Martin County Solar Project, LLC
1441 Old Martiki Road, Pilgrim, KY 41231Plant Summary Information
Martin County Solar Project, LLC is ranked #28 out of 59 power plants in Kentucky in terms of total annual net electricity generation.
Martin County Solar Project, LLC generated 29.9 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | Martin County Solar Project, LLC |
|---|---|
| Utility Name | Martin County Solar Project, LLC |
| Location | Martin County, KY |
| Initial Operation Date | December 2024 |
| Last Update | Feb 2026 |
| Annual Generation | 211.5 GWh |
| Annual Consumption | 761.0 k MMBtu |
| Ranked #2,430 out of 12,637 Power Plants Nationwide | |
| Ranked #406 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #28 out of 59 Kentucky Power Plants | |
| Ranked #4 out of 17 Kentucky Solar Power Plants | |
| Fuel Types | Solar |
Map of Martin County Solar Project, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Martin County Solar Project, LLC.
Monthly Net Generation for Martin County Solar Project, LLC
Monthly Plant Fuel Consumption for Martin County Solar Project, LLC
Martin County Solar Project, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Martin County Solar Project, LLC (66646) |
| Plant Address | 1441 Old Martiki Road, Pilgrim, KY 41231 |
| Utility | Martin County Solar Project, LLC (65671) |
| Latitude, Longitude | 37.76545, -82.47413 |
| Generation Dates on File | Dec 2024 to Feb 2026 |
| Initial Operation Date | December 2024 |
| Annual Generation | 211.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | PJM Interconnection, LLC (PJM) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Kentucky Power Co (22053) KY |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator USMTC Details Operating December 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 111 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 111 MW |
| Winter Capacity | 111 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2024 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 180 |
| DC Net Capacity | 143.69 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Martin County Solar Project, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #396 | Happy Solar 1 | Searcy, AR | 216.4 GWh |
| #397 | BPL Crown Solar LLC | Chilton, TX | 214.7 GWh |
| #398 | Lamesa Solar | Lamesa, TX | 214.0 GWh |
| #399 | Chicot Solar | Lake Village, AR | 213.4 GWh |
| #400 | Black Bear Solar 1 | Montgomery, AL | 213.3 GWh |
| #401 | Orange Grove | Jim Wells, TX | 212.6 GWh |
| #402 | Elektron Solar, LLC | Grantsville, UT | 212.3 GWh |
| #403 | BPL Sol Solar LLC | Chilton, TX | 211.9 GWh |
| #404 | Escalante Solar II, LLC | Milford, UT | 211.7 GWh |
| #405 | Iron Springs Solar, LLC | Cedar City, UT | 211.6 GWh |
| #407 | Fern Solar LLC | Battleboro, NC | 211.4 GWh |
| #408 | Escalante Solar I, LLC | Milford, UT | 211.3 GWh |
| #409 | Copper Mountain Solar 4, LLC | Boulder City, NV | 211.3 GWh |
| #410 | Badger Hollow II | Cobb, WI | 211.2 GWh |
| #411 | Rocket Solar, LLC | Corinne, UT | 210.6 GWh |
| #412 | Walnut Bend Solar Station PV | Moro, AR | 209.4 GWh |
| #413 | Riverstart Solar Park III | Modoc, IN | 209.1 GWh |
| #414 | Escalante Solar III, LLC | Milford, UT | 208.9 GWh |
| #415 | Utah Red Hills Renewable Energy Park | Parowan, UT | 208.6 GWh |
| #416 | Crossett Solar | Crossett, AR | 208.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Martin County Solar Project, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Big Sandy | Louisa, KY | 1.1 TWh | 29.1 mi |
| Big Sandy Peaker Plant | Kenona, WV | 285.3 GWh | 40.5 mi |
| Ceredo Generating Station | Huntington, WV | 775.8 GWh | 41.8 mi |
| Clinch River | Cleveland, VA | 245.1 GWh | 59.4 mi |
| Glen Ferris Hydro | Gauley Bridge, WV | 14.1 GWh | 73.5 mi |
| Green Valley LFGTE | Ashland, KY | 18.8 GWh | 47.3 mi |
| Greenup Hydro | Franklin Furnace, OH | 261.5 GWh | 64.4 mi |
| Hanging Rock Energy Facility | Ironton, OH | 10.3 TWh | 58.3 mi |
| Haverhill North Cogeneration Facility | Franklin Furnace, OH | 325.4 GWh | 60.6 mi |
| Hawks Nest Hydro | Gauley Bridge, WV | 433.8 GWh | 75.5 mi |
| John E Amos | St Albans, WV | 8.3 TWh | 60.3 mi |
| London | Handley, WV | 72.9 GWh | 67 mi |
| Marmet | Marmet, WV | 67.4 GWh | 59.7 mi |
| Mineral Gap | Wise, VA | 4.9 GWh | 53.2 mi |
| Morehead Generating Facility | Morehead, KY | 6.3 GWh | 65.3 mi |
| New River Clean Energy | Beckley, WV | 7.6 GWh | 71.7 mi |
| Riverside Generating LLC | Catlettsburg, KY | 837.0 GWh | 30.3 mi |
| Virginia City Hybrid Energy Center | St. Paul, VA | 2.1 TWh | 59.1 mi |
| Winfield | Winfield, WV | 84.4 GWh | 60.8 mi |
| Wolf Hills Energy | Bristol, VA | 177.8 GWh | 78.7 mi |