Green Pastures Wind II
4278 CR 140, Seymour, TX 76380Plant Summary Information
Green Pastures Wind II is ranked #175 out of 227 wind farms in Texas in terms of total annual net electricity generation.
Green Pastures Wind II generated 59.2 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Green Pastures Wind II |
|---|---|
| Utility Name | Green Pastures Wind II, LLC |
| Location | Knox County, TX |
| Initial Operation Date | October 2015 |
| Last Update | Dec 2024 |
| Annual Generation | 291.1 GWh |
| Annual Consumption | 1.1 M MMBtu |
| Ranked #2,028 out of 12,332 Power Plants Nationwide | |
| Ranked #610 out of 1,358 Wind Power Plants Nationwide | |
| Ranked #391 out of 814 Texas Power Plants | |
| Ranked #175 out of 227 Texas Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
Capital Dynamics (2014 to 2016) Green Pastures Wind II, LLC (2017 to 2024) |
Map of Green Pastures Wind II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Green Pastures Wind II.
Monthly Net Generation for Green Pastures Wind II
Monthly Plant Fuel Consumption for Green Pastures Wind II
Green Pastures Wind II Details
| Summary Information | |
|---|---|
| Plant Name | Green Pastures Wind II (59733) |
| Plant Address | 4278 CR 140, Seymour, TX 76380 |
| Utility | Green Pastures Wind II, LLC (59502) |
| Latitude, Longitude | 33.64596, -99.53294 |
| Generation Dates on File | Nov 2015 to Dec 2024 |
| Initial Operation Date | October 2015 |
| Annual Generation | 291.1 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | AEP Texas North Company (20404) TX |
| Grid Voltage | 345.00 kV |
| Energy Storage | No |
Generator GPII Details Operating October 2015
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 150 MW |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 2015 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 50 |
| Turbine Details | |
| Number Of Turbines | 50 |
|---|---|
| Predominant Turbine Manufacturer | Acciona |
| Predominant Turbine Model Number | AW116/3000 |
| Design Wind Speed | 12 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 302 |
Green Pastures Wind II Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Acciona Energy USA Global, LLC | 55 East Monroe Street; Suite 1925, Chicago, IL 60603 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #600 | Turkey Track Wind Energy LLC | Blackwell, TX | 300.7 GWh |
| #601 | GSG LLC | West Brooklyn, IL | 298.7 GWh |
| #602 | Prairie Star Wind Farm | Grand Meadow, MN | 298.2 GWh |
| #603 | Northwest Ohio Wind | Haviland, OH | 297.1 GWh |
| #604 | Penascal Wind Power LLC | Sarita, TX | 296.7 GWh |
| #605 | Lane City Wind | Lane City, TX | 296.2 GWh |
| #606 | Elk River Wind | Beaumont, KS | 294.8 GWh |
| #607 | Bennington Wind | Minonk, IL | 294.3 GWh |
| #608 | Flat Ridge 5 | Harper, KS | 294.0 GWh |
| #609 | Tuscola Wind II LLC | Reese, MI | 291.9 GWh |
| #611 | Big Level Wind | Hector Township, PA | 290.4 GWh |
| #612 | Alta Wind Energy Center V | Mojave, CA | 288.4 GWh |
| #613 | New Harvest Wind Project LLC | Schleswig, IA | 287.5 GWh |
| #614 | Campbell County Wind Farm | Pollock, SD | 286.1 GWh |
| #615 | Cimarron Windpower II | Cimarron, KS | 284.9 GWh |
| #616 | MinnDakota Wind LLC | Ivanhoe, MN | 282.9 GWh |
| #617 | Elkhorn Valley Wind Farm | Union, OR | 282.9 GWh |
| #618 | NedPower Mount Storm | Mount Storm, WV | 281.1 GWh |
| #619 | Penascal II Wind Project LLC | Sarita, TX | 279.8 GWh |
| #620 | Shiloh IV Wind Project LLC | Birds Landing, CA | 278.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Green Pastures Wind II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.2 TWh | 36.4 mi |
| Blue Summit II Wind | Vernon, TX | 353.2 GWh | 40.2 mi |
| Blue Summit III Wind | Chilicothe, TX | 757.5 GWh | 36.3 mi |
| Diversion Wind Energy LLC | Seymour, TX | 738.1 GWh | 29.8 mi |
| El Campo Wind | Truscott, TX | 842.1 GWh | 12.6 mi |
| Electra Wind Farm | Oklaunion, TX | 828.7 GWh | 39.5 mi |
| Foard City Wind | Crowell, TX | 1.2 TWh | 22.1 mi |
| Green Pastures Wind I | Seymour, TX | 277.5 GWh | 7.1 mi |
| Griffin Trail Wind | E Seymour, TX | 703.2 GWh | 3.8 mi |
| Horse Creek Wind Farm | Weinert, TX | 811.9 GWh | 20.5 mi |
| Inertia Wind Project | Haskell, TX | 1.3 TWh | 31.9 mi |
| King Creek Wind Farm 1, LLC | Throckmorton, TX | 582.2 GWh | 26.4 mi |
| King Creek Wind Farm 2, LLC | Throckmorton, TX | 673.1 GWh | 33.1 mi |
| Lockett Windfarm | Vernon, TX | 686.1 GWh | 33.2 mi |
| Millers Branch Solar | TX | 85.5 GWh | 29.5 mi |
| Montgomery Ranch Wind Farm, LLC | Crowell, TX | 643.9 GWh | 15.3 mi |
| Seymour Hills Wind Project, LLC | Seymour, TX | 135.3 GWh | 20.2 mi |
| TG East | Truscott, TX | 988.7 GWh | 10.3 mi |
| Western Trail Wind, LLC | Electra, TX | 1.1 TWh | 30.4 mi |
| Willow Springs Wind Farm | Weinert, TX | 864.3 GWh | 21.4 mi |