300 100th Street SW, Byron Center, MI 49315Plant Summary Information
Bryon Center is ranked #7 out of 23 landfill gas power plants in Michigan in terms of total annual net electricity generation.
Bryon Center is comprised of 3 generators and generated 6.7 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Bryon Center |
---|---|
Utility Name | Energy Developments, Inc d/b/a EDL |
Location | Kent County, MI |
Initial Operation Date | March 2009 |
Last Update | Dec 2024 |
Annual Generation | 28.6 GWh |
Annual Consumption | 346.1 k MMBtu |
Ranked #4,745 out of 12,312 Power Plants Nationwide | |
Ranked #92 out of 292 Landfill Gas Power Plants Nationwide | |
Ranked #123 out of 258 Michigan Power Plants | |
Ranked #7 out of 23 Michigan Landfill Gas Power Plants | |
Fuel Types | Landfill Gas |
Previous Operators |
Granger Electric Co (2013 to 2016) Energy Developments, Inc II (2017 to 2017) EDL Inc (2018 to 2023) Energy Developments, Inc d/b/a EDL (2024 to 2024) |
Map of Bryon Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bryon Center.
Monthly Net Generation for Bryon Center
Bryon Center Details
Summary Information | |
---|---|
Plant Name | Bryon Center (56851) |
Plant Address | 300 100th Street SW, Byron Center, MI 49315 |
Utility | Energy Developments, Inc d/b/a EDL (55858) |
Latitude, Longitude | 42.7814, -85.6728 |
Generation Dates on File | Mar 2009 to Dec 2024 |
Initial Operation Date | March 2009 |
Annual Generation | 28.6 GWh |
Fuel Types | Landfill Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Consumers Energy Co (4254) MI |
Grid Voltage | 46.00 kV |
Energy Storage | No |
Generator 1 Details Operating March 2009
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 1.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2009 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 2 Details Operating March 2009
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 1.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2009 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 3 Details Operating January 2024
Technology | Landfill Gas |
---|---|
Prime Mover | Internal Combustion Engine |
Ownership | Single Owner |
Nameplate Capacity | 1.6 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 1.2 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Landfill Gas |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Bryon Center Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Landfill Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#82 | Prairie View I & II LFGTE | Wyatt, IN | 30.5 GWh |
#83 | Pecan Row Landfill To Electric Facility | Valdosta, GA | 30.5 GWh |
#84 | Model City Energy Facility | Youngstown, NY | 30.1 GWh |
#85 | Georgia LFG Oak Grove Plant | Winder, GA | 38.7 GWh |
#86 | Sarasota County LFGTE Facility | Nokomis, FL | 30.0 GWh |
#87 | Apple Campus 2 Fuel Cell | Cupertino, CA | 29.6 GWh |
#88 | Lincoln Landfill | Lincoln, CA | 29.5 GWh |
#89 | G2 Energy Ostrom Road LLC | Wheatland, CA | 29.0 GWh |
#90 | Bavarian LFGTE | Walton, KY | 28.7 GWh |
#91 | Stanton Energy Center | Orlando, FL | 4.6 TWh |
#93 | Watervliet | Watervliet, MI | 28.2 GWh |
#94 | Nanticoke LFG | Binghamton, NY | 28.2 GWh |
#95 | Suburban Landfill Gas Recovery | Glenford, OH | 28.2 GWh |
#96 | Brown County LFGTE Power Station | Georgetown, OH | 28.2 GWh |
#97 | Riverbend Landfill | McMinnville, OR | 28.1 GWh |
#98 | Finley Buttes Landfill Gas | Boardman, OR | 28.0 GWh |
#99 | Ameresco Dallas LLC | Dallas, TX | 27.6 GWh |
#100 | Sand Valley Power Station | Collinsville, AL | 27.2 GWh |
#101 | Two Pine Landfill Gas Recovery | North Little Rock, AR | 27.2 GWh |
#102 | Mahoning | New Springfield, OH | 26.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bryon Center.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
491 E 48th Street | Holland, MI | 92.2 GWh | 21 mi |
Ada Cogeneration LP | Ada, MI | 157.9 GWh | 15.5 mi |
Ada Dam | Ada, MI | 1.8 GWh | 15 mi |
Allegan Dam | Allegan, MI | 12.3 GWh | 20.7 mi |
Autumn Hills Generating Facility | Zeeland, MI | 8.8 GWh | 12.6 mi |
Bissell Solar and Battery Generator | Grand Rapids, MI | 985.0 MWh | 15.8 mi |
Byrne Solar, LLC | Lowell, MI | 198.0 MWh | 23.1 mi |
Cascade Dam | Grand Rapids, MI | 3.1 GWh | 12.5 mi |
Chatham | Lowell, MI | 42.0 MWh | 19.6 mi |
Claude Vandyke | Dorr, MI | 5.4 GWh | 9.9 mi |
Coopersville | Coopersville, MI | 36.9 GWh | 23.3 mi |
Grand Valley Solar Gardens | Allendale, MI | 4.0 GWh | 16.6 mi |
Holland Energy Park | Holland, MI | 892.9 GWh | 21.3 mi |
J H Campbell | West Olive, MI | 9.9 TWh | 28.2 mi |
Kent County Waste to Energy Facility | Grand Rapids, MI | 97.5 GWh | 11.7 mi |
Municipal Power Plant | Zeeland, MI | 63.0 MWh | 18.4 mi |
Otsego Mill Power Plant | Otsego, MI | 161.2 GWh | 22 mi |
Riley Generating Station | Zeeland, MI | 169.0 MWh | 17.2 mi |
Zeeland Farm Services | Zeeland, MI | 13.2 GWh | 16 mi |
Zeeland Generating Station | Zeeland, MI | 4.9 TWh | 16.7 mi |