10125 E Cronk Road, Lennon, MI 48449Plant Summary Information
Assembly Solar II LLC is ranked #49 out of 252 power plants in Michigan in terms of total annual net electricity generation.
Assembly Solar II LLC generated 39.7 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Assembly Solar II LLC |
---|---|
Utility Name | Assembly Solar II LLC |
Location | Shiawassee County, MI |
Initial Operation Date | December 2021 |
Last Update | Mar 2025 |
Annual Generation | 229.9 GWh |
Annual Consumption | 830.4 k MMBtu |
Ranked #2,192 out of 11,623 Power Plants Nationwide | |
Ranked #266 out of 5,666 Solar Power Plants Nationwide | |
Ranked #49 out of 252 Michigan Power Plants | |
Ranked #2 out of 58 Michigan Solar Power Plants | |
Fuel Types | Solar |
Map of Assembly Solar II LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Assembly Solar II LLC.
Monthly Net Generation for Assembly Solar II LLC
Assembly Solar II LLC Details
Summary Information | |
---|---|
Plant Name | Assembly Solar II LLC (63538) |
Plant Address | 10125 E Cronk Road, Lennon, MI 48449 |
Utility | Assembly Solar II LLC (63253) |
Latitude, Longitude | 43.04372, -83.95998 |
Generation Dates on File | Dec 2021 to Mar 2025 |
Initial Operation Date | December 2021 |
Annual Generation | 229.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | RFC |
Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Michigan Electric Transmission Company, (56163) |
Grid Voltage | 138.00 kV |
Energy Storage | No |
Generator AS2 Details Operating December 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 110 MW |
Summer Capacity | 110 MW |
Winter Capacity | 110 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 90 |
DC Net Capacity | 161.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Assembly Solar II LLC Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#256 | Willow Spring Solar, LLC | Rosamond, CA | 239.4 GWh |
#257 | Oak Trail Solar, LLC | Moyock, NC | 238.9 GWh |
#258 | Desert Quartzite | Blythe, CA | 231.9 GWh |
#259 | Chesapeake Solar Project | Chesapeake, VA | 237.2 GWh |
#260 | Henrietta Solar Project | Lemoore, CA | 234.2 GWh |
#261 | CA Flats Solar 130, LLC | Shandon, CA | 233.3 GWh |
#262 | Prairie State Solar Project | Swanwick Township, IL | 233.2 GWh |
#263 | Comanche Solar | Pueblo, CO | 233.1 GWh |
#264 | Three Peaks Power | Cedar City, UT | 231.6 GWh |
#265 | SR Lumpkin | Lumpkin, GA | 230.0 GWh |
#267 | Dressor Plains Solar, LLC | Herrick, IL | 228.9 GWh |
#268 | Enterprise Solar, LLC | Newcastle, UT | 228.7 GWh |
#269 | Orion II Solar Project | Rosebud, TX | 228.6 GWh |
#270 | Galloway 2 Solar Farm | Paint Rock, TX | 228.2 GWh |
#271 | Lockhart Solar PV, LLC | Hinkley, CA | 227.7 GWh |
#272 | Briar Creek Solar 1 | Corsicana, TX | 225.5 GWh |
#273 | SR Clay, LLC | Fort Gaines, GA | 224.1 GWh |
#274 | AP Sunray LLC | Knippa, TX | 222.3 GWh |
#275 | Wapello Solar LLC | Wapello, IA | 222.2 GWh |
#276 | Fish Springs | Reno, NV | 219.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Assembly Solar II LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Assembly Solar III | Lennon, MI | 165.0 GWh | 1.7 mi |
Assembly Solar Project | Venice Township, MI | 103.7 GWh | 1.6 mi |
Beebe 1B | Ithaca, MI | 119.0 GWh | 30.9 mi |
Bingham Solar, LLC | St. Johns, MI | 38.4 GWh | 28.8 mi |
Blue Elk VII Solar, LLC | Flint, MI | 474.0 MWh | 20 mi |
Brent Run Generating Station | Montrose, MI | 43.4 GWh | 10.8 mi |
Captain Solar, LLC | Mt. Morris, MI | 3.7 GWh | 9.8 mi |
Coldwater Solar, LLC | Flint, MI | 3.4 GWh | 9.8 mi |
Geddes 1 Solar, LLC | Saginaw, MI | 4.0 GWh | 28.1 mi |
Geddes 2 Solar, LLC | Saginaw, MI | 3.9 GWh | 27.7 mi |
Genesee Power Station LP | Flint, MI | 114.8 GWh | 14.9 mi |
Grand Blanc Generating Station | Grand Blanc, MI | 51.4 GWh | 15.1 mi |
Interchange Solar, LLC | Mt. Morris, MI | 3.6 GWh | 10.3 mi |
Jack Francis Solar, LLC | Clio, MI | 3.8 GWh | 15.9 mi |
Lennon Generating | Lennon, MI | 27.3 GWh | 4.4 mi |
Lyons Road | Owosso, MI | 36.9 GWh | 10.7 mi |
May Shannon Solar, LLC | Clio, MI | 3.8 GWh | 15.5 mi |
Midcontinent Solar, LLC | Owosso, MI | 795.0 MWh | 11.2 mi |
Peoples Generating Station | Ann Arbor, MI | 17.1 GWh | 17 mi |
Venice Resources Gas Recovery | Lennon, MI | 11.2 GWh | 4.1 mi |