Toledo Air National Guard
2660 South Eber Road, Swanton, OH 43558Plant Summary Information
Toledo Air National Guard is ranked #21 out of 64 solar farms in Ohio in terms of total annual net electricity generation.
Toledo Air National Guard generated 17.8 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Toledo Air National Guard |
---|---|
Utility Name | 180th Fighter Wing |
Location | Lucas County, OH |
Initial Operation Date | January 2010 |
Last Update | Dec 2024 |
Annual Generation | 45.8 GWh |
Annual Consumption | 156.1 k MMBtu |
Ranked #4,125 out of 12,299 Power Plants Nationwide | |
Ranked #962 out of 6,182 Solar Power Plants Nationwide | |
Ranked #66 out of 192 Ohio Power Plants | |
Ranked #21 out of 64 Ohio Solar Power Plants | |
Fuel Types | Solar |
Map of Toledo Air National Guard
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Toledo Air National Guard.
Monthly Net Generation for Toledo Air National Guard
Toledo Air National Guard Details
Summary Information | |
---|---|
Plant Name | Toledo Air National Guard (67967) |
Plant Address | 2660 South Eber Road, Swanton, OH 43558 |
Utility | 180th Fighter Wing (66518) |
Latitude, Longitude | 41.58638, -83.78781 |
Generation Dates on File | Jan 2024 to Dec 2024 |
Initial Operation Date | January 2010 |
Annual Generation | 45.8 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | MRO |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | National Security and International Affairs (928) |
Sector | Commercial Non-CHP (4) |
Water Source | NA |
Ash Impoundment | |
Transmission / Distribution Owner | The Toledo Edison Co (18997) OH |
Grid Voltage | 1.50 kV |
Energy Storage | No |
Generator 180FW Details Operating January 2010
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Summer Capacity | 1.5 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | January 2010 |
Combined Heat & Power | No |
Sector Name | Commercial Non-CHP (4) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Fixed Tilt | Yes |
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 2.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Toledo Air National Guard Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#952 | Corcoran Solar 3 | Corcoran, CA | 46.4 GWh |
#953 | Bayshore Solar A, LLC | Lancaster, CA | 46.4 GWh |
#954 | Shafter Solar LLC | Bakersfield, CA | 46.3 GWh |
#955 | Pumpjack Solar I | McKittrick, CA | 46.2 GWh |
#956 | Imperial Valley Solar Co (IVSC) 2, LLC | Niland, CA | 46.2 GWh |
#957 | Citizens Imperial Solar | Calipatria, CA | 46.2 GWh |
#958 | Swallowtail | Defuniak Springs, FL | 46.1 GWh |
#959 | Hayworth Solar | Edison, CA | 46.0 GWh |
#960 | Kingbird A Solar LLC | Rosamond, CA | 45.8 GWh |
#961 | Kiowa County Solar Project, LLC | Snyder, OK | 45.8 GWh |
#963 | Searchlight Solar | Searchlight, NV | 45.7 GWh |
#964 | Corcoran Solar 2 | Corcoran, CA | 45.6 GWh |
#965 | Atwell Island West Solar | Alpaugh, CA | 45.4 GWh |
#966 | Bayshore Solar B, LLC | Lancaster, CA | 45.4 GWh |
#967 | St. James Solar (LA) | Vacherie, LA | 45.4 GWh |
#968 | Antelope Expansion 1B | Lancaster, CA | 45.4 GWh |
#969 | Grassfield Solar | Chesapeake, VA | 45.2 GWh |
#970 | CID Solar, LLC | Corcoran, CA | 45.0 GWh |
#971 | Western Antelope Blue Sky Ranch A | Lancaster, CA | 44.8 GWh |
#972 | SR Odom | Moultrie, GA | 44.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Toledo Air National Guard.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AMP Napoleon Solar Facility | Napoleon, OH | 4.6 GWh | 20.8 mi |
Anthony Wayne Solar #1 | Toledo, OH | 1.5 GWh | 11.4 mi |
Bay View Backup Power Facility | Toledo, OH | 629.0 MWh | 17.2 mi |
Bowling Green Generating Station | Bowling Green, OH | 3.1 GWh | 15.1 mi |
Bowling Green Peaking | Bowling Green, OH | 2.4 GWh | 15.7 mi |
Bowling Green Wind | Bowling Green, OH | 3.6 GWh | 14.6 mi |
DG AMP Solar Bowling Green | Bowling Green, OH | 38.8 GWh | 16.9 mi |
FirstEnergy Bay Shore | Oregon, OH | 938.3 GWh | 19.5 mi |
Genoa Diesel Generating Station | Genoa, OH | 228.0 MWh | 22.7 mi |
IGS PCW1 | Rossford, OH | 1.2 GWh | 11.1 mi |
Martin Marietta Wind Project | Woodville, OH | 7.2 GWh | 23.3 mi |
Napoleon Peaking | Napoleon, OH | 244.0 MWh | 20.7 mi |
Napoleon Peaking Station | Napoleon, OH | 2.8 GWh | 20.7 mi |
Napoleon Solar I | Napoleon, OH | 10.8 GWh | 21 mi |
Oregon Clean Energy Center | Oregon, OH | 5.9 TWh | 18.6 mi |
Owens Corning Headquarters | Toledo, OH | 1.6 GWh | 13.6 mi |
PNA Rossford Solar Array | Rossford, OH | 2.4 GWh | 12.1 mi |
Temperance Solar, LLC | Erie, MI | 40.0 GWh | 17.8 mi |
Toledo Ref Power Recovery Train | Oregon, OH | 572.3 MWh | 15 mi |
Troy Energy LLC | Luckey, OH | 988.6 GWh | 18.6 mi |