LPEA Sunnyside Solar 1 Facility
299 County Road 218, Durango, CO 81303Plant Summary Information
LPEA Sunnyside Solar 1 Facility is ranked #55 out of 163 solar farms in Colorado in terms of total annual net electricity generation.
LPEA Sunnyside Solar 1 Facility generated 814.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | LPEA Sunnyside Solar 1 Facility |
|---|---|
| Utility Name | La Plata Electric Assn, Inc |
| Location | La Plata County, CO |
| Initial Operation Date | July 2024 |
| Last Update | Dec 2024 |
| Annual Generation | 4.6 GWh |
| Annual Consumption | 15.6 k MMBtu |
| Ranked #8,270 out of 12,613 Power Plants Nationwide | |
| Ranked #3,369 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #164 out of 286 Colorado Power Plants | |
| Ranked #55 out of 163 Colorado Solar Power Plants | |
| Fuel Types | Solar |
Map of LPEA Sunnyside Solar 1 Facility
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for LPEA Sunnyside Solar 1 Facility.
Monthly Net Generation for LPEA Sunnyside Solar 1 Facility
Monthly Plant Fuel Consumption for LPEA Sunnyside Solar 1 Facility
LPEA Sunnyside Solar 1 Facility Details
| Summary Information | |
|---|---|
| Plant Name | LPEA Sunnyside Solar 1 Facility (67952) |
| Plant Address | 299 County Road 218, Durango, CO 81303 |
| Utility | La Plata Electric Assn, Inc (10539) |
| Latitude, Longitude | 37.12409, -107.86024 |
| Generation Dates on File | Jan 2024 to Dec 2024 |
| Initial Operation Date | July 2024 |
| Annual Generation | 4.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Western Area Power Administration - Rocky Mountain Region (WACM) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | La Plata Electric Assn, Inc (10539) CO |
| Grid Voltage | 12.50 kV |
| Energy Storage | No |
Generator PV001 Details Operating July 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.7 MW |
| Summer Capacity | 1.7 MW |
| Winter Capacity | 1.7 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2024 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180.9 |
| DC Net Capacity | 2.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | Yes |
| Virtual Net Metering DC Capacity | 2.1 MW |
LPEA Sunnyside Solar 1 Facility Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3359 | DRPA Ferry Ave Station Solar Project | City of Camden, NJ | 4.6 GWh |
| #3360 | Beloit Solar LLC | Beloit, KS | 4.6 GWh |
| #3361 | Wonderful Nursery | Wasco, CA | 4.6 GWh |
| #3362 | AMP Napoleon Solar Facility | Napoleon, OH | 4.6 GWh |
| #3363 | Ports Jersey City Solar | Jersey City, NJ | 4.6 GWh |
| #3364 | BQ - Psychedelic Site CSG | Swan Lake, NY | 4.6 GWh |
| #3365 | Bedford Solar (Oppidum) | Bedford, VA | 4.6 GWh |
| #3366 | Woodlawn CSG | Crete, IL | 4.6 GWh |
| #3367 | Trenton Solar Farm (MO) | Trenton, MO | 4.6 GWh |
| #3368 | Burlington Coat Factory Solar | Florence, NJ | 4.6 GWh |
| #3370 | Galloway Landfill | Wall, NJ | 4.6 GWh |
| #3371 | IL Sidney Project1 | Sidney, IL | 4.6 GWh |
| #3372 | MilfordSolar OR | Forest Grove, OR | 4.6 GWh |
| #3373 | Exeter Solar | Exeter, CA | 4.6 GWh |
| #3374 | Chicopee Solar | Chicopee, MA | 4.6 GWh |
| #3375 | Lowndes Tycor Farms | Lake Park, GA | 4.6 GWh |
| #3376 | USS Solar Brick | Standard City, IL | 4.6 GWh |
| #3377 | Mount Dora Solar Farm F | Mount Dora, FL | 4.6 GWh |
| #3378 | DG Dighton LLC CSG | Dighton, MA | 4.6 GWh |
| #3379 | California City | California City, CA | 4.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding LPEA Sunnyside Solar 1 Facility.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ames Hydro | Ophir, CO | 6.6 GWh | 51.3 mi |
| Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 679.0 GWh | 81.4 mi |
| Bluffview | Farmington, NM | 411.8 GWh | 34.3 mi |
| Cortez Solar 1, LLC | Cortez, CO | 5.4 GWh | 40.1 mi |
| Cortez Solar 2, LLC | Cortez, CO | 9.5 GWh | 45.1 mi |
| Cortez Solar 3, LLC | Cortez, CO | 4.5 GWh | 41.5 mi |
| Dolores Canyon Solar | Cahone, CO | 21.5 GWh | 63.4 mi |
| Four Corners | Fruitland, NM | 8.2 TWh | 45.6 mi |
| Jicarilla Solar 1 LLC | Dulce, NM | 107.0 GWh | 64.4 mi |
| Jicarilla Solar 2 | Dulce, NM | 127.6 GWh | 77.9 mi |
| McPhee | Cortez, CO | 6.1 GWh | 50.1 mi |
| Navajo Dam | Farmington, NM | 72.0 GWh | 25.9 mi |
| Red Mesa Solar Project | Red Mesa, UT | 188.4 GWh | 85.5 mi |
| San Juan Solar I | Kirtland, NM | 484.5 GWh | 33.4 mi |
| Shallow Basket | Dulce, NM | 146.6 GWh | 67.5 mi |
| Tacoma | Durango, CO | 4.3 GWh | 27.9 mi |
| Towaoc | Cortez, CO | 9.8 GWh | 44.6 mi |
| Tri-County Water Hydropower Project | Ridgway, CO | 16.5 GWh | 77.2 mi |
| Vallecito Hydroelectric | Bayfield, CO | 19.1 GWh | 23.4 mi |
| Williams Ignacio Natural Gas Plant | Durango, CO | 46.6 GWh | 4.4 mi |