Green Pastures Wind I
4278 CR 140, Seymour, TX 76380Plant Summary Information
Green Pastures Wind I is ranked #167 out of 221 wind farms in Texas in terms of total annual net electricity generation.
Green Pastures Wind I generated 82.1 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Green Pastures Wind I |
---|---|
Utility Name | Green Pastures Wind I, LLC |
Location | Baylor County, TX |
Initial Operation Date | April 2015 |
Last Update | Dec 2024 |
Annual Generation | 277.5 GWh |
Annual Consumption | 1.0 M MMBtu |
Ranked #1,994 out of 12,288 Power Plants Nationwide | |
Ranked #606 out of 1,353 Wind Power Plants Nationwide | |
Ranked #361 out of 788 Texas Power Plants | |
Ranked #167 out of 221 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
Capital Dynamics (2014 to 2016) Green Pastures Wind I, LLC (2017 to 2024) |
Map of Green Pastures Wind I
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Green Pastures Wind I.
Monthly Net Generation for Green Pastures Wind I
Green Pastures Wind I Details
Summary Information | |
---|---|
Plant Name | Green Pastures Wind I (59732) |
Plant Address | 4278 CR 140, Seymour, TX 76380 |
Utility | Green Pastures Wind I, LLC (59501) |
Latitude, Longitude | 33.62822, -99.41117 |
Generation Dates on File | Apr 2015 to Dec 2024 |
Initial Operation Date | April 2015 |
Annual Generation | 277.5 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | AEP Texas North Company (20404) TX |
Grid Voltage | 345.00 kV |
Energy Storage | No |
Generator GPI Details Operating April 2015
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 150 MW |
Summer Capacity | 150 MW |
Winter Capacity | 150 MW |
Minimum Load | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2015 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Solid Fuel Gasification | No |
Turbines/Hydrokinetic Buoys | 50 |
Multiple Fuels | No |
Turbine Details | |
Number Of Turbines | 50 |
---|---|
Predominant Turbine Manufacturer | Acciona |
Predominant Turbine Model Number | AW116/3000 |
Design Wind Speed | 12 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 302 |
Green Pastures Wind I Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Acciona Energy USA Global, LLC | 55 East Monroe Street; Suite 1925, Chicago, IL 60603 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#596 | Wheatridge 1 | Lexington, OR | 284.0 GWh |
#597 | MinnDakota Wind LLC | Ivanhoe, MN | 282.9 GWh |
#598 | Elkhorn Valley Wind Farm | Union, OR | 282.9 GWh |
#599 | NaturEner Glacier Wind Energy 2 | Ethridge, MT | 280.5 GWh |
#600 | Ball Hill Wind Energy, LLC | Forestville, NY | 280.2 GWh |
#601 | Caprock Wind Farm | San Jon, NM | 279.0 GWh |
#602 | Shiloh IV Wind Project LLC | Birds Landing, CA | 278.3 GWh |
#603 | Rail Splitter Wind Farm | Hopedale, IL | 278.1 GWh |
#604 | Northwest Ohio Wind | Haviland, OH | 280.0 GWh |
#605 | Sagebrush Power Partners | Ellensburg, WA | 277.8 GWh |
#607 | Prairie Breeze II | Elgin, NE | 277.4 GWh |
#608 | Brookfield Tehachapi 1 | Mojave, CA | 276.9 GWh |
#609 | Baffin Wind | Sarita, TX | 276.6 GWh |
#610 | Big Level Wind | Hector Township, PA | 276.5 GWh |
#611 | Goodnoe Hills | Goldendale, WA | 275.5 GWh |
#612 | Leaning Juniper | Arlington, OR | 275.2 GWh |
#613 | Notrees Windpower Hybrid | Goldsmith, TX | 272.3 GWh |
#614 | Charles City Wind Farm | Charles City, IA | 274.1 GWh |
#615 | High Plains | Rock River, WY | 274.1 GWh |
#616 | Twin Ridges Wind Farm | Meyersdale, PA | 273.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Green Pastures Wind I.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.2 TWh | 32.8 mi |
Blue Summit II Wind | Vernon, TX | 370.2 GWh | 41.5 mi |
Blue Summit III Wind | Chilicothe, TX | 756.7 GWh | 38.5 mi |
Diversion Wind Energy LLC | Seymour, TX | 234.1 GWh | 23.2 mi |
El Campo Wind | Truscott, TX | 798.4 GWh | 19.5 mi |
Electra Wind Farm | Oklaunion, TX | 828.7 GWh | 36.8 mi |
Foard City Wind | Crowell, TX | 1.2 TWh | 27.4 mi |
Green Pastures Wind II | Seymour, TX | 291.1 GWh | 7.1 mi |
Griffin Trail Wind | E Seymour, TX | 717.1 GWh | 9.9 mi |
Horse Creek Wind Farm | Weinert, TX | 811.9 GWh | 20.6 mi |
Inertia Wind Project | Haskell, TX | 1.2 TWh | 32.3 mi |
King Creek Wind Farm 1, LLC | Throckmorton, TX | 554.0 GWh | 25.1 mi |
King Creek Wind Farm 2, LLC | Throckmorton, TX | 603.2 GWh | 30.8 mi |
Lockett Windfarm | Vernon, TX | 716.0 GWh | 31.8 mi |
Montgomery Ranch Wind Farm, LLC | Crowell, TX | 178.7 GWh | 20.4 mi |
OCI Alamo 7 LLC | Haskell, TX | 245.3 GWh | 41.5 mi |
Seymour Hills Wind Project, LLC | Seymour, TX | 129.0 GWh | 13.1 mi |
TG East | Truscott, TX | 1.1 TWh | 16.7 mi |
Western Trail Wind, LLC | Electra, TX | 1.1 TWh | 25.2 mi |
Willow Springs Wind Farm | Weinert, TX | 869.6 GWh | 23.1 mi |