Dolores Canyon Solar
TBD, Cahone, CO 81320Plant Summary Information
Dolores Canyon Solar is ranked #13 out of 178 solar farms in Colorado in terms of total annual net electricity generation.
Dolores Canyon Solar generated 77.0 GWh during the 3-month period between April 2026 to July 2026.
| Plant Name | Dolores Canyon Solar |
|---|---|
| Utility Name | Tri-State G & T Assn, Inc |
| Location | Dolores County, CO |
| Initial Operation Date | November 2025 |
| Last Update | Jul 2026 |
| Annual Generation | 179.3 GWh |
| Annual Consumption | 611.8 k MMBtu |
| Ranked #2,732 out of 13,285 Power Plants Nationwide | |
| Ranked #557 out of 7,198 Solar Power Plants Nationwide | |
| Ranked #59 out of 299 Colorado Power Plants | |
| Ranked #13 out of 178 Colorado Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Dolores Canyon Solar LLC (2020 to 2023) Tri-State G & T Assn, Inc (2024 to 2025) |
Map of Dolores Canyon Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Dolores Canyon Solar.
Monthly Net Generation for Dolores Canyon Solar
Monthly Plant Fuel Consumption for Dolores Canyon Solar
Dolores Canyon Solar Details
| Summary Information | |
|---|---|
| Plant Name | Dolores Canyon Solar (64858) |
| Plant Address | TBD, Cahone, CO 81320 |
| Utility | Tri-State G & T Assn, Inc (30151) |
| Latitude, Longitude | 37.705, -108.755 |
| Generation Dates on File | Nov 2025 to Jul 2026 |
| Initial Operation Date | November 2025 |
| Annual Generation | 179.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Western Area Power Administration - Rocky Mountain Region (WACM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | NA |
| Ash Impoundment | |
| Transmission / Distribution Owner | Tri-State G & T Assn, Inc (30151) |
| Grid Voltage | 115.00 kV |
| Energy Storage | No |
Generator C0497 Details Operating November 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 110 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 110 MW |
| Winter Capacity | 110 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | November 2025 |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 10M |
| Other Planned Modifications | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| Tilt Angle | 0.1 |
| DC Net Capacity | 145 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Dolores Canyon Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #547 | Holopaw | TBD, FL | 182.7 GWh |
| #548 | Cutlass Solar 1 LLC | Richmond, TX | 181.8 GWh |
| #549 | Nature Trail | Glen St Mary, FL | 181.2 GWh |
| #550 | Ivanpah 3 | Nipton, CA | 185.3 GWh |
| #551 | Muskegon Solar | Muskegon, MI | 180.4 GWh |
| #552 | Big Water | TBD, FL | 180.4 GWh |
| #553 | Goose Prairie Solar | Moxee, WA | 180.3 GWh |
| #554 | Fox Trail | Callahan, FL | 180.2 GWh |
| #555 | Bronson Solar | Bronson, FL | 180.1 GWh |
| #556 | Rice Creek | Putnam, FL | 179.3 GWh |
| #558 | Harts Mill Solar, LLC | Tarboro, NC | 179.2 GWh |
| #559 | Long Creek | TBD, FL | 179.2 GWh |
| #560 | County Line Renewable Energy Center | High Springs, FL | 179.1 GWh |
| #561 | Norton Creek | TBD, FL | 178.8 GWh |
| #562 | Georges Lake | TBD, FL | 178.8 GWh |
| #563 | Taylor Creek Solar | Orlando, FL | 178.7 GWh |
| #564 | Lone Star Solar | Cameron, SC | 175.9 GWh |
| #565 | Archtop Solar | Gibson City, IL | 178.0 GWh |
| #566 | FPL Saw Palmetto Solar Energy Center | Youngstown, FL | 177.8 GWh |
| #567 | Sundance Renewable Energy Center | Lee, FL | 177.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Dolores Canyon Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bluffview | Farmington, NM | 298.2 GWh | 74.5 mi |
| Cortez Solar 1, LLC | Cortez, CO | 5.6 GWh | 26.9 mi |
| Cortez Solar 2, LLC | Cortez, CO | 13.0 GWh | 23.8 mi |
| Cortez Solar 3, LLC | Cortez, CO | 4.0 GWh | 29.3 mi |
| Drop 5 (CO) | Montrose, CO | 8.9 GWh | 70.5 mi |
| Four Corners | Fruitland, NM | 9.5 TWh | 71.7 mi |
| Latigo Wind Park | Monticello, UT | 136.6 GWh | 35.8 mi |
| LPEA Sunnyside Solar 1 Facility | Durango, CO | 4.4 GWh | 63.4 mi |
| McPhee | Cortez, CO | 1.2 GWh | 13.4 mi |
| Red Mesa Solar Project | Red Mesa, UT | 186.7 GWh | 54.1 mi |
| San Juan Solar I | Kirtland, NM | 531.9 GWh | 63.6 mi |
| Shavano Falls Hydro | Montrose, CO | 10.8 GWh | 68.1 mi |
| Shavano Falls Hydro Drop 4 | Montrose, CO | 21.1 GWh | 74.1 mi |
| SMPA Solar 1 Community Solar | Bedrock, CO | 1.6 GWh | 39.2 mi |
| South Canal Hydro-3 | Montrose, CO | 12.3 GWh | 75.2 mi |
| Tacoma | Durango, CO | 1.9 GWh | 54.7 mi |
| Towaoc | Cortez, CO | 9.0 GWh | 21.4 mi |
| Tri-County Water Hydropower Project | Ridgway, CO | 7.5 GWh | 65.7 mi |
| Vallecito Hydroelectric | Bayfield, CO | 17.4 GWh | 68.3 mi |
| Williams Ignacio Natural Gas Plant | Durango, CO | 47.3 GWh | 65.8 mi |