Buffalo Gap Wind Farm
10718 FM89, Merkel, TX 79536Plant Summary Information
Buffalo Gap Wind Farm is ranked #189 out of 221 wind farms in Texas in terms of total annual net electricity generation.
Buffalo Gap Wind Farm generated 46.1 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Buffalo Gap Wind Farm |
---|---|
Utility Name | AES Distributed Energy |
Location | Taylor County, TX |
Initial Operation Date | April 2006 |
Last Update | Dec 2024 |
Annual Generation | 179.0 GWh |
Annual Consumption | 663.7 k MMBtu |
Ranked #2,508 out of 12,288 Power Plants Nationwide | |
Ranked #762 out of 1,353 Wind Power Plants Nationwide | |
Ranked #425 out of 788 Texas Power Plants | |
Ranked #189 out of 221 Texas Wind Power Plants | |
Fuel Types | Wind |
Previous Operator |
AES Wind Generation Inc (2013 to 2021) AES Distributed Energy (2022 to 2024) |
Map of Buffalo Gap Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Buffalo Gap Wind Farm.
Monthly Net Generation for Buffalo Gap Wind Farm
Buffalo Gap Wind Farm Details
Summary Information | |
---|---|
Plant Name | Buffalo Gap Wind Farm (56240) |
Plant Address | 10718 FM89, Merkel, TX 79536 |
Utility | AES Distributed Energy (61012) |
Latitude, Longitude | 32.31156, -100.06159 |
Generation Dates on File | Apr 2006 to Dec 2024 |
Initial Operation Date | April 2006 |
Annual Generation | 179.0 GWh |
Fuel Types | Wind |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | TRE |
Balancing Authority | Electric Reliability Council of Texas, Inc. (ERCO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | AEP Texas Central Company (3278) TX |
Grid Voltage | 135.00 kV |
Energy Storage | No |
Generator 1 Details Operating April 2006
Technology | Onshore Wind Turbine |
---|---|
Prime Mover | Wind Turbine, Onshore |
Ownership | Single Owner |
Nameplate Capacity | 120.6 MW |
Summer Capacity | 120.6 MW |
Winter Capacity | 120.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2006 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Wind |
Turbines/Hydrokinetic Buoys | 67 |
Turbine Details | |
Number Of Turbines | 67 |
---|---|
Predominant Turbine Manufacturer | Vestas |
Predominant Turbine Model Number | V80-1.8 |
Design Wind Speed | 17 MPH |
Wind Quality Class | 2 - Medium Wind |
Turbine Hub Height Feet | 196.8 |
Buffalo Gap Wind Farm Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#752 | Shooting Star | Mullinville, KS | 187.2 GWh |
#753 | Beebe 1A | Ithaca, MI | 187.0 GWh |
#754 | Mountain View IV | North Palm Springs, CA | 186.8 GWh |
#755 | Locust Ridge II LLC | Shenandoah, PA | 184.1 GWh |
#756 | Casa Mesa Wind Energy Center Hybrid | House, NM | 183.6 GWh |
#757 | Golden Spread Panhandle Wnd Rch | Wilderado, TX | 181.7 GWh |
#758 | Kingdom Community Wind | Lowell, VT | 181.3 GWh |
#759 | Forest Creek Wind Farm LLC | Big Springs, TX | 180.9 GWh |
#760 | FPL Energy Oliver Wind II LLC | Center, ND | 180.9 GWh |
#761 | Hay Canyon Wind Power LLC | Wasco, OR | 179.8 GWh |
#763 | Perrin Ranch Wind LLC | Williams, AZ | 178.9 GWh |
#764 | Montgomery Ranch Wind Farm, LLC | Crowell, TX | 178.7 GWh |
#765 | Milford Wind Corridor Stage II LLC | Milford, UT | 178.6 GWh |
#766 | Cerro Gordo Wind Farm | Union, IA | 178.5 GWh |
#767 | Elk Wind Farm | Greeley, IA | 178.3 GWh |
#768 | Mountain Wind Power II LLC | Fort Bridger, WY | 177.2 GWh |
#769 | FPL Energy Oliver Wind I LLC | Center, ND | 176.8 GWh |
#770 | Elm Creek Wind LLC | Trimont, MN | 176.1 GWh |
#771 | Hawkeye Power Partners LLC | Garner, IA | 176.1 GWh |
#772 | Summit Winds | Livermore, CA | 175.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Buffalo Gap Wind Farm.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Buffalo Gap 2 Wind Farm | Merkel, TX | 372.6 GWh | 6.8 mi |
Buffalo Gap 3 Wind Farm | Nolan, TX | 302.2 GWh | 2.8 mi |
Callahan Divide Wind Energy Center | Tusocola, TX | 414.3 GWh | 2.4 mi |
Champion Wind Farm LLC | Roscoe, TX | 94.9 GWh | 34.8 mi |
HEB00070 | Abilene, TX | 231.0 MWh | 19.6 mi |
Holstein 1 Solar Farm | Wingate, TX | 386.0 GWh | 15.5 mi |
Horse Hollow Wind Energy Center | Wingate, TX | 2.5 TWh | 6.7 mi |
Inadale Wind Farm LLC Hybrid | Roscoe, TX | 335.1 GWh | 32.8 mi |
Maryneal Windpower | Maryneal, TX | 569.6 GWh | 26.3 mi |
Mesquite Star | Roscoe, TX | 1.2 TWh | 15.6 mi |
Post Oak Wind LLC | Abilene, TX | 408.2 GWh | 27.5 mi |
South Trent Wind Farm | Sweetwater, TX | 252.5 GWh | 7.7 mi |
Sweetwater Wind 1 LLC | Sweetwater, TX | 140.8 GWh | 16.5 mi |
Sweetwater Wind 2 LLC | Sweetwater, TX | 340.6 GWh | 18.2 mi |
Sweetwater Wind 3 LLC | Sweetwater, TX | 470.0 GWh | 21.1 mi |
Sweetwater Wind 4 LLC | Roscoe, TX | 636.6 GWh | 27.4 mi |
Sweetwater Wind 5 | Roscoe, TX | 163.2 GWh | 25.2 mi |
Trent Wind Farm | Trent, TX | 515.0 GWh | 13 mi |
Turkey Track Wind Energy LLC | Blackwell, TX | 300.7 GWh | 14.4 mi |
WAL536 | Abilene, TX | 245.0 MWh | 24.2 mi |