Three Peaks Power
7856 N. Lund Highway, Cedar City, UT 84721Plant Summary Information
Three Peaks Power is ranked #17 out of 123 power plants in Utah in terms of total annual net electricity generation.
Three Peaks Power generated 61.6 GWh during the 3-month period between July 2025 to October 2025.
| Plant Name | Three Peaks Power |
|---|---|
| Utility Name | Onward Energy |
| Location | Iron County, UT |
| Initial Operation Date | December 2016 |
| Last Update | Oct 2025 |
| Annual Generation | 227.1 GWh |
| Annual Consumption | 833.8 k MMBtu |
| Ranked #2,321 out of 12,553 Power Plants Nationwide | |
| Ranked #363 out of 6,410 Solar Power Plants Nationwide | |
| Ranked #17 out of 123 Utah Power Plants | |
| Ranked #4 out of 55 Utah Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Three Peaks Power LLC (2015 to 2023) Onward Energy (2024 to 2024) |
Map of Three Peaks Power
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Three Peaks Power.
Monthly Net Generation for Three Peaks Power
Three Peaks Power Details
| Summary Information | |
|---|---|
| Plant Name | Three Peaks Power (60432) |
| Plant Address | 7856 N. Lund Highway, Cedar City, UT 84721 |
| Utility | Onward Energy (60453) |
| Latitude, Longitude | 37.82708, -113.13708 |
| Generation Dates on File | Dec 2016 to Oct 2025 |
| Initial Operation Date | December 2016 |
| Annual Generation | 227.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 15-959-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | PacifiCorp (14354) UT |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator TPP Details Operating December 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 80 MW |
| Summer Capacity | 80 MW |
| Winter Capacity | 80 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2016 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 107.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Three Peaks Power Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| CRE-Three Peaks Utah LLC | P.O. Box 2576, Boise, ID 83701 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #353 | Wagyu | Damon, TX | 233.6 GWh |
| #354 | Ragsdale Solar LLC | Canton, MS | 233.4 GWh |
| #355 | Quartz Solar, LLC | Wynne, AR | 232.4 GWh |
| #356 | SR Lumpkin | Lumpkin, GA | 231.7 GWh |
| #357 | San Pablo Raceway | Lancaster, CA | 231.4 GWh |
| #358 | Bayou Galion Solar Project | Mer Rouge, LA | 230.3 GWh |
| #359 | Dressor Plains Solar, LLC | Herrick, IL | 230.0 GWh |
| #360 | Comanche Solar | Pueblo, CO | 229.3 GWh |
| #361 | BPL Files Solar | Itasca, TX | 228.8 GWh |
| #362 | Prairie Mist Solar | Montrose, AR | 228.0 GWh |
| #364 | Ivanpah 3 | Nipton, CA | 235.6 GWh |
| #365 | Alamo 6 | Fort Stockton, TX | 226.6 GWh |
| #366 | Albemarle Beach Solar | Roper, NC | 226.1 GWh |
| #367 | SR Arlington II | Blakely, GA | 226.1 GWh |
| #368 | Assembly Solar II LLC | Lennon, MI | 223.7 GWh |
| #369 | Techren Solar I LLC | Boulder, NV | 223.7 GWh |
| #370 | Lapetus | Andrews, TX | 223.6 GWh |
| #371 | Lamesa Solar | Lamesa, TX | 223.4 GWh |
| #372 | SR Clay, LLC | Fort Gaines, GA | 222.7 GWh |
| #373 | Prairie State Solar Project | Swanwick Township, IL | 222.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Three Peaks Power.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Appaloosa Solar I | Cedar City, UT | 128.5 GWh | 0.9 mi |
| Beryl Solar Plant | Beryl, UT | 6.3 GWh | 30.7 mi |
| Blue Mountain Biogas | Milford, UT | 12.0 MWh | 25.5 mi |
| Buckhorn Solar Plant | Paragonah, UT | 5.9 GWh | 25.9 mi |
| Cedar Valley Solar Plant | Cedar City, UT | 6.0 GWh | 2.9 mi |
| Cove Mountain Solar | Beryl, UT | 159.5 GWh | 29.9 mi |
| Cove Mountain Solar 2 | Beryl, UT | 321.7 GWh | 30.3 mi |
| Enterprise Solar, LLC | Newcastle, UT | 221.3 GWh | 29 mi |
| Fiddler's Canyon #1 | Cedar City, UT | 7.3 GWh | 8.3 mi |
| Fiddler's Canyon #2 | Cedar City, UT | 7.4 GWh | 8.3 mi |
| Fiddler's Canyon 3 | Cedar City, UT | 7.5 GWh | 7.9 mi |
| Granite Mountain Solar East, LLC | Cedar City, UT | 204.6 GWh | 6.1 mi |
| Granite Mountain Solar West, LLC | Cedar City, UT | 126.0 GWh | 10.3 mi |
| Iron Springs Solar, LLC | Cedar City, UT | 215.0 GWh | 7.4 mi |
| Quichapa 1 | Cedar City, UT | 6.6 GWh | 12.5 mi |
| Quichapa 2 | Cedar City, UT | 5.8 GWh | 11.4 mi |
| Quichapa 3 | Cedar City, UT | 7.0 GWh | 13.4 mi |
| Smithfield 3 | Milford, UT | 5.5 GWh | 27.5 mi |
| Thermo No 1 | Milford, UT | 57.7 GWh | 23.3 mi |
| Utah Red Hills Renewable Energy Park | Parowan, UT | 208.6 GWh | 13.3 mi |