LPEA Sunnyside Solar 1 Facility

299 County Road 218, Durango, CO 81303

Plant Summary Information

LPEA Sunnyside Solar 1 Facility is ranked #54 out of 153 solar farms in Colorado in terms of total annual net electricity generation.

LPEA Sunnyside Solar 1 Facility generated 814.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameLPEA Sunnyside Solar 1 Facility
Utility NameLa Plata Electric Assn, Inc
LocationLa Plata County, CO
Initial Operation DateJuly 2024
Last Update Dec 2024
Annual Generation 4.6 GWh
Annual Consumption 15.6 k MMBtu
Ranked #8,093 out of 12,299 Power Plants Nationwide
Ranked #3,208 out of 6,182 Solar Power Plants Nationwide
Ranked #163 out of 283 Colorado Power Plants
Ranked #54 out of 153 Colorado Solar Power Plants
Fuel Types Solar

Map of LPEA Sunnyside Solar 1 Facility

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for LPEA Sunnyside Solar 1 Facility.

Create Your Account Today

Monthly Net Generation for LPEA Sunnyside Solar 1 Facility

LPEA Sunnyside Solar 1 Facility Details

Summary Information
Plant NameLPEA Sunnyside Solar 1 Facility (67952)
Plant Address299 County Road 218, Durango, CO 81303
UtilityLa Plata Electric Assn, Inc (10539)
Latitude, Longitude37.12409, -107.86024
Generation Dates on FileJan 2024 to Dec 2024
Initial Operation DateJuly 2024
Annual Generation 4.6 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionWECC
Balancing AuthorityWestern Area Power Administration - Rocky Mountain Region (WACM)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerLa Plata Electric Assn, Inc (10539) CO
Grid Voltage 12.50 kV
Energy StorageNo

Generator PV001 Details Operating July 2024

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.7 MW
Summer Capacity1.7 MW
Winter Capacity1.7 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJuly 2024
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
BifacialYes
Azimuth Angle180.9
DC Net Capacity2.1 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementYes
Virtual Net Metering DC Capacity2.1 MW

LPEA Sunnyside Solar 1 Facility Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#3198Beloit Solar LLCBeloit, KS4.6 GWh
#3199Wonderful NurseryWasco, CA4.6 GWh
#3200AMP Napoleon Solar FacilityNapoleon, OH4.6 GWh
#3201Ports Jersey City SolarJersey City, NJ4.6 GWh
#3202BQ - Psychedelic Site CSGSwan Lake, NY4.6 GWh
#3203Bedford SolarBedford, VA4.6 GWh
#3204Woodlawn CSGCrete, IL4.6 GWh
#3205Monroe 009452 SCS Cozad, LLCCozad, NE4.6 GWh
#3206Trenton Solar Farm (MO)Trenton, MO4.6 GWh
#3207Burlington Coat Factory SolarFlorence, NJ4.6 GWh
#3209Galloway LandfillWall, NJ4.6 GWh
#3210IL Sidney Project1Sidney, IL4.6 GWh
#3211MilfordSolar ORForest Grove, OR4.6 GWh
#3212MustangOklahoma City, OK551.3 GWh
#3213Exeter SolarExeter, CA4.6 GWh
#3214Chicopee SolarChicopee, MA4.6 GWh
#3215Lowndes Tycor FarmsLake Park, GA4.6 GWh
#3216USS Solar BrickStandard City, IL4.6 GWh
#3217Mount Dora Solar Farm FMount Dora, FL4.6 GWh
#3218California CityCalifornia City, CA4.6 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding LPEA Sunnyside Solar 1 Facility.

Plant NamePlant LocationAnnual GenerationDistance
Ames HydroOphir, CO6.6 GWh51.3 mi
Arroyo Solar Energy Storage HybridPueblo Pintado, NM688.9 GWh81.4 mi
BluffviewFarmington, NM354.0 GWh34.3 mi
Cortez Solar 1, LLCCortez, CO5.4 GWh40.1 mi
Cortez Solar 2, LLCCortez, CO9.5 GWh45.1 mi
Cortez Solar 3, LLCCortez, CO4.5 GWh41.5 mi
Drop 5Montrose, CO9.3 GWh88.5 mi
Four CornersFruitland, NM7.4 TWh45.6 mi
Jicarilla Solar 1 LLCDulce, NM86.6 GWh64.4 mi
Jicarilla Solar 2Dulce, NM122.1 GWh77.9 mi
McPheeCortez, CO6.1 GWh50.1 mi
Navajo DamFarmington, NM72.0 GWh25.9 mi
Red Mesa Solar ProjectRed Mesa, UT194.0 GWh85.5 mi
San Juan Solar IKirtland, NM181.0 GWh33.4 mi
Shavano Falls Hydro Drop 4Montrose, CO23.0 GWh91.8 mi
TacomaDurango, CO957.0 MWh27.9 mi
TowaocCortez, CO9.8 GWh44.6 mi
Tri-County Water Hydropower ProjectRidgway, CO16.4 GWh77.2 mi
Vallecito HydroelectricBayfield, CO19.1 GWh23.4 mi
Williams Ignacio Natural Gas PlantDurango, CO48.1 GWh4.4 mi