Riverside Holyoke
30 Water Street, Holyoke, MA 1040Plant Summary Information
Riverside Holyoke is ranked #33 out of 609 power plants in Massachusetts in terms of total annual net electricity generation.
Riverside Holyoke is comprised of 4 generators and generated 8.4 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Riverside Holyoke |
---|---|
Utility Name | City of Holyoke Gas and Electric Dept. |
Location | Hampden County, MA |
Initial Operation Date | January 1906 |
Last Update | Dec 2024 |
Annual Generation | 38.4 GWh |
Annual Consumption | 142.5 k MMBtu |
Ranked #4,353 out of 12,312 Power Plants Nationwide | |
Ranked #553 out of 1,323 Water Power Plants Nationwide | |
Ranked #33 out of 609 Massachusetts Power Plants | |
Ranked #5 out of 28 Massachusetts Water Power Plants | |
Fuel Types | Water |
Map of Riverside Holyoke
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Riverside Holyoke.
Monthly Net Generation for Riverside Holyoke
Riverside Holyoke Details
Summary Information | |
---|---|
Plant Name | Riverside Holyoke (1607) |
Plant Address | 30 Water Street, Holyoke, MA 1040 |
Utility | City of Holyoke Gas and Electric Dept. (8776) |
Latitude, Longitude | 42.20059, -72.59443 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | January 1906 |
Annual Generation | 38.4 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | NPCC |
Balancing Authority | ISO New England Inc. (ISNE) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Connecticut River |
Ash Impoundment | No |
Transmission / Distribution Owner | City of Holyoke - (MA) (8774) MA |
Grid Voltage | 13.80 kV |
Energy Storage | No |
Generator 4 Details Operating January 1906
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.8 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.8 MW |
Winter Capacity | 0.8 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1906 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 5 Details Operating January 1906
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 0.6 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 0.6 MW |
Winter Capacity | 0.6 MW |
Minimum Load | 0.4 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1906 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 7 Details Operating January 1922
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 1.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 1.5 MW |
Winter Capacity | 1.5 MW |
Minimum Load | 0.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1922 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 8 Details Operating January 1931
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 4 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 4 MW |
Winter Capacity | 4 MW |
Minimum Load | 2.7 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | January 1931 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 10M |
Riverside Holyoke Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#543 | Beaver Falls | Ketchikan, AK | 40.3 GWh |
#544 | Hiram | Hiram, ME | 40.2 GWh |
#545 | Ayers Island | Bristol, NH | 40.1 GWh |
#546 | Bishop Creek 4 | Bishop, CA | 40.1 GWh |
#547 | Port Edwards Mill | Port Edwards, WI | 39.9 GWh |
#548 | Bridgewater | Morganton, NC | 39.9 GWh |
#549 | Hodenpyl | Mesick, MI | 39.6 GWh |
#550 | Foothill | Sylmar, CA | 39.6 GWh |
#551 | Lower No 1 | Idaho Falls, ID | 38.9 GWh |
#552 | Rollins | Colfax, CA | 38.6 GWh |
#554 | Essex Junction 19 | Essex Junction, VT | 38.6 GWh |
#555 | Soft Maple | Croghan, NY | 38.4 GWh |
#556 | Cooper Lake | Cooper Landing, AK | 38.1 GWh |
#557 | Moshier | Lowville, NY | 38.1 GWh |
#558 | Green Springs | Columbia Falls, OR | 37.7 GWh |
#559 | Cascade Dam | Cascade, ID | 37.4 GWh |
#560 | Green Island Hydroelectric Station | Green Island, NY | 37.4 GWh |
#561 | Tims Ford | Winchester, TN | 37.3 GWh |
#562 | Milford Hydro Station | Milford, ME | 37.2 GWh |
#563 | Higley | Colton, NY | 37.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Riverside Holyoke.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Ameresco Chicopee Energy | Chicopee, MA | 9.5 GWh | 4 mi |
Boatlock | Holyoke, MA | 18.9 GWh | 0.7 mi |
Cabot Holyoke | Holyoke, MA | 4.4 GWh | 0.8 mi |
CED Chicopee Solar | Chicopee, MA | 4.8 GWh | 2.2 mi |
Chemical | Holyoke, MA | 5.5 GWh | 1 mi |
Chicopee | Chicopee, MA | 2.6 GWh | 4.5 mi |
Chicopee Granby Road Solar | Chicopee, MA | 2.2 GWh | 2.9 mi |
Chicopee River Solar | Springfield, MA | 3.1 GWh | 4.1 mi |
Chicopee Solar | Chicopee, MA | 4.6 GWh | 1.2 mi |
Dwight | Chicopee, MA | 6.3 GWh | 3.6 mi |
Front Street | Chicopee, MA | 497.0 MWh | 3.6 mi |
Granby LFG | Granby, MA | 3.1 GWh | 3 mi |
Granby Solar, LLC CSG | Granby, MA | 6.1 GWh | 4.1 mi |
Hadley Falls | Holyoke, MA | 151.1 GWh | 0.9 mi |
Holyoke Solar Cooperative at Mueller | Holyoke, MA | 3.8 GWh | 4.6 mi |
Kearsarge Granby | Granby, MA | 3.6 GWh | 4.7 mi |
Ludlow Landfill | Ludlow, MA | 3.4 GWh | 4.6 mi |
Masspower | Indian Orchard, MA | 609.1 GWh | 4.7 mi |
Mt. Tom Solar Project Hybrid | Holyoke, MA | 5.3 GWh | 4.7 mi |
Stony Brook | Ludlow, MA | 78.2 GWh | 4.3 mi |