Rugby Wind Power Project
3212 74th Street NE, Barton, ND 58384Plant Summary Information
Rugby Wind Power Project is ranked #33 out of 59 power plants in North Dakota in terms of total annual net electricity generation.
Rugby Wind Power Project generated 97.2 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Rugby Wind Power Project |
|---|---|
| Utility Name | Avangrid Power LLC |
| Location | Pierce County, ND |
| Initial Operation Date | December 2009 |
| Last Update | Dec 2025 |
| Annual Generation | 348.1 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,834 out of 13,081 Power Plants Nationwide | |
| Ranked #544 out of 1,366 Wind Power Plants Nationwide | |
| Ranked #33 out of 59 North Dakota Power Plants | |
| Ranked #25 out of 42 North Dakota Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operators |
Iberdrola Renewables Inc (2013 to 2014) Avangrid Renewables Inc (2015 to 2015) Avangrid Renewables LLC (2016 to 2023) Avangrid Power LLC (2024 to 2025) |
Map of Rugby Wind Power Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Rugby Wind Power Project.
Monthly Net Generation for Rugby Wind Power Project
Monthly Plant Fuel Consumption for Rugby Wind Power Project
Rugby Wind Power Project Details
| Summary Information | |
|---|---|
| Plant Name | Rugby Wind Power Project (57097) |
| Plant Address | 3212 74th Street NE, Barton, ND 58384 |
| Utility | Avangrid Power LLC (15399) |
| Latitude, Longitude | 48.4968, -99.9513 |
| Generation Dates on File | Feb 2010 to Dec 2025 |
| Initial Operation Date | December 2009 |
| Annual Generation | 348.1 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG06-7-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Otter Tail Power Co (14232) ND |
| Grid Voltage | 39.00 kV |
| Energy Storage | No |
Generator 1 Details Operating December 2009
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 149 MW |
| Summer Capacity | 149 MW |
| Winter Capacity | 149 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2009 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 71 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 71 |
|---|---|
| Predominant Turbine Manufacturer | Suzlon |
| Predominant Turbine Model Number | S88-2100 |
| Design Wind Speed | 16.5 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 259 |
Rugby Wind Power Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #534 | Hopkins Ridge Wind | Dayton, WA | 352.9 GWh |
| #535 | Sweetwater Wind 2 LLC | Sweetwater, TX | 351.7 GWh |
| #536 | Lorenzo Wind | Lorenzo, TX | 351.1 GWh |
| #537 | Midland Wind | Kewane, IL | 350.9 GWh |
| #538 | Cameron Wind 1 LLC | Rio Hondo, TX | 348.2 GWh |
| #539 | Buffalo Gap 2 Wind Farm | Merkel, TX | 350.4 GWh |
| #540 | Lindahl Wind Project, LLC | Tioga, ND | 350.1 GWh |
| #541 | Trimont Area Wind Farm | Trimont, MN | 349.7 GWh |
| #542 | Majestic 1 Wind Farm | Panhandle, TX | 349.7 GWh |
| #543 | Palmas Wind, LLC | Rio Hondo, TX | 349.6 GWh |
| #545 | Spinning Spur Wind LLC | Vegas, TX | 347.0 GWh |
| #546 | Meadow Lake Wind Farm V LLC | Chalmers, IN | 346.2 GWh |
| #547 | Duran Mesa LLC | Duran, NM | 345.3 GWh |
| #548 | Voyager Wind I | Mojave, CA | 343.4 GWh |
| #549 | Northern Wind | Lake Wilson, MN | 343.3 GWh |
| #550 | Tyler Bluff Wind Project, LLC | Muenster, TX | 343.1 GWh |
| #551 | Campbell County Wind Farm | Pollock, SD | 342.9 GWh |
| #552 | Benton County Wind Farm | Earl Park, IN | 342.9 GWh |
| #553 | Garden Wind LLC | Zearing, IA | 342.8 GWh |
| #554 | High Plains | Rock River, WY | 341.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Rugby Wind Power Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Antelope Valley | Beulah, ND | 5.8 TWh | 116.9 mi |
| Baldwin Wind LLC | Wilton, ND | 384.1 GWh | 101.8 mi |
| Border Winds Wind Farm | Rolla, ND | 513.1 GWh | 35.8 mi |
| Coal Creek | Underwood, ND | 8.0 TWh | 95.4 mi |
| Courtenay Wind Farm | Courtenay, ND | 128.3 GWh | 110.6 mi |
| FPL Energy Burleigh County Wind | Wilton, ND | 180.2 GWh | 102 mi |
| FPL Energy Oliver Wind I LLC | Center, ND | 181.6 GWh | 109.4 mi |
| FPL Energy Oliver Wind II LLC | Center, ND | 189.5 GWh | 109.4 mi |
| Garrison | Riverside, ND | 2.0 TWh | 96.7 mi |
| Langdon Renewables, LLC | Langdon, ND | 489.3 GWh | 75.4 mi |
| Langdon Wind Energy Center | Langdon, ND | 172.7 GWh | 75.3 mi |
| Langdon Wind II LLC | Osnabrock, ND | 174.8 GWh | 75.3 mi |
| Leland Olds | Stanton, ND | 2.9 TWh | 105.3 mi |
| Milton R Young | Center, ND | 3.9 TWh | 114.9 mi |
| Minot Wind Project | Minot, ND | 18.2 GWh | 69.4 mi |
| New Frontier Wind | Ruso, ND | 368.6 GWh | 63.5 mi |
| Oliver Wind III, LLC | Mandan, ND | 365.7 GWh | 120.5 mi |
| Prairie Winds ND1 | Minot, ND | 353.8 GWh | 72.1 mi |
| Velva Windfarm LLC | Velva, ND | 20.2 GWh | 53 mi |
| Wilton Wind II LLC | Wilton, ND | 201.1 GWh | 100.4 mi |