Guilderland Solar
6580 Dunnsville Road, Altamont, NY 12009Plant Summary Information
Guilderland Solar is ranked #406 out of 544 solar farms in New York in terms of total annual net electricity generation.
Guilderland Solar generated 608.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Guilderland Solar |
---|---|
Utility Name | Helios Energy New York 13 LLC |
Location | Albany County, NY |
Initial Operation Date | December 2023 |
Last Update | Dec 2024 |
Annual Generation | 2.5 GWh |
Annual Consumption | 8.5 k MMBtu |
Ranked #9,754 out of 12,299 Power Plants Nationwide | |
Ranked #4,622 out of 6,182 Solar Power Plants Nationwide | |
Ranked #717 out of 912 New York Power Plants | |
Ranked #406 out of 544 New York Solar Power Plants | |
Fuel Types | Solar |
Map of Guilderland Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Guilderland Solar.
Monthly Net Generation for Guilderland Solar
Guilderland Solar Details
Summary Information | |
---|---|
Plant Name | Guilderland Solar (68154) |
Plant Address | 6580 Dunnsville Road, Altamont, NY 12009 |
Utility | Helios Energy New York 13 LLC (66627) |
Latitude, Longitude | 42.71655, -74.02264 |
Generation Dates on File | Jan 2024 to Dec 2024 |
Initial Operation Date | December 2023 |
Annual Generation | 2.5 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 24-807-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | NPCC |
Balancing Authority | New York Independent System Operator (NYIS) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Niagara Mohawk Power Corp. (13573) NY |
Grid Voltage | 13.20 kV |
Energy Storage | No |
Generator GDRLD Details Operating December 2023
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 5 MW |
Summer Capacity | 5 MW |
Winter Capacity | 5 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2023 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 7.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Guilderland Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4612 | Prescott Airport | Prescott, AZ | 2.5 GWh |
#4613 | Los Angeles Harbor College | Wilmington, CA | 2.5 GWh |
#4614 | Douglas Solar | Douglas, MA | 2.5 GWh |
#4615 | Liberty HS Solar Project | Bakersfield, CA | 2.5 GWh |
#4616 | Caney Valley | Sedan, KS | 2.5 GWh |
#4617 | Duplin Solar I LLC (160 Houston Lane) | Kenansville, NC | 2.5 GWh |
#4618 | Bryan Solar Field | Bryan, OH | 2.5 GWh |
#4619 | Enerparc CA1 LLC | Hollister, CA | 2.5 GWh |
#4620 | Park Meridian #1 | Riverside, CA | 2.5 GWh |
#4621 | Lion One | Baltimore, MD | 2.5 GWh |
#4623 | Epic Verona | Verona, WI | 2.7 GWh |
#4624 | Santa Rita Jail Hybrid | Dublin, CA | 13.1 GWh |
#4625 | Fall River Solar CSG | Fall River, MA | 2.5 GWh |
#4626 | IKEA Joliet Rooftop PV System | Joliet, IL | 2.5 GWh |
#4627 | ME Novel Lighthouse - Huggard Ave Solar | Limestone, ME | 2.5 GWh |
#4628 | Oneida - South | Whitestown, NY | 2.5 GWh |
#4629 | Oneida - West | Whitestown, NY | 2.5 GWh |
#4630 | Emmitsburg Solar Arrays | Emmitsburg, MD | 2.5 GWh |
#4631 | Sunnyside Ranch Community Solar Array | Carbondale, CO | 2.5 GWh |
#4632 | Winchendon Solar | Winchendon, MA | 2.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Guilderland Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Altamont (NY) (CSG) | Guilderland, NY | 12.0 MWh | 4.6 mi |
Capital Hill Solar LLC | Albany, NY | 2.0 GWh | 10.3 mi |
Duanesburg | Duanesburg, NY | 3.3 GWh | 9.6 mi |
Gifford CSG | Schenectady, NY | 2.4 GWh | 7.8 mi |
Glenville Solar (CSG) | Glenville, NY | 17.0 MWh | 9.6 mi |
Guildlerland CSG | Guilderland, NY | 3.1 GWh | 1.3 mi |
Knaggs Brothers Farm | Altamont, NY | 6.9 GWh | 2.9 mi |
Krumkill Road Solar North, LLC | Guilderland, NY | 2.6 GWh | 9.1 mi |
Krumkill Road Solar South, LLC | Guilderland, NY | 2.8 GWh | 9.1 mi |
MM Albany Energy | Albany, NY | 10.1 GWh | 8.8 mi |
Mohonasen Central School District | Schenectady, NY | 1.6 GWh | 4.8 mi |
Normanskill Hydro Project | Guilderland, NY | 2.3 GWh | 3.3 mi |
Princetown Solar 1 | Duanesburg, NY | 221.0 MWh | 5 mi |
SCH - (2A) 156 Barhydt Rd Glenville | Glenville, NY | 6.4 GWh | 9.3 mi |
SCH County - (1B) 10 Alice Wagner Way Ni | Niskayuna, NY | 4.2 GWh | 10.3 mi |
SCH County - (1E) 398 Anthony St Schenec | Schenectady, NY | 1.3 GWh | 10.2 mi |
SCH County - (2D) 98 Cheltingham Ave Sch | Schenectady, NY | 3.4 GWh | 6.2 mi |
Sunnyside 1 Solar | Scotia, NY | 7.9 GWh | 9.2 mi |
Sunnyside 2 Solar | Scotia, NY | 8.2 GWh | 9.2 mi |
Washington Avenue Solar, LLC | Glenville, NY | 4.2 GWh | 8.1 mi |