Three Peaks Power
7856 N. Lund Highway, Cedar City, UT 84721Plant Summary Information
Three Peaks Power is ranked #17 out of 113 power plants in Utah in terms of total annual net electricity generation.
Three Peaks Power generated 44.8 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Three Peaks Power |
---|---|
Utility Name | Three Peaks Power LLC |
Location | Iron County, UT |
Initial Operation Date | December 2016 |
Last Update | Mar 2025 |
Annual Generation | 231.6 GWh |
Annual Consumption | 823.3 k MMBtu |
Ranked #2,185 out of 11,623 Power Plants Nationwide | |
Ranked #264 out of 5,666 Solar Power Plants Nationwide | |
Ranked #17 out of 113 Utah Power Plants | |
Ranked #4 out of 49 Utah Solar Power Plants | |
Fuel Types | Solar |
Map of Three Peaks Power
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Three Peaks Power.
Monthly Net Generation for Three Peaks Power
Three Peaks Power Details
Summary Information | |
---|---|
Plant Name | Three Peaks Power (60432) |
Plant Address | 7856 N. Lund Highway, Cedar City, UT 84721 |
Utility | Three Peaks Power LLC (60245) |
Latitude, Longitude | 37.82708, -113.13708 |
Generation Dates on File | Dec 2016 to Mar 2025 |
Initial Operation Date | December 2016 |
Annual Generation | 231.6 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 15-959-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | PacifiCorp - East (PACE) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | PacifiCorp (14354) UT |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator TPP Details Operating December 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 80 MW |
Summer Capacity | 80 MW |
Winter Capacity | 80 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | December 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 107.8 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Three Peaks Power Plant Owners
Owner Name | Address | Ownership |
---|---|---|
CRE-Three Peaks Utah LLC | P.O. Box 2576, Boise, ID 83701 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#254 | Maverick Solar 4, LLC | Desert Center, CA | 240.9 GWh |
#255 | SR Snipesville III | Denton, GA | 240.5 GWh |
#256 | Willow Spring Solar, LLC | Rosamond, CA | 239.4 GWh |
#257 | Oak Trail Solar, LLC | Moyock, NC | 238.9 GWh |
#258 | Desert Quartzite | Blythe, CA | 231.9 GWh |
#259 | Chesapeake Solar Project | Chesapeake, VA | 237.2 GWh |
#260 | Henrietta Solar Project | Lemoore, CA | 234.2 GWh |
#261 | CA Flats Solar 130, LLC | Shandon, CA | 233.3 GWh |
#262 | Prairie State Solar Project | Swanwick Township, IL | 233.2 GWh |
#263 | Comanche Solar | Pueblo, CO | 233.1 GWh |
#265 | SR Lumpkin | Lumpkin, GA | 230.0 GWh |
#266 | Assembly Solar II LLC | Lennon, MI | 229.9 GWh |
#267 | Dressor Plains Solar, LLC | Herrick, IL | 228.9 GWh |
#268 | Enterprise Solar, LLC | Newcastle, UT | 228.7 GWh |
#269 | Orion II Solar Project | Rosebud, TX | 228.6 GWh |
#270 | Galloway 2 Solar Farm | Paint Rock, TX | 228.2 GWh |
#271 | Lockhart Solar PV, LLC | Hinkley, CA | 227.7 GWh |
#272 | Briar Creek Solar 1 | Corsicana, TX | 225.5 GWh |
#273 | SR Clay, LLC | Fort Gaines, GA | 224.1 GWh |
#274 | AP Sunray LLC | Knippa, TX | 222.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Three Peaks Power.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Appaloosa Solar I | Cedar City, UT | 73.1 GWh | 0.9 mi |
Beryl Solar Plant | Beryl, UT | 6.1 GWh | 30.7 mi |
Blue Mountain Biogas | Milford, UT | 12.0 MWh | 25.5 mi |
Buckhorn Solar Plant | Paragonah, UT | 5.8 GWh | 25.9 mi |
Cedar Valley Solar Plant | Cedar City, UT | 5.9 GWh | 2.9 mi |
Cove Mountain Solar | Beryl, UT | 158.2 GWh | 29.9 mi |
Cove Mountain Solar 2 | Beryl, UT | 317.5 GWh | 30.3 mi |
Enterprise Solar, LLC | Newcastle, UT | 228.7 GWh | 29 mi |
Fiddler's Canyon #1 | Cedar City, UT | 6.9 GWh | 8.3 mi |
Fiddler's Canyon #2 | Cedar City, UT | 6.9 GWh | 8.3 mi |
Fiddler's Canyon 3 | Cedar City, UT | 7.3 GWh | 7.9 mi |
Granite Mountain Solar East, LLC | Cedar City, UT | 214.0 GWh | 6.1 mi |
Granite Mountain Solar West, LLC | Cedar City, UT | 128.5 GWh | 10.3 mi |
Iron Springs Solar, LLC | Cedar City, UT | 219.3 GWh | 7.4 mi |
Quichapa 1 | Cedar City, UT | 7.6 GWh | 12.5 mi |
Quichapa 2 | Cedar City, UT | 7.4 GWh | 11.4 mi |
Quichapa 3 | Cedar City, UT | 7.5 GWh | 13.4 mi |
Smithfield 3 | Milford, UT | 2.0 GWh | 27.5 mi |
Thermo No 1 | Milford, UT | 54.8 GWh | 23.3 mi |
Utah Red Hills Renewable Energy Park | Parowan, UT | 189.8 GWh | 13.3 mi |