Bishop Hill II Wind Farm
13870 North 570th Avenue, Cambridge, IL 61238Plant Summary Information
Bishop Hill II Wind Farm is ranked #37 out of 59 wind farms in Illinois in terms of total annual net electricity generation.
Bishop Hill II Wind Farm generated 103.9 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Bishop Hill II Wind Farm |
|---|---|
| Utility Name | Bishop Hill Energy II, LLC |
| Location | Henry County, IL |
| Initial Operation Date | October 2012 |
| Last Update | Dec 2025 |
| Annual Generation | 334.4 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,910 out of 13,301 Power Plants Nationwide | |
| Ranked #569 out of 1,377 Wind Power Plants Nationwide | |
| Ranked #67 out of 542 Illinois Power Plants | |
| Ranked #37 out of 59 Illinois Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
MidAmerican Renewables LLC (2013 to 2014) Bishop Hill Energy II, LLC (2015 to 2025) |
Map of Bishop Hill II Wind Farm
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bishop Hill II Wind Farm.
Monthly Net Generation for Bishop Hill II Wind Farm
Monthly Plant Fuel Consumption for Bishop Hill II Wind Farm
Bishop Hill II Wind Farm Details
| Summary Information | |
|---|---|
| Plant Name | Bishop Hill II Wind Farm (58111) |
| Plant Address | 13870 North 570th Avenue, Cambridge, IL 61238 |
| Utility | Bishop Hill Energy II, LLC (59870) |
| Latitude, Longitude | 41.2325, -90.17417 |
| Generation Dates on File | Oct 2012 to Dec 2025 |
| Initial Operation Date | October 2012 |
| Annual Generation | 334.4 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 11103000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | SERC |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Ameren Illinois Company (56697) IL |
| Grid Voltage | 138.00 kV |
| Energy Storage | No |
Generator 1 Details Operating October 2012
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 81 MW |
| Summer Capacity | 81 MW |
| Winter Capacity | 81 MW |
| Minimum Load | 1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2012 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Wind |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Turbines/Hydrokinetic Buoys | 50 |
| Multiple Fuels | No |
| Turbine Details | |
| Number Of Turbines | 50 |
|---|---|
| Predominant Turbine Manufacturer | GE |
| Predominant Turbine Model Number | 1.6-100 |
| Design Wind Speed | 16.8 MPH |
| Wind Quality Class | 3 - Low Wind |
| Turbine Hub Height Feet | 328 |
Bishop Hill II Wind Farm Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #559 | Benton County Wind Farm | Earl Park, IN | 342.9 GWh |
| #560 | Los Vientos Wind 1A | Sebastian, TX | 341.3 GWh |
| #561 | High Plains | Rock River, WY | 341.2 GWh |
| #562 | Cimarron Wind Energy LLC | Cimmaron, KS | 340.2 GWh |
| #563 | Contrail Wind Farm | Bedford, IA | 339.1 GWh |
| #564 | Penascal II Wind Project LLC | Sarita, TX | 339.1 GWh |
| #565 | Hoopeston Wind LLC | Rossville, IL | 337.7 GWh |
| #566 | Buffalo Gap 3 Wind Farm | Nolan, TX | 337.7 GWh |
| #567 | MinnDakota Wind LLC | Ivanhoe, MN | 337.3 GWh |
| #568 | Goshen Phase II | Idaho Falls, ID | 337.1 GWh |
| #570 | Gratiot Farms Wind Project | Carson City, MI | 334.1 GWh |
| #571 | Bent Tree Wind Farm Phase 1 | Hartland, MN | 334.1 GWh |
| #572 | Duran Mesa LLC | Duran, NM | 334.0 GWh |
| #573 | Mower County Wind Energy Center | Grand Meadow, MN | 334.0 GWh |
| #574 | Mesquite Wind Power LLC | Abilene, TX | 332.7 GWh |
| #575 | Turkey Track Wind Energy LLC | Blackwell, TX | 331.4 GWh |
| #576 | Glacier Hills | Cambria, WI | 330.9 GWh |
| #577 | Michigan Wind 2 | Minden City, MI | 329.1 GWh |
| #578 | Oakfield Wind Project | City of Oakfield, ME | 328.7 GWh |
| #579 | Loraine Windpark Project LLC | Loraine, TX | 327.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bishop Hill II Wind Farm.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Agriwind | Tiskilwa, IL | 16.7 GWh | 29 mi |
| Bishop Hill Energy LLC | Cambridge, IL | 713.3 GWh | 3 mi |
| Bishop Hill III | Cambridge, IL | 431.8 GWh | 5.5 mi |
| Camp Grove Wind Farm | Wyoming, IL | 406.1 GWh | 29.5 mi |
| Crescent Ridge | Tiskilwa, IL | 199.2 GWh | 31.4 mi |
| Davenport Water Pollution Control Plant | Davenport, IA | 6.4 GWh | 29.6 mi |
| Elba Solar LLC | Williamsfield, IL | 4.3 GWh | 25.3 mi |
| Essex Solar | Wyoming, IL | 5.3 GWh | 24.9 mi |
| Galva Landfill | Galva, IL | 102.0 MWh | 8.3 mi |
| Geneseo | Geneseo, IL | 7.5 GWh | 15.2 mi |
| Goldenrod (IL) | Viola, IL | 6.4 GWh | 21.5 mi |
| Illinois PV Knox 3A | Galesburg, IL | 3.3 GWh | 24.4 mi |
| Illinois PV Knox 3B | Galesburg, IL | 3.0 GWh | 24.4 mi |
| Lone Tree Wind, LLC | Tiskilwa, IL | 286.9 GWh | 29.8 mi |
| Midland Wind | Kewane, IL | 356.9 GWh | 9.6 mi |
| Moline | Moline, IL | 20.8 GWh | 26.8 mi |
| Pope Creek Solar PV | Aledo, IL | 9.5 GWh | 29.1 mi |
| Princeville Solar, LLC | Princeville, IL | 293.0 MWh | 29.7 mi |
| Rocky Mountain Elk Solar Community Solar | Sheffield, IL | 108.0 MWh | 27 mi |
| Shissler Solar | Brimfield, IL | 847.0 MWh | 31.3 mi |