72506 180th Street, Grand Meadow, MN 55936Plant Summary Information
Mower County Wind Energy Center is ranked #31 out of 759 power plants in Minnesota in terms of total annual net electricity generation.
Mower County Wind Energy Center generated 103.0 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Mower County Wind Energy Center |
|---|---|
| Utility Name | Northern States Power Co - Minnesota |
| Location | Mower County, MN |
| Initial Operation Date | December 2006 |
| Last Update | Dec 2024 |
| Annual Generation | 343.3 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,789 out of 12,539 Power Plants Nationwide | |
| Ranked #533 out of 1,362 Wind Power Plants Nationwide | |
| Ranked #31 out of 759 Minnesota Power Plants | |
| Ranked #17 out of 125 Minnesota Wind Power Plants | |
| Fuel Types | Wind |
| Previous Operator |
FPL Energy Mower County LLC (2013 to 2020) Northern States Power Co - Minnesota (2021 to 2024) |
Map of Mower County Wind Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Mower County Wind Energy Center.
Monthly Net Generation for Mower County Wind Energy Center
Mower County Wind Energy Center Details
| Summary Information | |
|---|---|
| Plant Name | Mower County Wind Energy Center (56424) |
| Plant Address | 72506 180th Street, Grand Meadow, MN 55936 |
| Utility | Northern States Power Co - Minnesota (13781) |
| Latitude, Longitude | 43.61407, -92.59882 |
| Generation Dates on File | Dec 2006 to Dec 2024 |
| Initial Operation Date | December 2006 |
| Annual Generation | 343.3 GWh |
| Fuel Types | Wind |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | MRO |
| Balancing Authority | Midcontinent Independent Transmission System Operator, Inc.. (MISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Dairyland Power Coop (4716) |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator 1 Details Operating December 2006
| Technology | Onshore Wind Turbine |
|---|---|
| Prime Mover | Wind Turbine, Onshore |
| Ownership | Single Owner |
| Nameplate Capacity | 98.9 MW |
| Summer Capacity | 91.1 MW |
| Winter Capacity | 91.1 MW |
| Minimum Load | 4.9 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2006 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Wind |
| Turbines/Hydrokinetic Buoys | 43 |
| Turbine Details | |
| Number Of Turbines | 43 |
|---|---|
| Predominant Turbine Manufacturer | Siemens |
| Predominant Turbine Model Number | SWT-1.0-54 |
| Design Wind Speed | 19 MPH |
| Wind Quality Class | 2 - Medium Wind |
| Turbine Hub Height Feet | 262.5 |
Mower County Wind Energy Center Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Wind.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #523 | Duran Mesa LLC | Duran, NM | 351.3 GWh |
| #524 | Buffalo Gap 2 Wind Farm | Merkel, TX | 351.2 GWh |
| #525 | Hopkins Ridge Wind | Dayton, WA | 350.9 GWh |
| #526 | Tyler Bluff Wind Project, LLC | Muenster, TX | 350.4 GWh |
| #527 | Gratiot Farms Wind Project | Carson City, MI | 349.9 GWh |
| #528 | Crescent Wind Park | Hillsdale, MI | 349.6 GWh |
| #529 | Spring Valley Wind Project | Ely, NV | 348.7 GWh |
| #530 | Redbed Plains Wind Farm | Tuttle, OK | 346.6 GWh |
| #531 | Garden Wind LLC | Zearing, IA | 345.4 GWh |
| #532 | Cedro Hill Wind LLC | Bruni, TX | 344.5 GWh |
| #534 | Bent Tree Wind Farm Phase 1 | Hartland, MN | 343.0 GWh |
| #535 | Drift Sand Wind Project LLC | Rush Springs, OK | 341.7 GWh |
| #536 | Midland Wind | Kewane, IL | 341.2 GWh |
| #537 | Blue Sky Green Field Wind Project | Fond du Lac, WI | 340.8 GWh |
| #538 | Sweetwater Wind 2 LLC | Sweetwater, TX | 340.6 GWh |
| #539 | Fenton Wind Farm | Chandler, MN | 340.2 GWh |
| #540 | Bishop Hill II Wind Farm | Cambridge, IL | 339.9 GWh |
| #541 | Mesquite Wind Power LLC | Abilene, TX | 339.8 GWh |
| #542 | Cameron Wind 1 LLC | Rio Hondo, TX | 337.6 GWh |
| #543 | Shady Oaks Wind 2 | Compton, IL | 338.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Mower County Wind Energy Center.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Adams Wind Farm | Adams, MN | 20.2 GWh | 7.5 mi |
| Buffalo Center Wind LLC | Little Cedar, IA | 4.8 GWh | 17.7 mi |
| Crane Creek Wind Energy Center | Riceville, IA | 302.0 GWh | 16.2 mi |
| Fillmore County Solar Project | Spring Valley, MN | 75.6 GWh | 12.8 mi |
| Fountain | Fountain, MN | 6.3 GWh | 25.2 mi |
| Grand Meadow | Dexter, MN | 380.3 GWh | 9 mi |
| Hayfield Solar I LLC CSG | Hayfield, MN | 1.5 GWh | 23.5 mi |
| Hayfield Solar III LLC CSG | Hayfield, MN | 2.0 GWh | 24.8 mi |
| Louise Solar | Taopi, MN | 82.6 GWh | 5.5 mi |
| Maple City | Osage Township, IA | 3.1 GWh | 25 mi |
| Osage (IA) | Osage, IA | 5.6 GWh | 25.4 mi |
| Pioneer Prairie Wind Farm | McIntire, IA | 864.6 GWh | 9 mi |
| Pleasant Valley (MN) | Dexter, MN | 85.9 GWh | 13.5 mi |
| Pleasant Valley Wind Farm | Dexter, MN | 770.3 GWh | 15.7 mi |
| Prairie Star Wind Farm | Grand Meadow, MN | 298.2 GWh | 5.2 mi |
| Preston (MN) | Preston, MN | 163.0 MWh | 26 mi |
| Saratoga Wind Farm | Lime Springs, IA | 272.3 GWh | 19.6 mi |
| Spring Valley | Spring Valley, MN | 156.8 MWh | 11.6 mi |
| Turtle Creek Wind Farm LLC | St. Ansgar, IA | 725.5 GWh | 17.5 mi |
| Wapsipinicon Wind Project | Dexter, MN | 259.7 GWh | 13.5 mi |