Appaloosa Solar I
7956 North Lund Hwy, Cedar City, UT 84721Plant Summary Information
Appaloosa Solar I is ranked #48 out of 121 power plants in Utah in terms of total annual net electricity generation.
Appaloosa Solar I generated 11.4 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Appaloosa Solar I |
|---|---|
| Utility Name | Greenbacker Renewable Energy Corporation |
| Location | Iron County, UT |
| Initial Operation Date | January 2024 |
| Last Update | Mar 2026 |
| Annual Generation | 103.1 GWh |
| Annual Consumption | 368.7 k MMBtu |
| Ranked #3,406 out of 12,332 Power Plants Nationwide | |
| Ranked #837 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #48 out of 121 Utah Power Plants | |
| Ranked #28 out of 56 Utah Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Appaloosa Solar I, LLC (2021 to 2021) Greenbacker Renewable Energy Corporation (2022 to 2024) |
Map of Appaloosa Solar I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Appaloosa Solar I.
Monthly Net Generation for Appaloosa Solar I
Monthly Plant Fuel Consumption for Appaloosa Solar I
Appaloosa Solar I Details
| Summary Information | |
|---|---|
| Plant Name | Appaloosa Solar I (65678) |
| Plant Address | 7956 North Lund Hwy, Cedar City, UT 84721 |
| Utility | Greenbacker Renewable Energy Corporation (60025) |
| Latitude, Longitude | 37.84016, -113.1359 |
| Generation Dates on File | Jan 2024 to Mar 2026 |
| Initial Operation Date | January 2024 |
| Annual Generation | 103.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | PacifiCorp (14354) UT |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator AS1A Details Operating January 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 120 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 119 MW |
| Winter Capacity | 119 MW |
| Minimum Load | 128.4 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 120 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator AS1B Details Operating January 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 80 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 79 MW |
| Winter Capacity | 79 MW |
| Minimum Load | 88.4 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | January 2024 |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 80 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Appaloosa Solar I Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #827 | Lick Creek Solar, LLC | Walnut Cove, NC | 106.4 GWh |
| #828 | Techren Solar V | Boulder, NV | 106.0 GWh |
| #829 | Kimmel Road Solar, LLC | Du Quoin, IL | 105.5 GWh |
| #830 | Elevation Solar C | Lancaster, CA | 105.3 GWh |
| #831 | Forgeview Solar | Blytheville, AR | 104.8 GWh |
| #832 | Edwards Sanborn S1 | Mojave, CA | 102.4 GWh |
| #833 | Morrow Lake Solar | Pearsall, TX | 104.3 GWh |
| #834 | Foothills Solar Plant Hybrid | Yuma, AZ | 97.8 GWh |
| #835 | Broad River Solar, LLC | Mooresboro, NC | 103.8 GWh |
| #836 | SR Turkey Creek, LLC | Lancaster, KY | 103.5 GWh |
| #838 | Salt City Solar Project - Hybrid | Circleville, OH | 103.1 GWh |
| #839 | Optimist | West Point, MS | 101.0 GWh |
| #840 | Coldwater River Solar | Coldwater, MI | 102.8 GWh |
| #841 | Grimes County Solar | Lola, TX | 102.7 GWh |
| #842 | Luning Energy | Luning, NV | 102.1 GWh |
| #843 | Bladen Solar | Fayetteville, NC | 101.8 GWh |
| #844 | Pitts Dudik Solar | Hubbard, TX | 101.5 GWh |
| #845 | Red Horse 2 | Willcox, AZ | 145.9 GWh |
| #846 | AES Maui Kuihelani Solar Hybrid | Waikapu, HI | 99.3 GWh |
| #847 | Red Rock | Red Rock, AZ | 96.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Appaloosa Solar I.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Beryl Solar Plant | Beryl, UT | 6.3 GWh | 31.1 mi |
| Buckhorn Solar Plant | Paragonah, UT | 5.9 GWh | 25.4 mi |
| Cedar Valley Solar Plant | Cedar City, UT | 6.0 GWh | 3.4 mi |
| Cove Mountain Solar | Beryl, UT | 160.4 GWh | 30.4 mi |
| Cove Mountain Solar 2 | Beryl, UT | 326.6 GWh | 30.7 mi |
| Enterprise Solar, LLC | Newcastle, UT | 228.8 GWh | 29.4 mi |
| Fiddler's Canyon #1 | Cedar City, UT | 7.3 GWh | 8.9 mi |
| Fiddler's Canyon #2 | Cedar City, UT | 7.4 GWh | 8.7 mi |
| Fiddler's Canyon 3 | Cedar City, UT | 7.5 GWh | 8.7 mi |
| Granite Mountain Solar East, LLC | Cedar City, UT | 207.1 GWh | 6.7 mi |
| Granite Mountain Solar West, LLC | Cedar City, UT | 129.4 GWh | 10.5 mi |
| Iron Springs Solar, LLC | Cedar City, UT | 214.5 GWh | 8.3 mi |
| Laho Solar Plant | Milford, UT | 6.2 GWh | 31.7 mi |
| Quichapa 1 | Cedar City, UT | 6.6 GWh | 13.3 mi |
| Quichapa 2 | Cedar City, UT | 5.8 GWh | 12.3 mi |
| Quichapa 3 | Cedar City, UT | 7.0 GWh | 14.3 mi |
| Smithfield 3 | Milford, UT | 5.5 GWh | 26.6 mi |
| Thermo No 1 | Milford, UT | 57.7 GWh | 22.4 mi |
| Three Peaks Power | Cedar City, UT | 225.7 GWh | 0.9 mi |
| Utah Red Hills Renewable Energy Park | Parowan, UT | 208.6 GWh | 13 mi |