Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Rose Hill Road Solar 2 - Spafford 2 | 38DN Asset Management LLC | Skaneateles, NY | New York Independent System Operator (NYIS) | 3.0 GWh | Apr 2025 | Dec 2025 | Solar |
| Rose Hill Road Solar 1 - Spafford 1 | 38DN Asset Management LLC | Skaneateles, NY | New York Independent System Operator (NYIS) | 6.4 GWh | Apr 2025 | Dec 2025 | Solar |
| Redwood 4 Solar Farm | 54 KR 8me LLC | Edison, CA | California Independent System Operator (CISO) | 18.9 GWh | Nov 2017 | Dec 2025 | Solar |
| Red Tailed Hawk Solar LLC | Acciona Energy USA Global, LLC | Pierce, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 777.4 GWh | Aug 2024 | May 2026 | Solar |
| Red Hills Wind Project LLC | Acciona Wind Energy USA LLC | Hammon, OK | Southwest Power Pool (SWPP) | 190.2 GWh | Nov 2008 | Dec 2025 | Wind |
| River Bend Solar, LLC (MT) | Adapture Renewables, Inc. | Reed Point, MT | NorthWestern Corporation (NWMT) | 3.1 GWh | Mar 2017 | May 2026 | Solar |
| Raceway Solar & Storage | AES Clean Energy | Lancaster, CA | California Independent System Operator (CISO) | 361.7 GWh | Apr 2024 | May 2026 | Solar |
| Rexford Solar Farm | AES Clean Energy | Ducor, CA | California Independent System Operator (CISO) | 707.8 GWh | Jan 2025 | May 2026 | Solar |
| Ryan Road Solar LLC Hybrid(CSG) | AES Distributed Energy | North Brookfield, MA | ISO New England (ISNE) | 9.6 GWh | Nov 2021 | Dec 2025 | Solar |
| Randall Solar Project Hybrid | AES Distributed Energy | Berlin, MA | ISO New England (ISNE) | 8.5 GWh | Jun 2021 | Dec 2025 | Solar |
| Ransomville Solar 1, LLC | AES Distributed Energy | Ransomville, NY | New York Independent System Operator (NYIS) | 6.0 GWh | Nov 2019 | Dec 2025 | Solar |
| Redcrest Solar Farm | AES Distributed Energy | Edison, CA | California Independent System Operator (CISO) | 34.4 GWh | Sep 2015 | Dec 2025 | Solar |
| Redman North Community Solar | AES Distributed Energy | Brockport, NY | ISO New England (ISNE) | 106.0 MWh | Jan 2022 | Dec 2025 | Solar |
| Redman South Community Solar | AES Distributed Energy | Brockport, NY | ISO New England (ISNE) | 8.3 GWh | Jan 2022 | Jun 2025 | Solar |
| Richmond NMCA | AES Distributed Energy | Wood River Junction, RI | ISO New England (ISNE) | 6.0 GWh | Nov 2018 | May 2026 | Solar |
| Richmond Spider Solar | AES Distributed Energy | Spotsylvania, VA | PJM Interconnection, LLC (PJM) | 36.2 GWh | Nov 2020 | Dec 2025 | Solar |
| Rincon Solar I | AES Distributed Energy | Rincon, GA | Southern Company Services, Inc. - Trans (SOCO) | 23.9 GWh | Nov 2016 | Dec 2025 | Solar |
| Riverhead Solar Farm | AES Distributed Energy | Calverton, NY | New York Independent System Operator (NYIS) | 33.4 GWh | Jun 2019 | Dec 2025 | Solar |
| Rodeo Solar C2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.6 GWh | Apr 2014 | Dec 2025 | Solar |
| Rodeo Solar D2 | AES Distributed Energy | Lancaster, CA | California Independent System Operator (CISO) | 3.5 GWh | Apr 2014 | Dec 2025 | Solar |
| Rowe (CSG) | AES Distributed Energy | Olean, NY | ISO New England (ISNE) | 7.7 GWh | Oct 2021 | Dec 2025 | Solar |
| RT 52 Walden Solar 1, LLC Hybrid | AES Distributed Energy | Montgomery, NY | New York Independent System Operator (NYIS) | 4.7 GWh | Nov 2019 | Dec 2025 | Solar |
| Richland South | AETS OpCo Holdings LLC | Richland, NY | New York Independent System Operator (NYIS) | 3.9 GWh | Nov 2024 | Dec 2025 | Solar |
| Richland North | AETS OpCo Holdings LLC | Richland, NY | New York Independent System Operator (NYIS) | 5.8 GWh | Nov 2024 | Dec 2025 | Solar |
| Ruhlmann A (CSG) | AETS OpCo Holdings LLC | Lockport, NY | New York Independent System Operator (NYIS) | 7.8 GWh | Oct 2024 | Dec 2025 | Solar |
| Rhinelander Mill | Ahlstrom-Munksjo | Rhinelander, WI | Midcontinent Independent System Operator, Inc. (MISO) | 7.3 GWh | Nov 1917 | May 2026 | Water |
| Rapids Energy Center | ALLETE, Inc. | Grand Rapids, MN | Midcontinent Independent System Operator, Inc. (MISO) | 40.4 GWh | Dec 1942 | Dec 2025 | Natural Gas : 81.7% Water : 18.3% |
| Rantoul Solar | Altorfer Inc. | Rantoul, IL | Midcontinent Independent System Operator, Inc. (MISO) | 5.0 MWh | Nov 2016 | Dec 2025 | Solar |
| Ramapo | Altus Power America Management, LLC | Mahwah, NJ | PJM Interconnection, LLC (PJM) | 3.7 GWh | Jun 2019 | Dec 2025 | Solar |
| Rancho Cucamonga Dist #1 | Altus Power America Management, LLC | Rancho Cucamonga, CA | California Independent System Operator (CISO) | 3.1 GWh | Mar 2015 | Dec 2025 | Solar |
| Ryland Road Solar | Altus Power America Management, LLC | Tyner, NC | PJM Interconnection, LLC (PJM) | 10.6 GWh | Aug 2021 | Dec 2025 | Solar |
| Randolph | Altus Power America Management, LLC | Randolph, MA | ISO New England (ISNE) | 5.8 GWh | Oct 2017 | Dec 2025 | Solar |
| Rushford Village | Altus Power America Management, LLC | Rushford Village, MN | Midcontinent Independent System Operator, Inc. (MISO) | 1.8 GWh | Oct 2021 | Dec 2025 | Solar |
| Redwing Solar | Altus Power America Management, LLC | Darlington, SC | Duke Energy Progress East (CPLE) | 3.7 GWh | Jan 2019 | Dec 2025 | Solar |
| Rockdale | Altus Power America Management, LLC | Williamsport, MD | PJM Interconnection, LLC (PJM) | 1.6 GWh | Sep 2019 | Nov 2025 | Solar |
| River Solar | Altus Power America Management, LLC | Lynchburg, SC | Duke Energy Progress East (CPLE) | 3.5 GWh | Nov 2018 | Dec 2025 | Solar |
| Rising Paper | Altus Power America Management, LLC | Great Barrington, MA | ISO New England (ISNE) | 3.4 GWh | Apr 2016 | Dec 2025 | Solar |
| Rail Trail | Altus Power America Management, LLC | Great Barrington, MA | ISO New England (ISNE) | 3.1 GWh | Apr 2016 | Dec 2025 | Solar |
| Radiance Solar 4 | Altus Power America Management, LLC | Lancaster, CA | California Independent System Operator (CISO) | 3.2 GWh | Jun 2013 | Dec 2025 | Solar |
| Radiance Solar 5 | Altus Power America Management, LLC | Lancaster, CA | California Independent System Operator (CISO) | 2.9 GWh | Jun 2013 | Dec 2025 | Solar |
| Red Rock | Arizona Public Service Co | Red Rock, AZ | Arizona Public Service Company (AZPS) | 88.4 GWh | Jan 2017 | May 2026 | Solar |
| Red Hawk | Arizona Public Service Co | Arlington, AZ | Salt River Project Agricultural Improvement and Power District (SRP) | 5.0 TWh | Jun 2002 | May 2026 | Natural Gas |
| Robert Mueller Energy Center | Austin Energy | Austin, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 30.0 GWh | Jun 2006 | Dec 2025 | Natural Gas : 99.9% |
| Roaring Brook, LLC | Avangrid Power LLC | Lowville, NY | New York Independent System Operator (NYIS) | 191.4 GWh | Sep 2021 | May 2026 | Wind |
| Rugby Wind Power Project | Avangrid Power LLC | Barton, ND | Midcontinent Independent System Operator, Inc. (MISO) | 348.1 GWh | Nov 2009 | Dec 2025 | Wind |
| Rathdrum | Avista Corp | Rathdrum, ID | Avista Corporation (AVA) | 793.2 GWh | Oct 1994 | Dec 2025 | Natural Gas |
| R D Green | Big Rivers Electric Corp | Robards, KY | Midcontinent Independent System Operator, Inc. (MISO) | 580.7 GWh | Nov 1979 | May 2026 | Natural Gas |
| Richland Township Solar II, LLC | Birch Creek Power, LLC | Washburn, IL | Midcontinent Independent System Operator, Inc. (MISO) | 5.5 GWh | Aug 2025 | Dec 2025 | Solar |
| Richland Township Solar, LLC | Birch Creek Power, LLC | Washburn, IL | Midcontinent Independent System Operator, Inc. (MISO) | 78.0 GWh | Dec 2024 | May 2026 | Solar |
| Regeneron Tarrytown | Bloom Energy | Tarrytown, NY | New York Independent System Operator (NYIS) | 11.7 GWh | Sep 2018 | Dec 2025 | Natural Gas |
| Ratkovich Alhambra | Bloom Energy | Alhambra, CA | California Independent System Operator (CISO) | 7.4 GWh | Nov 2018 | Dec 2025 | Natural Gas |
| Redlands Community Hospital | Bloom Energy | Redlands, CA | California Independent System Operator (CISO) | 8.6 GWh | May 2021 | Dec 2025 | Natural Gas |
| Roosevelt County | Boralex US Operations LLC | Portales, NM | Southwest Power Pool (SWPP) | 759.1 GWh | Nov 2015 | May 2026 | Wind |
| Rutgers Busch Liv (Lot 55, 58, 58A, 58B) | Bowser Road Solar Project 2021, LLC | Piscataway, NJ | PJM Interconnection, LLC (PJM) | 2.2 GWh | Nov 2023 | Dec 2025 | Solar |
| Rutgers Busch Livingston Lot B & C | Bowser Road Solar Project 2021, LLC | Piscataway, NJ | PJM Interconnection, LLC (PJM) | 2.4 GWh | Nov 2023 | Dec 2025 | Solar |
| Rolfe Canal Hydro | Briar-Hydro Associates | Penacook, NH | ISO New England (ISNE) | 16.3 GWh | Nov 1987 | Dec 2025 | Water |
| Rumford Falls Hydro Facility | Brookfield Power New England | Rumford, ME | ISO New England (ISNE) | 212.1 GWh | Dec 1917 | Dec 2025 | Water |
| Robert P Mone Plant | Buckeye Power, Inc | Convoy, OH | PJM Interconnection, LLC (PJM) | 327.9 GWh | Jun 2002 | Dec 2025 | Natural Gas : 98.0% Distillate Fuel Oil : 2.0% |
| Route 5 & 20 Community Solar Farm | Bullrock-NxtGenREA | E Bloomfield, NY | New York Independent System Operator (NYIS) | 2.1 GWh | Mar 2025 | Dec 2025 | Solar |
| Red Bluff | California Power Holdings LLC | Red Bluff, CA | California Independent System Operator (CISO) | 10.5 GWh | Jul 2001 | Dec 2024 | Natural Gas |
| Ravenbrook | Captona Ravenbrook LLC | Carver, MA | ISO New England (ISNE) | 6.4 GWh | Nov 2013 | Dec 2025 | Solar |
| Railroad Solar Farm, LLC | Cardinal Renewables | Pembroke, NC | Duke Energy Progress East (CPLE) | 6.5 GWh | Nov 2016 | Dec 2025 | Solar |
| Rockmart | Cardinal Renewables | Rockmart, GA | Southern Company Services, Inc. - Trans (SOCO) | 5.3 GWh | Oct 2022 | Dec 2025 | Solar |
| Roseton Generating Facility | CCI Roseton LLC | Newsburgh, NY | New York Independent System Operator (NYIS) | 795.9 GWh | Aug 1974 | May 2026 | Natural Gas : 75.6% Residual Fuel Oil : 24.4% |
| Rutan | CD US Solar MT 2 LLC | Palmdale, CA | California Independent System Operator (CISO) | 3.0 GWh | Dec 2013 | Dec 2025 | Solar |
| Riverhead | CD US Solar MT1 LLC | Riverhead, NY | New York Independent System Operator (NYIS) | 1.7 GWh | Mar 2011 | Dec 2025 | Solar |
| Rudy Solar, LLC | CD US Solar PO 3, LLC | Silver Lake, CA | California Independent System Operator (CISO) | 3.1 GWh | Nov 2014 | Dec 2025 | Solar |
| Richmond Cogen | Chevron Products Company-Richmond | Richmond, CA | California Independent System Operator (CISO) | 956.3 GWh | Jul 1992 | May 2026 | Natural Gas : 97.6% Other Gas : 2.4% |
| Ruthton Ridge LLC | CHI Operations Inc | Lake Benton, MN | Midcontinent Independent System Operator, Inc. (MISO) | 4.8 GWh | Dec 2000 | Dec 2024 | Wind |
| Red Hills Generating Facility | Choctaw Generation L.P, L.L.L.P. | Ackerman, MS | Tennessee Valley Authority (TVA) | 2.1 TWh | Mar 2001 | May 2026 | Lignite Coal : 99.5% Natural Gas : 0.5% |
| Route 57 Solar | Citizens Enterprises Corporation | Agawam, MA | ISO New England (ISNE) | 2.2 GWh | Feb 2013 | Dec 2025 | Solar |
| Rehoboth Solar | Citizens Enterprises Corporation | Rehoboth, MA | ISO New England (ISNE) | 2.9 GWh | Nov 2013 | Dec 2025 | Solar |
| R C Kirkwood | City & County of San Francisco - (CA) | Groveland, CA | California Independent System Operator (CISO) | 489.0 GWh | Jan 1967 | May 2026 | Water |
| Rocky River (SC) | City of Abbeville - (SC) | Iva, SC | Duke Energy Carolinas (DUK) | 2.4 GWh | Dec 1940 | Dec 2025 | Water |
| Ray D Nixon | City of Colorado Springs - (CO) | Fountain, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 1.2 TWh | Mar 1980 | May 2026 | Subbituminous Coal : 95.7% Natural Gas : 4.1% |
| Ruxton Park | City of Colorado Springs - (CO) | Manitou Spring, CO | Western Area Power Administration - Rocky Mountain Region (WACM) | 1.0 GWh | Apr 1925 | Aug 2025 | Water |
| Renick Run Pumping Station 03-04 | City of Columbus - (OH) | Columbus, OH | PJM Interconnection, LLC (PJM) | 1.0 MWh | Aug 2006 | Dec 2025 | Distillate Fuel Oil |
| Ray Olinger | City of Garland - (TX) | Navada, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 51.1 GWh | Jun 1967 | Dec 2025 | Natural Gas |
| Riverside Holyoke | City of Holyoke Gas and Elec Dept - (MA) | Holyoke, MA | ISO New England (ISNE) | 22.5 GWh | Dec 1905 | Dec 2025 | Water |
| Rapide Croche | City of Kaukauna (WI) | Kaukana, WI | Midcontinent Independent System Operator, Inc. (MISO) | 16.5 GWh | Dec 1925 | Dec 2025 | Water |
| Rowesville Rd Plant | City of Orangeburg - (SC) | Orangeburg, SC | Duke Energy Carolinas (DUK) | 928.0 MWh | May 1994 | Dec 2025 | Natural Gas |
| Radford | City of Radford - (VA) | Radford, VA | PJM Interconnection, LLC (PJM) | 5.0 GWh | Sep 1934 | Dec 2025 | Water |
| Red Bud | City of Red Bud - (IL) | Red Bud, IL | Midcontinent Independent System Operator, Inc. (MISO) | 262.0 MWh | Feb 1959 | Dec 2025 | Distillate Fuel Oil |
| Red Cloud | City of Red Cloud - (NE) | Red Cloud, NE | Southwest Power Pool (SWPP) | 37.0 MWh | Dec 1949 | Dec 2025 | Distillate Fuel Oil |
| Redding Power | City of Redding - (CA) | Redding, CA | Balancing Authority of Northern California (BANC) | 161.8 GWh | Dec 1988 | May 2026 | Natural Gas |
| Riverside Energy Resource Center | City of Riverside - (CA) | Riverside, CA | California Independent System Operator (CISO) | 16.8 GWh | May 2006 | Dec 2025 | Natural Gas |
| Rockford | City of Rockford- (IA) | Rockford, IA | Midcontinent Independent System Operator, Inc. (MISO) | 6.0 MWh | Jul 1951 | Dec 2025 | Distillate Fuel Oil |
| Roseville Energy Park | City of Roseville - (CA) | Roseville, CA | Balancing Authority of Northern California (BANC) | 320.4 GWh | Oct 2007 | May 2026 | Natural Gas |
| Roseville Power Plant #2 | City of Roseville - (CA) | Rocklin, CA | Balancing Authority of Northern California (BANC) | 569.0 MWh | Mar 1986 | Dec 2025 | Natural Gas : 99.9% |
| Russell Downtown | City of Russell - (KS) | Russell, KS | Southwest Power Pool (SWPP) | 33.0 MWh | Jan 1971 | Dec 2025 | Natural Gas : 68.5% Distillate Fuel Oil : 31.5% |
| Russell Energy Center | City of Russell - (KS) | Russell, KS | Southwest Power Pool (SWPP) | 385.0 MWh | Jan 2002 | Dec 2025 | Natural Gas |
| Rio Nogales Power Project | City of San Antonio - (TX) | Seguin, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 4.6 TWh | Apr 2002 | May 2026 | Natural Gas |
| Remy Jade Power Station | City of San Antonio - (TX) | Crosby, TX | Electric Reliability Council of Texas, Inc. (ERCO) | 433.6 GWh | May 2024 | May 2026 | Natural Gas |
| Ross | City of Seattle - (WA) | Rockport, WA | Seattle City Light (SCL) | 714.9 GWh | Nov 1952 | May 2026 | Water |
| Reynolds | City of Springfield - (IL) | Springfield, IL | Midcontinent Independent System Operator, Inc. (MISO) | 179.0 MWh | Oct 1970 | Dec 2025 | Distillate Fuel Oil |
| Regional Wastewater Control Facility | City of Stockton MUD - (CA) | Stockton, CA | California Independent System Operator (CISO) | 4.0 GWh | Oct 2000 | Dec 2025 | Other Biomass Gas : 98.0% Natural Gas : 1.9% |
| Riley Generating Station | City of Zeeland - (MI) | Zeeland, MI | Midcontinent Independent System Operator, Inc. (MISO) | 844.0 MWh | Jun 2006 | Dec 2025 | Natural Gas |
| Reventure Park | Clean Energy LLC | Charlotte, NC | Duke Energy Carolinas (DUK) | 26.7 GWh | Jun 2014 | Dec 2025 | Landfill Gas |
| Rockville Solar II, LLC | CleanCapital Holdings | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 912.0 MWh | Jul 2014 | Dec 2025 | Solar |
| Rockville Solar I LLC | CleanCapital Holdings | Indianapolis, IN | Midcontinent Independent System Operator, Inc. (MISO) | 1.7 GWh | Mar 2014 | Dec 2025 | Solar |
Summary of Power Plants By State
Figures are based on May 2026 generation numbers.| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Alabama | # 8 | 77 | 11,823.92 GWh |
| Alaska | # 48 | 140 | 513.29 GWh |
| Arizona | # 14 | 196 | 9,091.99 GWh |
| Arkansas | # 25 | 117 | 4,873.33 GWh |
| California | # 4 | 1,740 | 15,360.54 GWh |
| Colorado | # 31 | 308 | 4,156.36 GWh |
| Connecticut | # 35 | 173 | 3,391.33 GWh |
| Delaware | # 49 | 35 | 236.45 GWh |
| District of Columbia | # 51 | 17 | 14.46 GWh |
| Florida | # 2 | 342 | 25,093.89 GWh |
| Georgia | # 6 | 250 | 12,138.02 GWh |
| Hawaii | # 46 | 70 | 762.50 GWh |
| Idaho | # 41 | 151 | 1,963.84 GWh |
| Illinois | # 5 | 494 | 14,816.74 GWh |
| Indiana | # 15 | 222 | 7,662.28 GWh |
| Iowa | # 21 | 297 | 5,720.38 GWh |
| Kansas | # 24 | 188 | 5,118.39 GWh |
| Kentucky | # 23 | 61 | 5,471.28 GWh |
| Louisiana | # 13 | 90 | 9,131.60 GWh |
| Maine | # 44 | 242 | 1,130.78 GWh |
| Maryland | # 37 | 228 | 3,103.37 GWh |
| Massachusetts | # 45 | 666 | 1,073.93 GWh |
| Michigan | # 11 | 276 | 9,774.25 GWh |
| Minnesota | # 28 | 790 | 4,567.82 GWh |
| Mississippi | # 20 | 60 | 6,404.61 GWh |
| Missouri | # 22 | 129 | 5,701.36 GWh |
| State | Rank | Active Plants | May 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,053.07 GWh |
| Nebraska | # 36 | 126 | 3,193.89 GWh |
| Nevada | # 33 | 117 | 3,848.29 GWh |
| New Hampshire | # 43 | 57 | 1,198.65 GWh |
| New Jersey | # 30 | 398 | 4,274.91 GWh |
| New Mexico | # 29 | 158 | 4,513.39 GWh |
| New York | # 10 | 1,064 | 10,643.78 GWh |
| North Carolina | # 9 | 913 | 11,481.42 GWh |
| North Dakota | # 34 | 59 | 3,601.34 GWh |
| Ohio | # 7 | 211 | 11,886.21 GWh |
| Oklahoma | # 17 | 144 | 7,547.66 GWh |
| Oregon | # 27 | 281 | 4,575.23 GWh |
| Pennsylvania | # 3 | 258 | 18,234.28 GWh |
| Rhode Island | # 47 | 107 | 580.94 GWh |
| South Carolina | # 16 | 209 | 7,632.32 GWh |
| South Dakota | # 42 | 53 | 1,802.78 GWh |
| Tennessee | # 19 | 99 | 6,454.94 GWh |
| Texas | # 1 | 1,019 | 50,690.02 GWh |
| Utah | # 39 | 128 | 2,809.26 GWh |
| Vermont | # 50 | 118 | 186.37 GWh |
| Virginia | # 18 | 250 | 7,445.56 GWh |
| Washington | # 12 | 134 | 9,231.20 GWh |
| West Virginia | # 32 | 41 | 4,142.41 GWh |
| Wisconsin | # 26 | 266 | 4,582.07 GWh |
| Wyoming | # 38 | 69 | 2,983.81 GWh |