Whitney
285 County Road 3602, Clifton, TX 76634Plant Summary Information
Whitney is ranked #4 out of 14 hydroelectric power plants in Texas in terms of total annual net electricity generation.
Whitney is comprised of 2 generators and generated 2.5 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Whitney |
---|---|
Utility Name | USACE-Fort Worth District |
Location | Bosque County, TX |
Initial Operation Date | June 1953 |
Last Update | Dec 2024 |
Annual Generation | 69.4 GWh |
Annual Consumption | 237.1 k MMBtu |
Ranked #3,687 out of 12,312 Power Plants Nationwide | |
Ranked #425 out of 1,323 Water Power Plants Nationwide | |
Ranked #497 out of 796 Texas Power Plants | |
Ranked #4 out of 14 Texas Water Power Plants | |
Fuel Types | Water |
Map of Whitney
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Whitney.
Monthly Net Generation for Whitney
Whitney Details
Summary Information | |
---|---|
Plant Name | Whitney (6414) |
Plant Address | 285 County Road 3602, Clifton, TX 76634 |
Utility | USACE-Fort Worth District (19449) |
Latitude, Longitude | 31.8694, -97.3667 |
Generation Dates on File | Jan 2002 to Dec 2024 |
Initial Operation Date | June 1953 |
Annual Generation | 69.4 GWh |
Fuel Types | Water |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Brazos River |
Ash Impoundment | No |
Transmission / Distribution Owner | Brazos Electric Power Coop Inc (2172) |
Grid Voltage | 69.00 kV |
Energy Storage | No |
Generator 1 Details Operating June 1953
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 20.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 21 MW |
Winter Capacity | 21 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1953 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Generator 2 Details Operating June 1953
Technology | Conventional Hydroelectric |
---|---|
Prime Mover | Hydroelectric Turbine |
Ownership | Single Owner |
Nameplate Capacity | 20.9 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 21 MW |
Winter Capacity | 21 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 1953 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Water |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Time From Cold Shutdown To Full Load | 10M |
Whitney Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Water.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#415 | William F Matson Generating Station | Huntingdon, PA | 72.7 GWh |
#416 | Tallulah Falls | Tallulah Falls, GA | 72.0 GWh |
#417 | Navajo Dam | Farmington, NM | 72.0 GWh |
#418 | Hardy | Newaygo, MI | 71.6 GWh |
#419 | Shoshone Falls | Twin Falls, ID | 71.3 GWh |
#420 | Allegheny Hydro No 8 | Adrian, PA | 70.6 GWh |
#421 | Copco 1 | Hornbrook, CA | 70.4 GWh |
#422 | Boysen | Thermopolis, WY | 70.3 GWh |
#423 | Lockhart | Lockhart, SC | 70.0 GWh |
#424 | Rhodhiss | Rhodhiss, NC | 69.8 GWh |
#426 | Johnson 2 | Lexington, NE | 69.3 GWh |
#427 | Ocoee 1 | Benton, TN | 69.2 GWh |
#428 | Prospect | Prospect, NY | 69.1 GWh |
#429 | Post Falls | Post Falls, ID | 69.1 GWh |
#430 | Sheldon Springs Hydroelectric | Sheldon Springs, VT | 67.8 GWh |
#431 | Marmet | Marmet, WV | 67.4 GWh |
#432 | Keowee | Seneca, SC | 67.0 GWh |
#433 | Cougar | Lowell, OR | 66.9 GWh |
#434 | Lloyd Shoals | Jackson, GA | 66.6 GWh |
#435 | Kelly Ridge | Oroville, CA | 66.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Whitney.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
AbbVie Waco | Waco, TX | 811.0 MWh | 28.1 mi |
BPL Files Solar | Itasca, TX | 272.8 GWh | 27.8 mi |
Comanche Peak | Glen Rose, TX | 19.1 TWh | 38.5 mi |
Dileo Solar | Clifton, TX | 157.8 GWh | 10.4 mi |
Griffin Solar | Robinson, TX | 9.2 GWh | 30.4 mi |
Hubbard Wind | Mt Calm, TX | 976.6 GWh | 32.3 mi |
Johnson County | Cleburne, TX | 1.1 TWh | 36.7 mi |
Markum Solar Farm | Valley Mills, TX | 178.8 GWh | 12.1 mi |
Pitts Dudik Solar | Hubbard, TX | 109.0 GWh | 28.9 mi |
Prairie Hill Wind Project | Mart, TX | 154.3 GWh | 35 mi |
Sandy Creek Energy Station | Riesel, TX | 3.2 TWh | 36.4 mi |
Sun Valley Solar Project | Abbott, TX | 560.2 GWh | 20.6 mi |
Sun Valley Storage | Abbot, TX | 3.1 GWh | 20.5 mi |
Thad Hill Energy Center | Clifton, TX | 4.3 TWh | 0.8 mi |
TPE Whitney Solar, LLC | Kopperl, TX | 16.3 GWh | 12.5 mi |
Waco Solar | Mt Calm, TX | 966.4 GWh | 34 mi |
Walnut Springs Solar | Walnut Springs, TX | 8.4 GWh | 27.6 mi |
Wolf Hollow I LP | Granbury, TX | 3.2 TWh | 38.6 mi |
Wolf Hollow II | Granbury, TX | 6.3 TWh | 38.9 mi |
Yellow Jacket | Meridian, TX | 10.0 GWh | 17.4 mi |