Briscoe Wind Farm
9947 County Road F, Silverton, TX 79257Plant Summary Information
Briscoe Wind Farm is ranked #124 out of 217 wind farms in Texas in terms of total annual net electricity generation.
Briscoe Wind Farm generated 126.6 GWh during the 3-month period between September 2022 to December 2022.
Plant Name | Briscoe Wind Farm |
---|---|
Utility Name | Briscoe Wind Farm, LLC |
Location | Briscoe County, TX |
Initial Operation Date | October 2015 |
Last Update | Dec 2022 |
Annual Generation | 471.8 GWh |
Annual Consumption | 1.8 M MMBtu |
Ranked #1,413 out of 11,455 Power Plants Nationwide | |
Ranked #397 out of 1,337 Wind Power Plants Nationwide | |
Ranked #258 out of 726 Texas Power Plants | |
Ranked #124 out of 217 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Capital Dynamics (2014 to 2021) Briscoe Wind Farm, LLC (2022 to 2022) |
Map of Briscoe Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Briscoe Wind Farm.
Monthly Net Generation for Briscoe Wind Farm
Briscoe Wind Farm Details
Summary Information | |
---|---|
Plant Name | Briscoe Wind Farm (59734) |
Plant Address | 9947 County Road F Silverton, TX 79257 |
Utility | Briscoe Wind Farm, LLC (65757) |
Latitude, Longitude | 34.43227, -101.23723 |
Generation Dates on File | Oct 2015 to Dec 2022 |
Initial Operation Date | October 2015 |
Annual Generation | 471.8 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | AEP Texas North Company (20404) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator BFW Details Operating October 2015
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 150 MW |
Summer Capacity | 150 MW |
Winter Capacity | 150 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Turbines/Hydrokinetic Buoys | 81 |
Turbine Details | |
Number Of Turbines | 81 |
---|---|
Predominant Turbine Manufacturer | GE |
Predominant Turbine Model Number | 1.85-87 |
Design Wind Speed | 19.8 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 263 |
Briscoe Wind Farm Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#387 | Glass Sands Wind Facility | Sulphur, OK | 484.0 GWh |
#388 | Inadale Wind Farm LLC Hybrid | Roscoe, TX | 482.0 GWh |
#389 | Walleye Wind | Beaver Creek, MN | 483.0 GWh |
#390 | Post Rock Wind Power Project, LLC | Ellsworth, KS | 481.4 GWh |
#391 | Minco Wind IV, LLC | Hinton, OK | 481.1 GWh |
#392 | McAdoo Wind Energy LLC | McAdoo, TX | 480.5 GWh |
#393 | Rocksprings | Del Rio, TX | 479.2 GWh |
#394 | Big Horn Wind Project | Bickelton, WA | 479.1 GWh |
#395 | Prairie Rose Wind Farm | Hardwick, MN | 478.9 GWh |
#396 | Gunsight Mountain Wind Energy LLC | Big Spring, TX | 477.4 GWh |
#398 | Rugby Wind Power Project | Barton, ND | 469.3 GWh |
#399 | Voyager Wind II | Mojave, CA | 465.6 GWh |
#400 | Baffin Wind | Sarita, TX | 464.8 GWh |
#401 | Blue Canyon Windpower II | Carnegie, OK | 462.4 GWh |
#402 | Blue Summit Wind LLC | Vernon, TX | 462.4 GWh |
#403 | Post Oak Wind LLC | Abilene, TX | 462.3 GWh |
#404 | Keechi Wind | Jacksboro, TX | 460.9 GWh |
#405 | Polaris Wind Park | North Star Township, MI | 460.6 GWh |
#406 | Victory Wind Farm | Westside, IA | 460.6 GWh |
#407 | Baldwin Wind LLC | Wilton, ND | 460.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Briscoe Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antelope Station | Abernathy, TX | 266.6 GWh | 52.3 mi |
Astra Wind Farm | Happy, TX | 607.0 GWh | 51.9 mi |
Colbeck's Corner, LLC | Groom, TX | 915.9 GWh | 56.9 mi |
Cotton Plains Wind Farm | Floydada, TX | 208.5 GWh | 25.9 mi |
Elk Station | Abernathy, TX | 739.5 GWh | 52.3 mi |
Grandview Wind Farm, LLC | Panhandle, TX | 962.5 GWh | 55.9 mi |
Hale Community Wind Farm | Plainview, TX | 2.1 TWh | 45.3 mi |
Longhorn Wind | Silverton, TX | 823.7 GWh | 8.4 mi |
Lorenzo Wind | Lorenzo, TX | 375.6 GWh | 53.3 mi |
McAdoo Wind Energy LLC | McAdoo, TX | 480.5 GWh | 49.5 mi |
Old Settler Wind | Floydada, TX | 595.5 GWh | 25.9 mi |
Pleasant Hill Wind Energy Project | Lorenzo, TX | 28.1 GWh | 50 mi |
Ralls Wind Farm | Ralls, TX | 13.9 GWh | 54 mi |
Route 66 Wind Plant | Panhandle, TX | 578.4 GWh | 54.6 mi |
Salt Fork Wind Project, LLC | Clarendon, TX | 746.2 GWh | 54.6 mi |
South Plains II | Lockney, TX | 1.1 TWh | 18.2 mi |
South Plains Wind Phase I | Floydada, TX | 610.3 GWh | 24.8 mi |
UL Advanced Wind Turbine Test Facility | Canyon, TX | 8.5 GWh | 48.2 mi |
Wake Wind Energy Center | Floydada, TX | 1.1 TWh | 42.7 mi |
Whirlwind Energy Center | Floydada, TX | 202.0 GWh | 24 mi |