments, LLC | Byron, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Mar 2020 | Dec 2025 | Solar |
| Hwy 14 Holdco Solar CSG | Hwy 14 Holdco, LLC | Byron, MN | Midcontinent Independent System Operator, Inc. (MISO) | 6.7 GWh | Jun 2017 | Dec 2025 | Solar |
| Foundation RRM | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 9.7 GWh | Nov 2012 | Dec 2025 | Wind |
| Foundation NWNA | Foundation CA Fund V Manager, LLC | Cabazon, CA | California Independent System Operator (CISO) | 22.5 GWh | Nov 2012 | Dec 2025 | Wind |
| Cabazon Wind Partners | Shell Wind Energy Inc. | Cabazon, CA | California Independent System Operator (CISO) | 107.7 GWh | Sep 2002 | Dec 2025 | Wind |
| Kelly Creek Wind Project | EDF Renewable Asset Holdings, Inc. | Cabery, IL | PJM Interconnection, LLC (PJM) | 629.1 GWh | Nov 2016 | Aug 2026 | Wind |
| Cadillac Renewable Energy | Cadillac Renewable Energy LLC | Cadillac, MI | Midcontinent Independent System Operator, Inc. (MISO) | 169.5 GWh | Jul 1993 | Dec 2025 | Wood/Wood Waste Solids |
| Dolores Canyon Solar | Tri-State G & T Assn, Inc | Cahone, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 210.7 GWh | Oct 2025 | Aug 2026 | Solar |
| Cairo Solar Farm, LLC | Southeastern Solar Farm Fund, LLC | Cairo, GA | Southern Company Services, Inc. - Trans (SOCO) | 3.3 GWh | May 2017 | Dec 2025 | Solar |
| Greene County Meter #1 | Tesla Inc. | Cairo, NY | ISO New England (ISNE) | 2.0 GWh | Jan 2018 | Dec 2025 | Solar |
| Las Virgenes Municipal Water District | Tesla Inc. | Calabasas, CA | California Independent System Operator (CISO) | 1.4 GWh | Jan 2014 | Dec 2025 | Solar |
| Las Virgenes | Greenbacker Renewable Energy Corporation | Calabasas, CA | Los Angeles Department of Water and Power (LDWP) | 7.2 GWh | Nov 2020 | Dec 2025 | Solar |
| Poplar Grove Solar 2, LLC | SRC Partnership 12, LLC | Caledonia, IL | PJM Interconnection, LLC (PJM) | 4.6 GWh | Nov 2023 | Dec 2025 | Solar |
| Poplar Grove Solar, LLC | SRC Partnership 12, LLC | Caledonia, IL | PJM Interconnection, LLC (PJM) | 4.5 GWh | Nov 2023 | Dec 2025 | Solar |
| NY- CSG- Livingston 4 | NY- CSG- Livingston 4 | Caledonia, NY | New York Independent System Operator (NYIS) | 2.0 GWh | Jan 2020 | Dec 2025 | Solar |
| Caledonia CSG LLC | Dimension Energy LLC | Caledonia, NY | New York Independent System Operator (NYIS) | 5.6 GWh | Nov 2024 | Dec 2025 | Solar |
| Caledonia Solar WI, LLC | Wisconsin Electric Power Co | Caledonia, WI | Midcontinent Independent System Operator, Inc. (MISO) | 9.0 GWh | Mar 2025 | Dec 2025 | Solar |
| Choctaw Nation Solar Farm | Oklahoma Gas & Electric Co | Calera, OK | Southwest Power Pool (SWPP) | 9.0 GWh | Jun 2020 | Dec 2025 | Solar |
| Mount Signal Solar Farm II | MN8 Energy LLC | Calexico, CA | California Independent System Operator (CISO) | 355.0 GWh | Dec 2019 | Aug 2026 | Solar |
| Mount Signal Solar Farm V | Imperial Valley Solar 3, LLC | Calexico, CA | California Independent System Operator (CISO) | 631.7 GWh | Oct 2018 | Aug 2026 | Solar |
| Wistaria Ranch Solar | RWE Clean Energy | Calexico, CA | California Independent System Operator (CISO) | 268.4 GWh | Nov 2018 | Aug 2026 | Solar |
| Centinela Solar Energy | Centinela Solar Energy LLC | Calexico, CA | California Independent System Operator (CISO) | 448.6 GWh | Jun 2013 | Dec 2025 | Solar |
| Drew Solar LLC | Drew Solar LLC | Calexico, CA | California Independent System Operator (CISO) | 304.4 GWh | Oct 2022 | Aug 2026 | Solar |
| Drop 5 (CA) | Imperial Irrigation District | Calexico, CA | Imperial Irrigation District (IID) | 5.6 GWh | Feb 1982 | Dec 2025 | Water |
| Imperial Valley Solar, LLC | Imperial Valley Solar, LLC | Calexico, CA | California Independent System Operator (CISO) | 441.7 GWh | Oct 2013 | Dec 2025 | Solar |
| Imperial Solar Energy Center South | CSOLAR IV South LLC | Calexico, CA | California Independent System Operator (CISO) | 251.1 GWh | Oct 2013 | Dec 2025 | Solar |
| Golden West Power Partners LLC | Golden West Power Partners, LLC | Calhan, CO | Public Service Company of Colorado (PSCO) | 762.6 GWh | Sep 2015 | Aug 2026 | Wind |
| Grazing Yak Solar | Grazing Yak Solar, LLC | Calhan, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 66.3 GWh | Oct 2019 | Aug 2026 | Solar |
| CalCity Solar 1 | CalCity Solar 1, LLC | California City, CA | California Independent System Operator (CISO) | 8.0 GWh | Oct 2019 | Dec 2025 | Solar |
| California City | MN8 Energy LLC | California City, CA | California Independent System Operator (CISO) | 5.1 GWh | Jun 2018 | Dec 2025 | Solar |
| California Valley Solar Ranch | Clearway Energy Operating LLC | California Valley, CA | California Independent System Operator (CISO) | 558.7 GWh | Aug 2012 | Dec 2025 | Solar |
| Whitewater Hydro Plant | Desert Water Agency | California, CA | California Independent System Operator (CISO) | 4.9 GWh | Mar 1986 | Dec 2025 | Water |
| CE Leathers | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 270.5 GWh | Oct 1989 | Dec 2025 | Geothermal |
| Vulcan-BN Geothermal Power Company | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 232.2 GWh | Nov 1985 | Dec 2025 | Geothermal |
| Salton Sea Power Gen Co - Unit 3 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 288.8 GWh | Jan 1989 | Dec 2025 | Geothermal |
| Salton Sea Power Gen Co - Unit 1 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 77.1 GWh | Jun 1982 | Dec 2025 | Geothermal |
| Elmore Company | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 368.1 GWh | Oct 1988 | Dec 2025 | Geothermal |
| Salton Sea Power Gen Co - Unit 2 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 74.8 GWh | Feb 1990 | Dec 2025 | Geothermal |
| Del Ranch Company | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 297.8 GWh | Sep 1988 | Dec 2025 | Geothermal |
| John L. Featherstone Plant | Hudson Ranch Power I LLC | Calipatria, CA | Imperial Irrigation District (IID) | 429.0 GWh | Feb 2012 | Aug 2026 | Geothermal |
| Salton Sea Power LLC - Unit 5 | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 295.9 GWh | Mar 2000 | Dec 2025 | Geothermal |
| CE Turbo LLC | CalEnergy Operating Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 9.3 GWh | Jun 2000 | Jul 2025 | Geothermal |
Summary of Power Plants By State
Figures are based on August 2026 generation numbers.| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 80 | 13,897.78 GWh |
| Alaska | # 48 | 146 | 672.99 GWh |
| Arizona | # 10 | 203 | 13,589.64 GWh |
| Arkansas | # 23 | 122 | 7,027.75 GWh |
| California | # 3 | 1,840 | 24,164.86 GWh |
| Colorado | # 30 | 321 | 5,322.30 GWh |
| Connecticut | # 34 | 180 | 4,400.98 GWh |
| Delaware | # 49 | 35 | 555.40 GWh |
| District of Columbia | # 51 | 19 | 21.71 GWh |
| Florida | # 2 | 345 | 28,185.93 GWh |
| Georgia | # 6 | 261 | 15,282.60 GWh |
| Hawaii | # 47 | 73 | 863.62 GWh |
| Idaho | # 43 | 152 | 1,754.56 GWh |
| Illinois | # 5 | 556 | 18,683.36 GWh |
| Indiana | # 17 | 226 | 9,970.06 GWh |
| Iowa | # 27 | 301 | 5,759.64 GWh |
| Kansas | # 26 | 191 | 6,368.18 GWh |
| Kentucky | # 21 | 63 | 7,221.26 GWh |
| Louisiana | # 14 | 93 | 10,670.45 GWh |
| Maine | # 45 | 250 | 1,285.31 GWh |
| Maryland | # 37 | 236 | 3,745.22 GWh |
| Massachusetts | # 41 | 679 | 1,958.59 GWh |
| Michigan | # 12 | 288 | 12,064.19 GWh |
| Minnesota | # 32 | 794 | 5,047.38 GWh |
| Mississippi | # 19 | 62 | 8,358.70 GWh |
| Missouri | # 22 | 134 | 7,125.71 GWh |
| State | Rank | Active Plants | Aug 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 72 | 2,266.60 GWh |
| Nebraska | # 39 | 132 | 3,448.00 GWh |
| Nevada | # 29 | 117 | 5,523.31 GWh |
| New Hampshire | # 42 | 60 | 1,901.10 GWh |
| New Jersey | # 25 | 409 | 6,440.88 GWh |
| New Mexico | # 33 | 166 | 4,571.47 GWh |
| New York | # 11 | 1,087 | 13,130.21 GWh |
| North Carolina | # 8 | 921 | 14,263.55 GWh |
| North Dakota | # 38 | 62 | 3,579.89 GWh |
| Ohio | # 7 | 216 | 14,448.49 GWh |
| Oklahoma | # 13 | 153 | 10,965.38 GWh |
| Oregon | # 31 | 292 | 5,257.14 GWh |
| Pennsylvania | # 4 | 270 | 23,772.83 GWh |
| Rhode Island | # 46 | 108 | 924.31 GWh |
| South Carolina | # 16 | 214 | 9,989.71 GWh |
| South Dakota | # 44 | 53 | 1,486.65 GWh |
| Tennessee | # 18 | 101 | 8,430.26 GWh |
| Texas | # 1 | 1,069 | 65,726.98 GWh |
| Utah | # 36 | 131 | 4,074.82 GWh |
| Vermont | # 50 | 118 | 175.56 GWh |
| Virginia | # 15 | 255 | 10,241.54 GWh |
| Washington | # 20 | 137 | 8,189.60 GWh |
| West Virginia | # 28 | 41 | 5,593.74 GWh |
| Wisconsin | # 24 | 272 | 6,683.19 GWh |
| Wyoming | # 35 | 71 | 4,322.19 GWh |