Three Peaks Power
7856 N. Lund Highway, Cedar City, UT 84721Plant Summary Information
Three Peaks Power is ranked #20 out of 120 power plants in Utah in terms of total annual net electricity generation.
Three Peaks Power generated 66.6 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Three Peaks Power |
|---|---|
| Utility Name | Onward Energy |
| Location | Iron County, UT |
| Initial Operation Date | December 2016 |
| Last Update | May 2026 |
| Annual Generation | 228.7 GWh |
| Annual Consumption | 861.2 k MMBtu |
| Ranked #2,374 out of 13,081 Power Plants Nationwide | |
| Ranked #408 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #20 out of 120 Utah Power Plants | |
| Ranked #8 out of 56 Utah Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Three Peaks Power LLC (2015 to 2023) Onward Energy (2024 to 2025) |
Map of Three Peaks Power
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Three Peaks Power.
Monthly Net Generation for Three Peaks Power
Monthly Plant Fuel Consumption for Three Peaks Power
Three Peaks Power Details
| Summary Information | |
|---|---|
| Plant Name | Three Peaks Power (60432) |
| Plant Address | 7856 N. Lund Highway, Cedar City, UT 84721 |
| Utility | Onward Energy (60453) |
| Latitude, Longitude | 37.82708, -113.13708 |
| Generation Dates on File | Dec 2016 to May 2026 |
| Initial Operation Date | December 2016 |
| Annual Generation | 228.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 15-959-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | PacifiCorp - East (PACE) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | PacifiCorp (14354) UT |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator TPP Details Operating December 2016
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 80 MW |
| Summer Capacity | 80 MW |
| Winter Capacity | 80 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2016 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 107.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Three Peaks Power Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| CRE-Three Peaks Utah LLC | P.O. Box 2576, Boise, ID 83701 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #398 | Antelope Expansion 2 | Lancaster, CA | 234.0 GWh |
| #399 | RE Mustang LLC | Lemoore, CA | 220.8 GWh |
| #400 | Galloway 2 Solar Farm | Paint Rock, TX | 231.9 GWh |
| #401 | Oak Trail Solar, LLC | Moyock, NC | 231.7 GWh |
| #402 | OCI Alamo 7 LLC | Haskell, TX | 231.6 GWh |
| #403 | Enterprise Solar, LLC | Newcastle, UT | 231.2 GWh |
| #404 | SR Clay, LLC | Fort Gaines, GA | 230.9 GWh |
| #405 | Dodson Creek Solar, LLC | Hillsboro, OH | 230.5 GWh |
| #406 | New Madrid Solar, LLC | Marston, MO | 229.7 GWh |
| #407 | Dressor Plains Solar, LLC | Herrick, IL | 228.9 GWh |
| #409 | Ivanpah 2 | Nipton, CA | 236.1 GWh |
| #410 | Sauk Solar Park | Union City, MI | 228.5 GWh |
| #411 | Felina | Fabens, TX | 228.2 GWh |
| #412 | Prairie Mist Solar | Montrose, AR | 228.2 GWh |
| #413 | Roadrunner Solar and BESS | Cochise, AZ | 219.3 GWh |
| #414 | Assembly Solar II LLC | Lennon, MI | 226.3 GWh |
| #415 | Albemarle Beach Solar | Roper, NC | 225.7 GWh |
| #416 | East Pecos Solar | McCamey, TX | 225.1 GWh |
| #417 | Prairie State Solar Project | Swanwick Township, IL | 224.3 GWh |
| #418 | West of the Pecos Solar | TBD, TX | 224.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Three Peaks Power.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Appaloosa Solar I | Cedar City, UT | 200.8 GWh | 0.9 mi |
| Beryl Solar Plant | Beryl, UT | 6.5 GWh | 30.7 mi |
| Buckhorn Solar Plant | Paragonah, UT | 5.5 GWh | 25.9 mi |
| Cedar Valley Solar Plant | Cedar City, UT | 6.2 GWh | 2.9 mi |
| Cove Mountain Solar | Beryl, UT | 161.8 GWh | 29.9 mi |
| Cove Mountain Solar 2 | Beryl, UT | 330.5 GWh | 30.3 mi |
| Enterprise Solar, LLC | Newcastle, UT | 231.2 GWh | 29 mi |
| Fiddler's Canyon #1 | Cedar City, UT | 7.3 GWh | 8.3 mi |
| Fiddler's Canyon #2 | Cedar City, UT | 6.7 GWh | 8.3 mi |
| Fiddler's Canyon 3 | Cedar City, UT | 7.4 GWh | 7.9 mi |
| Granite Mountain Solar East, LLC | Cedar City, UT | 212.5 GWh | 6.1 mi |
| Granite Mountain Solar West, LLC | Cedar City, UT | 131.6 GWh | 10.3 mi |
| Iron Springs Solar, LLC | Cedar City, UT | 219.2 GWh | 7.4 mi |
| Laho Solar Plant | Milford, UT | 6.4 GWh | 32.6 mi |
| Quichapa 1 | Cedar City, UT | 7.4 GWh | 12.5 mi |
| Quichapa 2 | Cedar City, UT | 7.6 GWh | 11.4 mi |
| Quichapa 3 | Cedar City, UT | 7.2 GWh | 13.4 mi |
| Smithfield 3 | Milford, UT | 5.6 GWh | 27.5 mi |
| Thermo No 1 | Milford, UT | 56.3 GWh | 23.3 mi |
| Utah Red Hills Renewable Energy Park | Parowan, UT | 207.9 GWh | 13.3 mi |