Limestone Wind Project

TBD, Coolidge, TX 76635

Plant Summary Information

Limestone Wind Project is ranked #27 out of 231 wind farms in Texas in terms of total annual net electricity generation.

Limestone Wind Project generated 226.4 GWh during the 3-month period between May 2026 to August 2026.

Plant NameLimestone Wind Project
Utility NameLimestone Wind Project, LLC
LocationNavarro County, TX
Initial Operation DateDecember 2022
Last Update Aug 2026
Annual Generation 1.1 TWh
Annual Consumption 3.8 M MMBtu
Ranked #727 out of 13,301 Power Plants Nationwide
Ranked #61 out of 1,377 Wind Power Plants Nationwide
Ranked #124 out of 861 Texas Power Plants
Ranked #27 out of 231 Texas Wind Power Plants
Fuel Types Wind

Map of Limestone Wind Project

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Limestone Wind Project.

Create Your Account Today

Monthly Net Generation for Limestone Wind Project

Monthly Plant Fuel Consumption for Limestone Wind Project

Limestone Wind Project Details

Summary Information
Plant NameLimestone Wind Project (65306)
Plant AddressTBD, Coolidge, TX 76635
UtilityLimestone Wind Project, LLC (64611)
Latitude, Longitude31.85346, -96.62446
Generation Dates on FileDec 2022 to Aug 2026
Initial Operation DateDecember 2022
Annual Generation 1.1 TWh
Fuel Types Wind
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionTRE
Balancing AuthorityElectric Reliability Council of Texas, Inc. (ERCO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerOncor Electric Delivery Company LLC (44372) TX
Grid Voltage 345.00 kV
Energy StorageNo

Generator LIMEW Details Operating December 2022

TechnologyOnshore Wind Turbine
Prime MoverWind Turbine, Onshore
OwnershipSingle Owner
Nameplate Capacity299.2 MW
Nameplate Power Factor0.95
Summer Capacity299.2 MW
Winter Capacity299.2 MW
Minimum Load1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateDecember 2022
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceWind
Turbines/Hydrokinetic Buoys88
Turbine Details
Number Of Turbines88
Predominant Turbine ManufacturerGE
Predominant Turbine Model Number3.8-137
Design Wind Speed16.8 MPH
Wind Quality Class3 - Low Wind
Turbine Hub Height Feet384

Limestone Wind Project Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Wind.

RankPlant NamePlant LocationAnnual Generation
#51El Cabo WindEncino, NM1.1 TWh
#52Canyon Wind Project, LLCScurry, TX1.1 TWh
#53Western Plains Wind FarmSpearville, KS1.1 TWh
#54Bronco Plains Wind, LLCFlagler, CO1.1 TWh
#55South Plains IILockney, TX1.1 TWh
#56TG EastTruscott, TX1.1 TWh
#57Ida Grove WindIda Grove, IA1.1 TWh
#58Upland PrairieSpencer, IA1.1 TWh
#59Torrecillas Wind Energy, LLCBruni, TX1.1 TWh
#60Thunderhead Wind Energy LLCBoone, NE1.1 TWh
#62Deuel Harvest Wind Energy LLCClear Lake, SD1.1 TWh
#63Soldier Creek WindCorning, KS1.0 TWh
#64Priddy Wind ProjectGoldthwaite, TX1.0 TWh
#65Thunder Ranch Wind ProjectMarland, OK1.0 TWh
#66Rock Creek Wind ProjectTarkio, MO1.0 TWh
#67Skeleton Creek Energy Center HybridCarrier, OK1.5 TWh
#68Triple H Wind ProjectHighmore, SD1.0 TWh
#69Lincoln Land WindTBD, IL1.0 TWh
#70Dakota Range WindMarvin, SD1.0 TWh
#71Caddo WindApache, OK1.0 TWh

Nearby Power Plants

Below are closest 20 power plants surrounding Limestone Wind Project.

Plant NamePlant LocationAnnual GenerationDistance
Ash Creek SolarAbbott, TX822.0 GWh24.2 mi
Briar Creek Solar 1Corsicana, TX232.4 GWh15 mi
Copperhead Solar, LLCRiesel, TX262.6 GWh31.1 mi
Elm Branch Solar 1Ennis, TX251.7 GWh26.6 mi
Fairfield Solar ProjectFairfield, TX14.4 GWh27.5 mi
Fence Post Solar Hybrid Project, LLCCorsicana, TX526.4 GWh27.9 mi
Freestone Energy CenterFairfield, TX6.0 TWh30.1 mi
Hubbard WindMt Calm, TX863.3 GWh13.1 mi
Hubbard Wind IIMalone, TX58.3 GWh18.9 mi
Pin Oak Creek Energy Center, LLCFairfield, TX376.9 GWh30.3 mi
Pisgah Ridge Solar, LLCRichland, TX417.8 GWh9.7 mi
Pitts Dudik SolarHubbard, TX101.9 GWh15 mi
Pitts Dudik Solar IIHubbard, TX33.5 GWh15.2 mi
PP Jaguar BESS LLCAxtell, TX11.0 MWh26.8 mi
Prairie Hill Wind ProjectMart, TX94.0 GWh26.6 mi
Roseland Solar Project, LLCRiesel, TX1.1 TWh29.6 mi
Sun Valley Solar ProjectAbbott, TX584.9 GWh22.9 mi
True North Solar, LLCOtto, TX578.6 GWh28.4 mi
Waco SolarMt Calm, TX839.8 GWh15.1 mi
WAL565Corsicana, TX311.0 MWh21.4 mi