Bryon Center
300 100th Street SW, Byron Center, MI 49315Plant Summary Information
Bryon Center is ranked #7 out of 22 landfill gas power plants in Michigan in terms of total annual net electricity generation.
Bryon Center is comprised of 3 generators and generated 7.5 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Bryon Center |
|---|---|
| Utility Name | Energy Developments, Inc d/b/a EDL |
| Location | Kent County, MI |
| Initial Operation Date | March 2009 |
| Last Update | Dec 2025 |
| Annual Generation | 30.8 GWh |
| Annual Consumption | 363.4 k MMBtu |
| Ranked #4,831 out of 13,081 Power Plants Nationwide | |
| Ranked #80 out of 281 Landfill Gas Power Plants Nationwide | |
| Ranked #131 out of 269 Michigan Power Plants | |
| Ranked #7 out of 22 Michigan Landfill Gas Power Plants | |
| Fuel Types | Landfill Gas |
| Previous Operators |
Granger Electric Co (2013 to 2016) Energy Developments, Inc II (2017 to 2017) EDL Inc (2018 to 2023) Energy Developments, Inc d/b/a EDL (2024 to 2025) |
Map of Bryon Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bryon Center.
Monthly Net Generation for Bryon Center
Monthly Plant Fuel Consumption for Bryon Center
Bryon Center Details
| Summary Information | |
|---|---|
| Plant Name | Bryon Center (56851) |
| Plant Address | 300 100th Street SW, Byron Center, MI 49315 |
| Utility | Energy Developments, Inc d/b/a EDL (55858) |
| Latitude, Longitude | 42.7814, -85.6728 |
| Generation Dates on File | Mar 2009 to Dec 2025 |
| Initial Operation Date | March 2009 |
| Annual Generation | 30.8 GWh |
| Fuel Types | Landfill Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | RFC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Consumers Energy Co (4254) MI |
| Grid Voltage | 46.00 kV |
| Energy Storage | No |
Generator 1 Details Operating March 2009
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.6 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 1.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2009 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator 2 Details Operating March 2009
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.6 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 1.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2009 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Generator 3 Details Operating January 2024
| Technology | Landfill Gas |
|---|---|
| Prime Mover | Internal Combustion Engine |
| Ownership | Single Owner |
| Nameplate Capacity | 1.6 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 1.5 MW |
| Winter Capacity | 1.5 MW |
| Minimum Load | 1.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Landfill Gas |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 1H |
| Multiple Fuels | No |
Bryon Center Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #70 | Uwharrie Mountain Renewable | Mt. Gilead, NC | 32.4 GWh |
| #71 | Austin Gas Recovery | Austin, TX | 32.2 GWh |
| #72 | Calabasas Gas to Energy Facility | Agoura, CA | 31.9 GWh |
| #73 | Fitchburg Gas Recovery | Westminster, MA | 31.7 GWh |
| #74 | Lake Mills Gas Recovery | Lake Mills, IA | 31.7 GWh |
| #75 | Ameresco Forward | Manteca, CA | 31.6 GWh |
| #76 | Model City Energy Facility | Youngstown, NY | 31.3 GWh |
| #77 | Apple Campus 2 Fuel Cell | Cupertino, CA | 31.3 GWh |
| #78 | Bavarian LFGTE | Walton, KY | 30.9 GWh |
| #79 | Stanton Energy Center | Orlando, FL | 5.4 TWh |
| #81 | Green Knight Energy Center | Pen Argyl, PA | 30.4 GWh |
| #82 | Kiefer Landfill Generating Phase II | Sloughhouse, CA | 30.2 GWh |
| #83 | Two Pine Landfill Gas Recovery | North Little Rock, AR | 29.8 GWh |
| #84 | UNH 7.9 MW Plant | Durham, NH | 53.3 GWh |
| #85 | Lincoln Landfill | Lincoln, CA | 29.4 GWh |
| #86 | Nanticoke LFG | Binghamton, NY | 28.2 GWh |
| #87 | G2 Energy Ostrom Road LLC | Wheatland, CA | 27.7 GWh |
| #88 | Mahoning | New Springfield, OH | 27.4 GWh |
| #89 | Milner Butte LFGE | Burley, ID | 26.7 GWh |
| #90 | Reventure Park | Charlotte, NC | 26.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bryon Center.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 491 E 48th Street | Holland, MI | 142.2 GWh | 21 mi |
| Ada Cogeneration LP | Ada, MI | 184.9 GWh | 15.5 mi |
| Ada Dam | Ada, MI | 1.7 GWh | 15 mi |
| Allegan Dam | Allegan, MI | 11.7 GWh | 20.7 mi |
| Bissell Solar and Battery Generator | Grand Rapids, MI | 1.1 GWh | 15.8 mi |
| Byrne Solar, LLC | Lowell, MI | 10.3 GWh | 23.1 mi |
| Cascade Dam (MI) | Grand Rapids, MI | 3.9 GWh | 12.5 mi |
| Chatham | Lowell, MI | 103.0 MWh | 19.6 mi |
| Claude Vandyke | Dorr, MI | 8.4 GWh | 9.9 mi |
| Coopersville | Coopersville, MI | 37.9 GWh | 23.3 mi |
| Grand Valley Solar Gardens | Allendale, MI | 4.3 GWh | 16.6 mi |
| Holland Energy Park | Holland, MI | 973.5 GWh | 21.3 mi |
| J H Campbell | West Olive, MI | 5.1 TWh | 28.2 mi |
| Kent County Waste to Energy Facility | Grand Rapids, MI | 94.0 GWh | 11.7 mi |
| Municipal Power Plant | Zeeland, MI | 205.0 MWh | 18.4 mi |
| Otsego Mill Power Plant | Otsego, MI | 162.5 GWh | 22 mi |
| Pullman Solar, LLC | Lee Township, MI | 32.8 GWh | 30.4 mi |
| Riley Generating Station | Zeeland, MI | 844.0 MWh | 17.2 mi |
| Zeeland | Zeeland, MI | 600.0 MWh | 19.5 mi |
| Zeeland Generating Station | Zeeland, MI | 6.0 TWh | 16.7 mi |