Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| RE Adams East, LLC | Onward Energy | Fresno, CA | California Independent System Operator (CISO) | 40.7 GWh | Nov 2014 | Dec 2025 | Solar |
| RE Camelot LLC | Onward Energy | Mojave, CA | California Independent System Operator (CISO) | 121.0 GWh | Nov 2014 | Dec 2025 | Solar |
| Henrietta Solar Project | Southern Power Co | Lemoore, CA | California Independent System Operator (CISO) | 170.4 GWh | Jul 2016 | Dec 2025 | Solar |
| Fairview Farms Solar | NuGen Capital Management | Whately, MA | ISO New England (ISNE) | 2.6 GWh | May 2014 | Dec 2025 | Solar |
| White River Solar 2 | RWE Clean Energy | Alpaugh, CA | California Independent System Operator (CISO) | 49.2 GWh | Aug 2014 | Dec 2025 | Solar |
| Fort Huachuca Solar PV Project | Tucson Electric Power Co | Sierra Vista, AZ | Tucson Electric Power (TEPC) | 34.8 GWh | Nov 2014 | Dec 2025 | Solar |
| Technology Drive Solar | RWE Clean Energy | Brattleboro, VT | ISO New England (ISNE) | 2.6 GWh | Aug 2014 | Dec 2025 | Solar |
| Las Virgenes Municipal Water District | Tesla Inc. | Calabasas, CA | California Independent System Operator (CISO) | 1.4 GWh | Jan 2014 | Dec 2025 | Solar |
| Oregon University System OIT Klamath Fal | Tesla Inc. | Klamath Falls, OR | PacifiCorp West (PACW) | 2.9 GWh | Dec 2013 | Dec 2025 | Solar |
| Butler Solar Power Project | Missouri Jnt Muni.Pwr Elec. Ut. Comm. | Butler, MO | Southwest Power Pool (SWPP) | 4.2 GWh | Feb 2014 | May 2026 | Solar |
| Graham Solar Center LLC | Graham Solar Center LLC | Fair Bluff, NC | Duke Energy Progress East (CPLE) | 4.2 GWh | Nov 2014 | Dec 2025 | Solar |
| Shankle Solar Center LLC | Shankle Solar Center LLC | Shannon, NC | Duke Energy Progress East (CPLE) | 4.2 GWh | Dec 2014 | Dec 2025 | Solar |
| BearPond Solar Center LLC | BearPond Solar Center LLC | Henderson, NC | Duke Energy Progress East (CPLE) | 4.1 GWh | Nov 2014 | Dec 2025 | Solar |
| Intel Folsom Phase 2 | Tesla Inc. | Folsom, CA | Balancing Authority of Northern California (BANC) | 1.5 GWh | Sep 2012 | Dec 2025 | Solar |
| Rockville Solar II, LLC | CleanCapital Holdings | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 912.0 MWh | Jul 2014 | Dec 2025 | Solar |
| Cogenra - TEP | Terraform Arcadia | Tucson, AZ | Tucson Electric Power (TEPC) | 1.9 GWh | Jun 2014 | Dec 2025 | Solar |
| Erwin Farm | Strata Manager, LLC | Erwin, NC | Duke Energy Progress East (CPLE) | 7.4 GWh | Aug 2014 | Dec 2025 | Solar |
| Pate Farm | Strata Manager, LLC | Red Springs, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Oct 2013 | Dec 2025 | Solar |
| Nash 64 Farm | Strata Manager, LLC | Spring Hope, NC | Duke Energy Progress East (CPLE) | 6.9 GWh | Jul 2014 | Dec 2025 | Solar |
| Nash 58 Farm | Strata Manager, LLC | Nashville, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Oct 2013 | Dec 2025 | Solar |
| McKenzie Farm | Strata Manager, LLC | Whiteville, NC | Duke Energy Progress East (CPLE) | 9.3 GWh | Nov 2013 | Dec 2025 | Solar |
| Oakboro Farm | Headwater Energy, LLC | Laurinburg, NC | Duke Energy Carolinas (DUK) | 6.9 GWh | Aug 2014 | Dec 2025 | Solar |
| Castalia Solar | Strata Manager, LLC | Castalia, NC | Duke Energy Progress East (CPLE) | 3.7 GWh | May 2014 | Dec 2025 | Solar |
| Warsaw Farm | Duke Energy Progress - (NC) | Warsaw, NC | Duke Energy Progress East (CPLE) | 105.4 GWh | Nov 2015 | Dec 2025 | Solar |
| Windsor Cooper HIill Solar, LLC | Duke Energy Renewables Services | Windsor, NC | PJM Interconnection, LLC (PJM) | 8.2 GWh | Jul 2015 | Dec 2025 | Solar |
| Washington Millfield Solar, LLC | Duke Energy Renewables Services | Bath, NC | Duke Energy Progress East (CPLE) | 8.0 GWh | Nov 2013 | Dec 2025 | Solar |
| Washington Airport Solar LLC | Duke Energy Renewables Services | Washington, NC | Duke Energy Progress East (CPLE) | 9.0 GWh | Jan 2014 | Dec 2025 | Solar |
| Dogwood Solar, LLC | Duke Energy Renewables Services | Scotland Neck, NC | PJM Interconnection, LLC (PJM) | 27.3 GWh | Oct 2014 | Dec 2025 | Solar |
| Bethel Price Solar, LLC | Duke Energy Renewables Services | Bethel, NC | PJM Interconnection, LLC (PJM) | 6.3 GWh | Nov 2014 | Dec 2025 | Solar |
| Gato Montes Solar, LLC | Duke Energy Renewables Services | Tucson, AZ | Tucson Electric Power (TEPC) | 7.4 GWh | Nov 2012 | Dec 2025 | Solar |
| Sudbury Landfill | Heliovaas LLC | Sudbury, MA | ISO New England (ISNE) | 1.3 GWh | Nov 2013 | Dec 2025 | Solar |
| Sigmon Catawba Farm | Strata Manager, LLC | Newton, NC | Duke Energy Carolinas (DUK) | 2.5 GWh | May 2014 | Dec 2025 | Solar |
| Redcrest Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 34.4 GWh | Sep 2015 | Dec 2025 | Solar |
| Sonne Two | Heelstone Energy Holdings, LLC | Newton, NC | Duke Energy Carolinas (DUK) | 8.0 GWh | Nov 2016 | Dec 2025 | Solar |
| Apple One | Cypress Creek Renewables | Newton, NC | Duke Energy Carolinas (DUK) | 9.3 GWh | Sep 2015 | Dec 2025 | Solar |
| Sheldon Solar | Excelsior Energy Capital | Sheldon Springs, VT | ISO New England (ISNE) | 2.1 GWh | Aug 2013 | Dec 2025 | Solar |
| Millville City Sewer Auth WTP | MN8 Energy LLC | Millville, NJ | PJM Interconnection, LLC (PJM) | 1.4 GWh | Feb 2013 | Dec 2025 | Solar |
| Dennis Landfill | Clean Focus Yield, LLC | Dennis, MA | ISO New England (ISNE) | 7.7 GWh | Aug 2014 | Dec 2025 | Solar |
| Lepomis PV Energy LLC | CleanCapital Holdings | Plymouth, MA | ISO New England (ISNE) | 7.7 GWh | May 2014 | Dec 2025 | Solar |
| Shasta Solar Farm | Ignite Solar Holdings LLC | Fall River Mills, CA | California Independent System Operator (CISO) | 5.8 GWh | Feb 2014 | Dec 2025 | Solar |
| Cottonwood Solar, LLC (Goose Lake) | Onward Energy | Lost Hills, CA | California Independent System Operator (CISO) | 29.9 GWh | Apr 2015 | Dec 2025 | Solar |
| Cottonwood Solar, LLC (City of Corcoran) | Onward Energy | Corcoran, CA | California Independent System Operator (CISO) | 20.6 GWh | Apr 2015 | Dec 2025 | Solar |
| Upchurch Solar Center LLC | Cypress Creek Renewables | Elm City, NC | Duke Energy Progress East (CPLE) | 8.2 GWh | Nov 2014 | Dec 2025 | Solar |
| Rams Horn Solar Center LLC | Cypress Creek Renewables | Greenville, NC | Duke Energy Progress East (CPLE) | 7.8 GWh | Nov 2014 | Dec 2025 | Solar |
| Littlefield Solar Center LLC | SRE Utility Solar 1, LLC | Ayden, NC | Duke Energy Progress East (CPLE) | 7.9 GWh | Nov 2015 | Dec 2025 | Solar |
| Flemming Solar Center LLC | Cypress Creek Renewables | Greenville, NC | Duke Energy Progress East (CPLE) | 8.2 GWh | Nov 2014 | Dec 2025 | Solar |
| Rockland Solar CSG | MN8 Energy LLC | Rockland, MA | ISO New England (ISNE) | 1.6 GWh | Nov 2013 | Dec 2025 | Solar |
| Bladenboro Farm | Strata Manager, LLC | Bladenboro, NC | Duke Energy Progress East (CPLE) | 8.7 GWh | Sep 2013 | Dec 2025 | Solar |
| Patriots Stadium | Sunlight General Somerset Solar LLC | Bridgewater, NJ | PJM Interconnection, LLC (PJM) | 1.1 GWh | Aug 2013 | Dec 2024 | Solar |
| Camp Solar Plant | Axium US Solar Holdings LLC | Woodbury, GA | Southern Company Services, Inc. - Trans (SOCO) | 3.8 GWh | Nov 2013 | Dec 2025 | Solar |
| Camilla Solar Plant | Axium US Solar Holdings LLC | Pelham, GA | Southern Company Services, Inc. - Trans (SOCO) | 26.1 GWh | Oct 2013 | Dec 2025 | Solar |
| Beringer | SunStrong Management, LLC | Saint Helena, CA | California Independent System Operator (CISO) | 1.6 GWh | Dec 2008 | Dec 2025 | Solar |
| ASTI | SunStrong Management, LLC | Cloverdale, CA | California Independent System Operator (CISO) | 1.2 GWh | Jan 2009 | Dec 2025 | Solar |
| Mercer County Community College | Sunlight General Mercer Solar LLC | West Windsor, NJ | PJM Interconnection, LLC (PJM) | 9.0 GWh | Aug 2013 | Dec 2024 | Solar |
| County College of Morris | Sunlight General Morris Solar LLC | Randolph, NJ | PJM Interconnection, LLC (PJM) | 3.7 GWh | Oct 2013 | Dec 2024 | Solar |
| Wallace | AES Distributed Energy | Wallace, NC | Duke Energy Carolinas (DUK) | 3.1 GWh | Nov 2013 | Dec 2025 | Solar |
| North Carolina Solar III LLC | SRE Utility Solar 1, LLC | Gibson, NC | Duke Energy Carolinas (DUK) | 8.3 GWh | Nov 2013 | Dec 2025 | Solar |
| Duplin Solar LLC | SRE Utility Solar 1, LLC | Warsaw, NC | Duke Energy Carolinas (DUK) | 8.6 GWh | Nov 2013 | Dec 2025 | Solar |
| Kinsley Landfill Solar | Public Service Elec & Gas Co | Sewell, NJ | PJM Interconnection, LLC (PJM) | 11.9 GWh | Dec 2014 | Dec 2025 | Solar |
| Fusion Solar Center LLC | Fusion Solar Centre, L.L.C | Baltic, CT | ISO New England (ISNE) | 37.8 GWh | Feb 2018 | May 2026 | Solar |
| Dement Farm LLC | SRE Utility Solar 1, LLC | Henderson, NC | Duke Energy Progress East (CPLE) | 8.4 GWh | Jul 2013 | Dec 2025 | Solar |
| Kenansville | AES Distributed Energy | Kenansville, NC | Duke Energy Carolinas (DUK) | 3.2 GWh | Nov 2013 | Dec 2025 | Solar |
| Berkley East Solar LLC | SunEdison LLC | Berkley, MA | ISO New England (ISNE) | 4.9 GWh | Jun 2013 | Dec 2025 | Solar |
| Boseman Solar Center LLC | Cypress Creek Renewables | Rocky Mount, NC | Duke Energy Progress East (CPLE) | 8.9 GWh | Nov 2014 | Dec 2025 | Solar |
| Angier Farm | Strata Manager, LLC | Angier, NC | Duke Energy Progress East (CPLE) | 7.3 GWh | Nov 2013 | Dec 2025 | Solar |
| Fairmont-FLS 100 | AES Distributed Energy | Fairmont, NC | Duke Energy Carolinas (DUK) | 6.7 GWh | Nov 2013 | Dec 2025 | Solar |
| Rariton OMP | Janssen Pharmaceutical Co | Raritan, NJ | PJM Interconnection, LLC (PJM) | 932.0 MWh | Jan 2009 | Dec 2025 | Solar |
| Skillman | Kenvue Brands LLC | Skillman, NJ | PJM Interconnection, LLC (PJM) | 720.0 MWh | Feb 2011 | Dec 2025 | Solar |
| Raritan ITS | Janssen Pharmaceutical Co | Raritan, NJ | PJM Interconnection, LLC (PJM) | 2.2 GWh | Jul 2010 | Dec 2025 | Solar |
| Garrell Solar Farm | Strata Manager, LLC | Chadbourn, NC | Duke Energy Progress East (CPLE) | 6.9 GWh | Oct 2013 | Dec 2025 | Solar |
| Brewster Landfill | Clean Focus Yield, LLC | Brewster, MA | ISO New England (ISNE) | 1.6 GWh | Aug 2014 | Dec 2025 | Solar |
| Chatham Landfill | Clean Focus Yield, LLC | Chatham, MA | ISO New England (ISNE) | 2.4 GWh | Aug 2014 | Dec 2025 | Solar |
| Harwich Landfill | Clean Focus Yield, LLC | Harwich, MA | ISO New England (ISNE) | 5.9 GWh | Jul 2014 | Dec 2025 | Solar |
| Sunfish Farm | Cypress Creek Renewables | Willow Spring, NC | Duke Energy Progress East (CPLE) | 6.4 GWh | Nov 2015 | Dec 2025 | Solar |
| Katama Farm | Clean Focus Yield, LLC | Edgartown, MA | ISO New England (ISNE) | 1.6 GWh | May 2014 | Dec 2025 | Solar |
| Nunnepog | Clean Focus Yield, LLC | Edgartown, MA | ISO New England (ISNE) | 1.7 GWh | May 2014 | Dec 2025 | Solar |
| Barnstable Landfill | Clean Focus Yield, LLC | Marstons Mills, MA | ISO New England (ISNE) | 4.9 GWh | Aug 2014 | Dec 2025 | Solar |
| Waco Farm | Strata Manager, LLC | Waco, NC | Duke Energy Carolinas (DUK) | 9.0 GWh | Oct 2013 | Dec 2025 | Solar |
| Wagstaff Farm 1 | Strata Manager, LLC | Roxboro, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | Oct 2013 | Dec 2025 | Solar |
| Hyder II Hybrid | Arizona Public Service Co | Hyder, AZ | Arizona Public Service Company (AZPS) | 25.3 GWh | Nov 2013 | Dec 2025 | Solar |
| Tissington Solar | MN8 Energy LLC | Vernon Township, NJ | PJM Interconnection, LLC (PJM) | 3.6 GWh | Aug 2019 | Dec 2025 | Solar |
| Atwell Island | SPS Atwell Island LLC | Alpaugh, CA | California Independent System Operator (CISO) | 33.9 GWh | Feb 2013 | Dec 2025 | Solar |
| Gridley Main | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 1.4 GWh | Feb 2013 | Dec 2025 | Solar |
| Gridley Main Two | Altus Power America Management, LLC | Gridley, CA | California Independent System Operator (CISO) | 3.6 GWh | Mar 2013 | Dec 2025 | Solar |
| White River Solar | RWE Clean Energy | Alpaugh, CA | California Independent System Operator (CISO) | 36.1 GWh | Jun 2013 | Dec 2025 | Solar |
| Corcoran Solar | RWE Clean Energy | Corcoran, CA | California Independent System Operator (CISO) | 22.1 GWh | Jul 2013 | Dec 2025 | Solar |
| Oakley Solar Project | Oakley Solar Project LLC | Oakley, CA | California Independent System Operator (CISO) | 2.1 GWh | May 2013 | Dec 2025 | Solar |
| Bryan Solar Field | City of Bryan - (OH) | Bryan, OH | PJM Interconnection, LLC (PJM) | 2.4 GWh | Jan 2012 | Dec 2025 | Solar |
| Quittacas Pond Solar | RWE Clean Energy | Rochester, MA | ISO New England (ISNE) | 5.5 GWh | Nov 2013 | Dec 2025 | Solar |
| Northbridge Solar | RWE Clean Energy | South Grafton, MA | ISO New England (ISNE) | 3.2 GWh | Jul 2013 | Dec 2025 | Solar |
| CU Solar Plant | CU Solar LLC | Cedarville, OH | PJM Interconnection, LLC (PJM) | 2.1 GWh | Mar 2013 | Dec 2025 | Solar |
| CES Sterling LLC | SunEdison LLC | Sterling, MA | ISO New England (ISNE) | 2.9 GWh | Jan 2013 | Dec 2025 | Solar |
| Solar Star 1 | Solar Star California XIX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 886.6 GWh | Feb 2014 | May 2026 | Solar |
| Solar Star 2 | Solar Star California XX, LLC | Rosamond, CA | California Independent System Operator (CISO) | 747.5 GWh | Feb 2014 | May 2026 | Solar |
| IND Community Solar Farm 1st Phase | Terraform Arcadia | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 13.5 GWh | Oct 2013 | Dec 2025 | Solar |
| Heber Solar | Axium US Solar Holdings LLC | Heber, CA | Imperial Irrigation District (IID) | 24.1 GWh | Apr 2014 | Dec 2025 | Solar |
| Volkswagen Solar System | SR Enterprise South, LLC | Chattanooga, TN | Tennessee Valley Authority (TVA) | 11.5 GWh | Oct 2012 | May 2026 | Solar |
| Radiance Solar 4 | Altus Power America Management, LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2013 | Dec 2025 | Solar |
| Yanceyville Farm | Headwater Energy, LLC | Blanch, NC | Duke Energy Progress East (CPLE) | 7.1 GWh | Nov 2013 | Dec 2025 | Solar |
| AM Best Farm | Strata Manager, LLC | Goldsboro, NC | Duke Energy Progress East (CPLE) | 8.8 GWh | May 2013 | Dec 2025 | Solar |
Summary of Power Plants By State
Figures are based on May 2026 generation numbers.| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Alabama | # 8 | 77 | 11,823.92 GWh |
| Alaska | # 48 | 140 | 513.29 GWh |
| Arizona | # 14 | 196 | 9,091.99 GWh |
| Arkansas | # 25 | 117 | 4,873.33 GWh |
| California | # 4 | 1,740 | 15,360.54 GWh |
| Colorado | # 31 | 308 | 4,156.36 GWh |
| Connecticut | # 35 | 173 | 3,391.33 GWh |
| Delaware | # 49 | 35 | 236.45 GWh |
| District of Columbia | # 51 | 17 | 14.46 GWh |
| Florida | # 2 | 342 | 25,093.89 GWh |
| Georgia | # 6 | 250 | 12,138.02 GWh |
| Hawaii | # 46 | 70 | 762.50 GWh |
| Idaho | # 41 | 151 | 1,963.84 GWh |
| Illinois | # 5 | 494 | 14,816.74 GWh |
| Indiana | # 15 | 222 | 7,662.28 GWh |
| Iowa | # 21 | 297 | 5,720.38 GWh |
| Kansas | # 24 | 188 | 5,118.39 GWh |
| Kentucky | # 23 | 61 | 5,471.28 GWh |
| Louisiana | # 13 | 90 | 9,131.60 GWh |
| Maine | # 44 | 242 | 1,130.78 GWh |
| Maryland | # 37 | 228 | 3,103.37 GWh |
| Massachusetts | # 45 | 666 | 1,073.93 GWh |
| Michigan | # 11 | 276 | 9,774.25 GWh |
| Minnesota | # 28 | 790 | 4,567.82 GWh |
| Mississippi | # 20 | 60 | 6,404.61 GWh |
| Missouri | # 22 | 129 | 5,701.36 GWh |
| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,053.07 GWh |
| Nebraska | # 36 | 126 | 3,193.89 GWh |
| Nevada | # 33 | 117 | 3,848.29 GWh |
| New Hampshire | # 43 | 57 | 1,198.65 GWh |
| New Jersey | # 30 | 398 | 4,274.91 GWh |
| New Mexico | # 29 | 158 | 4,513.39 GWh |
| New York | # 10 | 1,064 | 10,643.78 GWh |
| North Carolina | # 9 | 913 | 11,481.42 GWh |
| North Dakota | # 34 | 59 | 3,601.34 GWh |
| Ohio | # 7 | 211 | 11,886.21 GWh |
| Oklahoma | # 17 | 144 | 7,547.66 GWh |
| Oregon | # 27 | 281 | 4,575.23 GWh |
| Pennsylvania | # 3 | 258 | 18,234.28 GWh |
| Rhode Island | # 47 | 107 | 580.94 GWh |
| South Carolina | # 16 | 209 | 7,632.32 GWh |
| South Dakota | # 42 | 53 | 1,802.78 GWh |
| Tennessee | # 19 | 99 | 6,454.94 GWh |
| Texas | # 1 | 1,019 | 50,690.02 GWh |
| Utah | # 39 | 128 | 2,809.26 GWh |
| Vermont | # 50 | 118 | 186.37 GWh |
| Virginia | # 18 | 250 | 7,445.56 GWh |
| Washington | # 12 | 134 | 9,231.20 GWh |
| West Virginia | # 32 | 41 | 4,142.41 GWh |
| Wisconsin | # 26 | 266 | 4,582.07 GWh |
| Wyoming | # 38 | 69 | 2,983.81 GWh |