Robert P Mone Plant
4406 Mentzer Rd., Convoy, OH 45832Plant Summary Information
Robert P Mone Plant is ranked #42 out of 192 power plants in Ohio in terms of total annual net electricity generation.
Robert P Mone Plant is comprised of 3 generators and generated 71.0 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Robert P Mone Plant |
---|---|
Utility Name | Buckeye Power, Inc |
Location | Van Wert County, OH |
Initial Operation Date | July 2002 |
Last Update | Dec 2024 |
Annual Generation | 310.3 GWh |
Annual Consumption | 3.7 M MMBtu |
Ranked #1,868 out of 12,299 Power Plants Nationwide | |
Ranked #649 out of 2,221 Natural Gas Power Plants Nationwide | |
Ranked #42 out of 192 Ohio Power Plants | |
Ranked #21 out of 53 Ohio Natural Gas Power Plants | |
Fuel Types | Natural Gas : 99.5% |
Previous Operator |
National Power Coop Inc (2013 to 2021) Buckeye Power, Inc (2022 to 2024) |
Map of Robert P Mone Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Robert P Mone Plant.
Monthly Net Generation for Robert P Mone Plant
Robert P Mone Plant Details
Summary Information | |
---|---|
Plant Name | Robert P Mone Plant (7872) |
Plant Address | 4406 Mentzer Rd., Convoy, OH 45832 |
Utility | Buckeye Power, Inc (7004) |
Latitude, Longitude | 40.9297, -84.7392 |
Generation Dates on File | Jan 2003 to Dec 2024 |
Initial Operation Date | July 2002 |
Annual Generation | 310.3 GWh |
Fuel Types | Natural Gas : 99.5% |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | RFC |
Balancing Authority | PJM Interconnection, LLC (PJM) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Ohio Power Co (14006) OH |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | ANR PIPELINE COMPANY |
Natural Gas Storage | No |
Generator 1 Details Operating July 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 32419345 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 32419345 |
Nameplate Capacity | 198.9 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 147 MW |
Winter Capacity | 180 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 148.2 MW |
Net Winter Capacity With Natural Gas | 188 MW |
Net Summer Capacity With Oil | 160.1 MW |
Net Winter Capacity With Oil | 196.4 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 2 Details Operating July 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 32419347 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 32419347 |
Nameplate Capacity | 198.9 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 147 MW |
Winter Capacity | 180 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 148.2 MW |
Net Winter Capacity With Natural Gas | 188 MW |
Net Summer Capacity With Oil | 160.1 MW |
Net Winter Capacity With Oil | 196.4 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Generator 3 Details Operating July 2002
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
RTO ISO LMP Node Designation | 32419349 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | 32419349 |
Nameplate Capacity | 198.9 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 147 MW |
Winter Capacity | 180 MW |
Minimum Load | 100 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2002 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas / Distillate Fuel Oil |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | Yes |
Cofire Fuels | No |
Switch Between Oil And Natural Gas | Yes |
Multifuel Details | |
Switch When Operating | Yes |
---|---|
Net Summer Capacity With Natural Gas | 148.2 MW |
Net Winter Capacity With Natural Gas | 188 MW |
Net Summer Capacity With Oil | 160.1 MW |
Net Winter Capacity With Oil | 196.4 MW |
Time To Switch From Gas To Oil | 1H |
Time To Switch From Oil To Gas | 1H |
Factors That Limit Switching | Yes |
Storage Limits | Yes |
Air Permit Limits | Yes |
Robert P Mone Plant Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#639 | Washington Parish Energy Center | Bogalusa, LA | 316.0 GWh |
#640 | Blue Lake | Shakopee, MN | 317.7 GWh |
#641 | Edge Moor | Wilmington, DE | 327.6 GWh |
#642 | Walton County Energy Facility | Monroe, GA | 313.8 GWh |
#643 | Calhoun Energy Center | Eastaboga, AL | 319.3 GWh |
#644 | Georgia-Pacific Muskogee | Muskogee, OK | 380.6 GWh |
#645 | Exira | Brayton, IA | 313.7 GWh |
#646 | Sentinel Energy Center, LLC | Desert Hot Springs, CA | 311.2 GWh |
#647 | Combined Locks Energy Center | Combined Locks, WI | 310.4 GWh |
#648 | Stony Brook Cogen Plant | Stony Brook, NY | 309.3 GWh |
#650 | World Generation X | North Tonawanda, NY | 307.8 GWh |
#651 | Intercession City | Intercession City, FL | 327.6 GWh |
#652 | Port Jefferson | Port Jefferson, NY | 324.9 GWh |
#653 | Primient Decatur Plant Cogen | Decatur, IL | 300.7 GWh |
#654 | Lake Catherine | Jones Mill, AR | 299.6 GWh |
#655 | Flint Hills Resources Pine Bend, LLC | Rosemount, MN | 299.0 GWh |
#656 | Sylvarena | Raleigh, MS | 294.3 GWh |
#657 | Archer Daniels Midland Cedar Rapids | Cedar Rapids, IA | 1.0 TWh |
#658 | THUMS | Long Beach, CA | 285.9 GWh |
#659 | Big Sandy Peaker Plant | Kenona, WV | 285.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Robert P Mone Plant.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Auburn Renewables LLC | Garrett, IN | 9.5 GWh | 33.9 mi |
Auglaize Hydro | Bryan, OH | 6.5 GWh | 27.6 mi |
Blue Creek Wind Project | Paulding, OH | 798.0 GWh | 9.3 mi |
Blue Harvest Solar Park | Continental, OH | 105.4 GWh | 26.7 mi |
Bunge North America East LLC | Decatur, IN | 10.2 GWh | 11.7 mi |
Celina Solar Project #1, LLC | Celina, OH | 6.5 GWh | 28 mi |
Cooper Farms VW Project | Van Wert, OH | 12.8 GWh | 9 mi |
Edgerton | Edgerton, OH | 212.0 MWh | 36 mi |
Haviland Plastic Products | Haviland, OH | 12.9 GWh | 9.9 mi |
LafargeHolcim - Paulding Wind Project | Paulding, OH | 5.7 GWh | 19.3 mi |
Montpelier Electric Generating Station | Poneto, IN | 69.6 GWh | 36.5 mi |
Northwest Ohio Wind | Haviland, OH | 277.1 GWh | 9.7 mi |
Paulding Wind Farm II | Payne, OH | 314.9 GWh | 6.9 mi |
Paulding Wind Farm III | Payne, OH | 310.8 GWh | 13.2 mi |
Powell Creek Solar | Miller City, OH | 6.4 GWh | 34.4 mi |
Richland | Defiance, OH | 327.3 GWh | 33.4 mi |
St Marys | St. Marys, OH | 350.0 MWh | 32.2 mi |
Timber Road IV | Payne, OH | 394.5 GWh | 13.2 mi |
Timber Road Solar Park | Payne, OH | 104.0 GWh | 11.3 mi |
Whirlpool Corporation - Ottawa Wind Farm | Ottawa, OH | 1.9 GWh | 37.1 mi |