Inertia Wind Project
2930 US HWY 380 E, Haskell, TX 79521Plant Summary Information
Inertia Wind Project is ranked #25 out of 1,374 wind farms nationwide in terms of total annual net electricity generation.
Inertia Wind Project generated 329.5 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Inertia Wind Project |
|---|---|
| Utility Name | Inertia Wind Project, LLC |
| Location | Haskell County, TX |
| Initial Operation Date | January 2023 |
| Last Update | Dec 2025 |
| Annual Generation | 1.2 TWh |
| Annual Consumption | 4.6 M MMBtu |
| Ranked #654 out of 12,613 Power Plants Nationwide | |
| Ranked #25 out of 1,374 Wind Power Plants Nationwide | |
| Ranked #97 out of 816 Texas Power Plants | |
| Ranked #10 out of 227 Texas Wind Power Plants | |
| Fuel Types | Wind |
Map of Inertia Wind Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Inertia Wind Project.
Monthly Net Generation for Inertia Wind Project
Monthly Plant Fuel Consumption for Inertia Wind Project
Inertia Wind Project Details
| Summary Information | |
|---|---|
| Plant Name | Inertia Wind Project (65546) |
| Plant Address | 2930 US HWY 380 E, Haskell, TX 79521 |
| Utility | Inertia Wind Project, LLC (64847) |
| Latitude, Longitude | 33.18688, -99.59533 |
| Generation Dates on File | Jan 2023 to Dec 2025 |
| Initial Operation Date | January 2023 |
| Annual Generation | 1.2 TWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | TRE |
| Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Electric Transmission Texas LLC (50174) |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator WINER Details Operating January 2023
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 301 MW |
| Summer Capacity | 301 MW |
| Winter Capacity | 301 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 108 |
| Turbine Details | |
| Number Of Turbines | 108 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 2.82-127 |
| Design Wind Speed | 12 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 291 |
Inertia Wind Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #15 | Maverick Creek Wind | Eden, TX | 1.6 TWh |
| #16 | Highland Wind Project (IA) | Primghar, IA | 1.6 TWh |
| #17 | Fowler Ridge Wind Farm LLC | Fowler, IN | 1.5 TWh |
| #18 | Palo Alto Wind Farm | Emmetsburg, IA | 1.5 TWh |
| #19 | Grande Prairie Wind Farm | O'Neill, NE | 1.4 TWh |
| #20 | TB Flats | Medicine Bow, WY | 1.4 TWh |
| #21 | Clearwater Wind I | Miles City, MT | 1.3 TWh |
| #22 | North English | Montezuma, IA | 1.3 TWh |
| #23 | High Lonesome Wind Power, LLC Hybrid | Rankin, TX | 1.3 TWh |
| #24 | Beaver Creek Wind | Ogden, IA | 1.3 TWh |
| #26 | Santa Rita East | Barnhart, TX | 1.2 TWh |
| #27 | Jordan Creek Wind Farm, LLC | Judyville, IN | 1.2 TWh |
| #28 | Iron Star Wind Project | Dodge City, KS | 1.2 TWh |
| #29 | Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.2 TWh |
| #30 | Lacy Creek Wind Energy Center | Sterling City, TX | 1.2 TWh |
| #31 | Boswell Wind | Rock River, WY | 1.2 TWh |
| #32 | Red Cloud Wind LLC | Corona, NM | 1.2 TWh |
| #33 | Seven Cowboy Wind Project, LLC | Gage, OK | 1.2 TWh |
| #34 | Santa Rita Wind Energy | Big Lake, TX | 1.2 TWh |
| #35 | Tahoka Wind | Tahoka, TX | 1.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Inertia Wind Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| ANSON Solar Center, LLC | Anson, TX | 503.7 GWh | 32 mi |
| Azure Sky Solar | Haskell, TX | 536.8 GWh | 11.5 mi |
| Azure Sky Wind Project, LLC Hybrid | Throckmorton, TX | 1.2 TWh | 19.1 mi |
| El Campo Wind | Truscott, TX | 839.7 GWh | 38.4 mi |
| Green Pastures Wind I | Seymour, TX | 277.5 GWh | 32.3 mi |
| Green Pastures Wind II | Seymour, TX | 291.1 GWh | 31.9 mi |
| Griffin Trail Wind | E Seymour, TX | 696.6 GWh | 29.2 mi |
| Hackberry Wind Farm | Albany, TX | 325.7 GWh | 30.6 mi |
| Horse Creek Wind Farm | Weinert, TX | 811.9 GWh | 11.7 mi |
| King Creek Wind Farm 1, LLC | Throckmorton, TX | 560.1 GWh | 9.3 mi |
| King Creek Wind Farm 2, LLC | Throckmorton, TX | 646.0 GWh | 11.9 mi |
| Mesquite Wind Power LLC | Abilene, TX | 346.3 GWh | 39.2 mi |
| Montgomery Ranch Wind Farm, LLC | Crowell, TX | 633.9 GWh | 45.4 mi |
| OCI Alamo 7 LLC | Haskell, TX | 245.3 GWh | 10.4 mi |
| Post Oak Wind LLC | Abilene, TX | 414.0 GWh | 46.6 mi |
| Seymour Hills Wind Project, LLC | Seymour, TX | 119.3 GWh | 35.7 mi |
| TG East | Truscott, TX | 980.8 GWh | 38.9 mi |
| WAL536 | Abilene, TX | 245.0 MWh | 49.1 mi |
| Willow Springs Wind Farm | Weinert, TX | 870.6 GWh | 11.1 mi |
| Young Wind | Graham, TX | 1.6 TWh | 43.2 mi |