Longhorn Wind
120 CR 17, Silverton, TX 79201Plant Summary Information
Longhorn Wind is ranked #50 out of 217 wind farms in Texas in terms of total annual net electricity generation.
Longhorn Wind generated 277.1 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Longhorn Wind |
---|---|
Utility Name | EDF Renewable Asset Holdings, Inc. |
Location | Briscoe County, TX |
Initial Operation Date | May 2015 |
Last Update | Feb 2024 |
Annual Generation | 823.7 GWh |
Annual Consumption | 2.8 M MMBtu |
Ranked #893 out of 11,455 Power Plants Nationwide | |
Ranked #153 out of 1,337 Wind Power Plants Nationwide | |
Ranked #147 out of 726 Texas Power Plants | |
Ranked #50 out of 217 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
EDF Renewable Services Inc (2013 to 2013) EDF Renewable Asset Holdings, Inc. (2014 to 2022) |
Map of Longhorn Wind
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Longhorn Wind.
Monthly Net Generation for Longhorn Wind
Longhorn Wind Details
Summary Information | |
---|---|
Plant Name | Longhorn Wind (58772) |
Plant Address | 120 CR 17 Silverton, TX 79201 |
Utility | EDF Renewable Asset Holdings, Inc. (57170) |
Latitude, Longitude | 34.31111, -101.25111 |
Generation Dates on File | May 2015 to Feb 2024 |
Initial Operation Date | May 2015 |
Annual Generation | 823.7 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Sharyland Utilities LP (17008) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator GEN1 Details Operating May 2015
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 100 |
Turbine Details | |
Number Of Turbines | 100 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V100-2.0 |
Design Wind Speed | 19 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 262.4 |
Longhorn Wind Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#143 | Javelina Wind Energy II, LLC | MIRANDO, TX | 843.4 GWh |
#144 | West Raymond Wind Farm LLC | Lyford, TX | 842.4 GWh |
#145 | Cimarron Bend Wind Project II, LLC | Minneola, KS | 842.4 GWh |
#146 | Crowned Ridge Wind II Energy Center | Watertown, SD | 840.4 GWh |
#147 | Pioneer Prairie Wind Farm | McIntire, IA | 840.4 GWh |
#148 | Upstream Wind Energy LLC | Neligh, NE | 835.1 GWh |
#149 | Crocker Wind Farm | Conde, SD | 834.3 GWh |
#150 | Freeborn Wind Farm | Glenville, MN | 834.3 GWh |
#151 | Plymouth Wind | Remsen, IA | 830.0 GWh |
#152 | Walnut Ridge Wind Farm | Sheffield, IL | 825.8 GWh |
#154 | Southern Hills Wind Farm | Creston, IA | 823.5 GWh |
#155 | Waverly Wind Farm LLC | Waverly, KS | 821.9 GWh |
#156 | Limon III Wind LLC | Limon, CO | 821.6 GWh |
#157 | Cross Winds Energy Park | Unionville, MI | 821.4 GWh |
#158 | Peetz Table Wind Energy | Peetz, CO | 821.2 GWh |
#159 | Tucannon River Wind Farm | Dayton, WA | 820.7 GWh |
#160 | Griffin Trail Wind | E Seymour, TX | 820.5 GWh |
#161 | Live Oak Wind Project | Eldorado, TX | 817.9 GWh |
#162 | Pattern Gulf Wind | Armstrong, TX | 816.5 GWh |
#163 | Blue Creek Wind Project | Paulding, OH | 814.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Longhorn Wind.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Antelope Station | Abernathy, TX | 266.6 GWh | 45.8 mi |
Astra Wind Farm | Happy, TX | 607.0 GWh | 55.5 mi |
Briscoe Wind Farm | Silverton, TX | 471.8 GWh | 8.4 mi |
Cotton Plains Wind Farm | Floydada, TX | 208.5 GWh | 17.7 mi |
Elk Station | Abernathy, TX | 739.5 GWh | 45.8 mi |
Hale Community Wind Farm | Plainview, TX | 2.1 TWh | 38.6 mi |
J Robert Massengale | Lubock, TX | 17.1 GWh | 59.4 mi |
Jones | Lubbock, TX | 2.0 TWh | 61.2 mi |
Lorenzo Wind | Lorenzo, TX | 375.6 GWh | 45.1 mi |
McAdoo Wind Energy LLC | McAdoo, TX | 480.5 GWh | 41.9 mi |
Old Settler Wind | Floydada, TX | 595.5 GWh | 17.7 mi |
Pleasant Hill Wind Energy Project | Lorenzo, TX | 28.1 GWh | 41.7 mi |
PYCO Industries, Inc. Wind Farm | Lubbock, TX | 551.2 MWh | 60.9 mi |
Ralls Wind Farm | Ralls, TX | 13.9 GWh | 45.6 mi |
South Plains II | Lockney, TX | 1.1 TWh | 10.8 mi |
South Plains Wind Phase I | Floydada, TX | 610.3 GWh | 16.5 mi |
TX Hereford Wind | Hereford, TX | 766.0 GWh | 60.6 mi |
UL Advanced Wind Turbine Test Facility | Canyon, TX | 8.5 GWh | 54.5 mi |
Wake Wind Energy Center | Floydada, TX | 1.1 TWh | 34.7 mi |
Whirlwind Energy Center | Floydada, TX | 202.0 GWh | 16.7 mi |